NEES-Pile: Experimental and Computational Study of Pile Foundations Subjected to Liquefaction-Induced Lateral Spreading NEESPile 2-day-Workshop Aug. 20.

Slides:



Advertisements
Similar presentations
Structural Engineering and Earthquake Simulation Laboratory Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Advertisements

NEES-Pile: Experimental and Computational Study of Pile Foundations Subjected to Liquefaction-Induced Lateral Spreading COMPARISON BETWEEN CENTRIFUGE.
Oct-2012 – Aug-2014 Budget Status (*) Tempus IDEA– 3’rd Year Budget Planning Travel cost Mobility WP4 is still an on going activity Next mobility program.
1 NEES-Pile: Experimental and Computational Study of Pile Foundations Subjected to Liquefaction-Induced Lateral Spreading Topic for Wrap-up Discussion.
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) – Part A Experimental and Micromechanical Computational Study of Pile Foundations.
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Soil Pile Group Interaction in FB-MultiPier
Overview of the M&E of PHN Program’s Regional Workshop.
NEESGrid - A Collaborative Portal Study Charles Severance University of Michigan NEESGrid SI Team
SCHOOL OF INFORMATION UNIVERSITY OF MICHIGAN Symposium on Knowledge Environments for Science and Engineering National Science Foundation Nov , 2002.
Welcome and Overview Richard Anderson University of Washington June 30, 20081IUCEE: Welcome and Overview.
Welcome to Annecy A.Jeremie. Workshop rooms The sessions will take place in the « Salle des Sommets » (3rd floor round building). The coffee breaks will.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC Welcome and Logistics.
SALMAN BIN ABDULAZIZ UNIVERSITY INTERNATIONAL COLLABORATION PROGRAM & VISITING SCHOLAR PROGRAM PRESENTATION INTERNATIONAL COLLABORATION PROGRAM.
Unit 13 Lesson 1 Day by Day.
July 1-4, June 28 – July 4, parent package summary HOTEL INFORMATION: Best Western Lawnfield Inn 8434 Mentor Avenue US Mentor, Ohio, ,
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Structural Engineering and Earthquake Simulation Laboratory Experimental and Micromechanical Computational Study of Pile Foundations Subjected to Liquefaction-Induced.
1 NEES-Pile: Experimental and Computational Study of Pile Foundations Subjected to Liquefaction-Induced Lateral Spreading Topic for Wrap-up Discussion.
FTA EMS Institute Location: Roanoke, Virginia. Roanoke Regional Airport is approximately 7 minutes from the Hotel Roanoke and complimentary shuttle.
The 22 nd International Statistical Genetics Methods Workshop August 11 – 15, 2008 Leuven, Belgium Welcome.
RENSSELAER POLYTECHNIC INSTITUTE SOCIETY OF HISPANIC PROFESSIONAL ENGINEERS Welcome! ¡Bienvenidos!
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Arrival Morning Meeting/RTI 7:40- 8:30 Phonics 8:30-8:50 (Snack) at 8:50ish.
Facilities Steering Committee Meeting 6 Welcome!
Intervention at Washwood Heath Academy Mr Gifford Achievement Leader WHA s offering a comprehensive program of intervention to ensure your child achieves.
 I get up very early in the morning from Monday to Friday.
1 SG-1: Lateral Spreading – Observations and Analysis Raghudeep B., and S. Thevanayagam, UB Aug. 07, 2007, 2-4 pm; UB-VTC SG-1: Lateral Spreading – Observations.
Smarter ■ Faster ■ More Efficient WELCOME! Texas A&M Laserfiche Shared Service User Workshop Hosted by Texas A&M Information Technology, Laserfiche and.
Class A Centrifuge Prediction of future SG1 of Full Scale Test with Pile Foundation by Marcelo Gonzalez Tarek Abdoun Ricardo Dobry Rensselaer Polytechnic.
Welcome (back) to the GeoTEd Institute With support from: Hosted by: Extending Geospatial Technician Education Through Virginia’s Community Colleges (GTEVCC)
About me… Jessica de BloomJessica de Bloom Born in GermanyBorn in Germany Since 2012: Post-doc at UTASince 2012: Post-doc at UTA Field of expertiseField.
Multi-Site Soil-Structure-Foundation Interaction Test (MISST) PI: Bill Spencer, Illinois Co-PIs: Amr Elnashai, Dan Kuchma, Illinois Jim Ricles, Richard.
TEMPEST EXPRESS - 4 Singapore DETAILED DAILY SCHEDULE 20 Aug Aug 02.
Structural Engineering and Earthquake Simulation Laboratory SG-1: Lateral Spreading – Observations & Analysis Raghudeep B. & Thevanayagam S. 20 Aug 2007:
Liquefaction and Laminar Box Experimental Preparation Presented by: Mike Sampson.
PurposeDateTimeLocation Intro ClassJan. 27, :00 pmMusic Room CommunityFeb. 3, :00 pmMusic Room DiscipleshipFeb. 10, :00 pmMusic Room.
GIAN – Migrations Workshop Madrid, September 2012.
Structural Engineering and Earthquake Simulation Laboratory 1-g Pile Tests – Brief Plans 1-g Pile Tests – Brief Plans R. Bethapudi, S. Thevanayagam, UB.
CROP 2002 Summer Workshop July 15 – August 9, 2002 Gregory R. Snow Associate Professor |Department of Physics and Astronomy University of Nebraska, Lincoln.
General framework Monday October 13th Pair-transfer reactions Tuesday October 14th Morning: pair removal, breakup reactions Afternoon: pairing-interaction.
DAY 1 – ARRIVAL (MONDAY – 25 JAN 2016) Welcome to Singapore Airport Transfer Hotel Check-in Orientation Welcome Dinner.
PROJECT OVERVIEW AND UPDATE: NEESR-SG RESEARCH ON PILES SUBJECTED TO LATERAL SPREADING Ricardo Dobry Kickoff Meeting RPI, Nov. 19, 2005.
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
A Protocol for Tracking Mobile Targets using Sensor Networks H. Yang and B. Sikdar Department of Electrical, Computer and Systems Engineering Rensselaer.
WestJumpAQMS remaining dates and deliverables #1 Project website: May.
Welcome to Ecole Polytechnique! Welcome to POETIC6!
Training Schedule And Training Packages at Discounted Rates.
DOSAR II Workshop Goals and Organizations Jae Yu DOSAR II Workshop, UTA Mar. 30 – 31, 2006 Introduction Workshop Goals Workshop Organization.
Billy Coss Distributed Computing Dr. Lee.
+ Today’s Agenda Co-Teaching Institute. + End of Day Product #1 Classroom design plan (Poster Paper) Design your room (or suggestions for your room if.
Meeting organization info Krzysztof Wrona 4 th PaN-Data & CRISP Harmonization Meeting 21 – 22 January 2013 European XFEL, Hamburg 1.
Task 4: DEM Modeling of Soil-Pile System Status Report Claudia Medina Mourad Zeghal RPI, February 15, 2005.
Welcome at 36 th EUGridPMA meeting January 2016 Bratislava Ladislav Hluchý, Miroslav Dobrucký, Ján Astaloš Venue: Institute of Informatics, Slovak.
SURVEYING FOR INSPECTORS. Course Content Introduction Chapter 1 – Chapter 1 – Field Equipment Chapter 2 – Chapter 2 – Location Survey Chapter 3 – Chapter.
General Formulation for Surface and Embedded Foundations (Gazetas,1991) FIGURE XXX (MIWA, 20XX) A number of investigations have been done after earthquakes.
IELP 2016 Tentative Schedule Week 1
Garfield Park Baptist Church Sunday, June 4, 2017 FBC GREENWOOD
Postharvest Practices Synthesis and Evaluation workshop in Vientiane
Distance Learning: Virtual Room at the Experimental Field Station
Physics-based simulation for visual computing applications
Faculty Champion Meeting
Faculty Champion Meeting
Twenty Questions Subject: Time.
Goals of the meeting and logistics information
Welcome to Training at LAL
UW WRF mbar forecasts.
Logistics for workshop
Schedule and Session Layout
Presentation transcript:

NEES-Pile: Experimental and Computational Study of Pile Foundations Subjected to Liquefaction-Induced Lateral Spreading NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI Ricardo Dobry Claudia Medina Rensselaer Polytechnic Institute August 7 th, 2007

NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI JEC 3117, RPI, Troy, NY Monday August 20, 2007 Free Field Tests LG-0 and SG-1 Tuesday August 21, 2007 Current and Future Pile Research and Other Project Activities

NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI Monday August 20, 2007 Free Field Tests LG-0 and SG-1 Morning 8:30 - 8:50 amTests LG-0 and SG-1, related research, and objectives of meeting (Dobry) 8:50 - 9:00Questions and Discussion 9:00 - 9:301g tests LG-0 and SG-1, processing and interpretations (Theva) 9: :00Questions and Discussion 10: :30Coffee Break 10: :00Lateral spreading mechanism in Test SG-1 (Medina/Bennett) 11: :30Questions and Discussion 11: :00Visit to Centrifuge (Abdoun) 12:00 - 1:00 pmLunch (in the room)

NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI Monday August 20, 2007 Free Field Tests LG-0 and SG-1 Afternoon 1:00 - 1:30 pmCentrifuge simulation of tests LG-0 and SG-1 (Gonzalez/Abdoun) 1:30 - 2:00Questions and Discussion 2:00 - 2:30DEM simulations of tests LG-0 and SG-1 (El Shamy/Zeghal) 2:30 - 3:00Questions and Discussion 3:00 - 3:30Coffee Break 3:30 - 4:00FEM simulation of tests LG-0 and SG-1 (Forcellini/Elgamal) 4:00 - 4:30Questions and Discussion 4:30 - 4:50Geotechnical SI computer program (Elmekati) 4:50 - 5:00Questions and Discussion 4:30 - 5:00Wrap-up discussion 6:00 pm Dinner at Local Restaurant

NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI Tuesday August 21, 2007 Current and Future Pile Research and Other Project Activities Morning 8:00 - 8:20 amProject status, original and revised tasks and schedule (Dobry) 8:20 - 8:30Questions and Discussion 8:30 - 9:00New laminar box at U. Buffalo: status and schedule (Reinhorn) 9:00 - 9:30Questions and Discussion 9: :00Coffee Break 10: :301g pile tests (Thevanayagam) 10: :00Questions and Discussion 11: :30Centrifuge pile tests (Gonzalez/Abdoun) 11: :00Questions and Discussion 12:00 - 1:00 pmLunch (in the room)

NEESPile 2-day-Workshop Aug. 20 & 21,2007 at RPI Tuesday August 21, 2007 Current and Future Pile Research and Other Project Activities Afternoon 1:00 - 1:30 pmDEM soil-structure interaction and pile simulations (Dessalegn/Zeghal) 1:30 - 2:00Questions and Discussion 2:00 - 2:30FEM pile simulations (Forcellini/Elgamal) 2:30 - 3:00Questions and Discussion 3:00 - 3:30Coffee Break 3:30 - 3:503D Viewer update (Radwan) 3:50 - 4:00Questions and Discussion 3:30 - 5:00Wrap-up discussion and conclusions of workshop