Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.

Slides:



Advertisements
Similar presentations
Network II.5 simulator ..
Advertisements

Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
EQUIPMENT VALIDATION.
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
2 A. Prof. Hala Abdel-monem Elsadek Microstrip Department Head, Electronics Research Institute Institute /Company: Electronics Research Institute l December.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Reliability Tools (Part 8a) Department of Electrical & Computer.
Hall Probe Calibration System
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
Manufacturing Engineering Department Lecture 9 – Automated Inspection
CERN A NOVEL PXI-BASED DATA ACQUISITION AND CONTROL SYSTEM FOR SINGLE STRETCHED WIRE MAGNETIC MEASUREMENTS FOR THE LHC MAGNETS: AN OPERATION TEAM PROPOSAL.
ControlDraw, Modularisation, Standards And Re-Use Standardised Specification and Modular Design How ControlDraw Help.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Graphical Output Package for Industrial Sensor May Team Members Steve Bower – CprE Ken Hall – CprE Roar Lien – CprE Jim Sproul – CprE Rich Matus.
Measurement Control and DAQ for Superconductors and Magnet labs SCLabs Adriaan Rijllart1 Adriaan Rijllart, for the EN-ICE-MTA section.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
P. Fessia, S. Krog-Pedersen F. Regis, L. Rossi
Instrumentation for Magnetic Measurements” Review of Superconductors and Magnet Laboratories, May 2009 Page 1/7 Superconducting.
Follow-Up and Checkpoints of Harmonics in Collared Coils and Cold Masses E.Wildner AT-MAS-MA.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
AT Measurement Systems
Enterprise Resource Planning System (ERP) Flowchart #7
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
E. Todesco EXPERIENCE WITH FIELD MODELING IN THE LHC E. Todesco CERN, Geneva Switzerland Thanks to the FiDeL team CERN, Space charge th April 2013.
“WISE” Simulation of optical imperfections in LHC P. Hagen AT/MCS Acknowledgements: Colleagues in AT/MAS, AT/MEL, AT/MTM, AB/ABP CERN, October 2006.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
24/11/2017 Performance of the room temperature Systems for Magnetic Measurements of the LHC Superconducting Magnets at CERN J. Garcia-Perez, J. Billan,
12 good reasons to buy an ABB TrafoStar™ transformer
LABVIEW BASED MAGNETIC FIELD MAPPING SYSTEM FOR CYCLOTRON DC-280
Haiwell PLC Modules Introduce
DesignDRIVE Position Manager SIN/COS
Current Status of ITER I&C System as Integration Begins
Developing Information Systems
HO Corrector Magnets: decapole test and future plans
EN-ICE Technical Committee SM18 activities & projects
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Data acquisition and data processing software for magnetic measurements for NICA magnets Alexander Bychkov LHEP, JINR 2017.
Director, Futura Apsol Pvt. Ltd.
Topics Introduction Hardware and Software How Computers Store Data
Overview of Computer Architecture and Organization
Principles of Information Technology
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H. Reymond CERN, Geneva, Switzerland Abstract The LHC superconducting lattice dipole magnets are presently under construction in three European industries. Due to the stringent magnet performance required for the LHC, these magnets have to be built with high accuracy during all the steps of their assembly. In order to detect defects in the earliest industrial production phases and to ensure the quality of the magnetic field as specified by the CERN contracts, dedicated measurement benches have been built and installed in each assembly company to validate the magnetic field quality at two important production stages: the collared coils and the final cold mass. EPAC 2004 A. Rijllart Magnet under test Moles VME Encoders Motor DVM Controller Power Supply Sun™ workstation Defects detection Harmonics are indeed a reflection of the coil geometry and of the magnets mechanical structure. A deviation from the nominal values may indicate that a component is out of tolerances or that the coil or the magnets were badly assembled. The presence or absence of certain harmonics is used by the analysis team at CERN to determine the nature, size and localisation of these defects. In this figure DIMM pointed out a defect in the middle of the dipole in aperture 1, in the upper left quadrant. After de-assembling of the collared coils, a double protection shim was found at that position. DIMM features The DIMM was designed to be robust and to require minimal maintenance, which could be done in parallel with the moles calibration. The electronic hardware is commonly available on the market and the software was developed using an industrial control system standard. The complete measurement at each production stage, including the on-line analysis, takes less than 2.5 hours and results are available at CERN immediately after the end of the measurement. After the initial setting of the moles and motors modules, the measurement is completely automatic, including the final analysis. The system is also flexible to be used for non-standard measurements. In this case, magnets are measured by CERN personnel. ALSTOM ANSALDO NOELL Zeitz NOELL Würzburg Brake control Level control Coil bucking VME crate: integrators, ADC, I/O, MXI, CPU SUN workstation Power supplies DIMM in the assembly companies A total of eight DIMMs have been built, six of which have been installed in the three dipole assembly companies between November 2002 and November Each company is equipped with two DIMMs, one for the measurement of collared coils and one for the final measurement of the cold mass. Two extra devices are kept at CERN as spare systems and for future development. As of May 2004, about 20 manufactured collared coils have been found out of tolerances thanks to DIMMs. All these coils showed real mechanical defects in the positions expected. The monetary value saved is already more than the whole investment in the warm magnetic measurements for the production so far. DIMMs have proven to be very precise, provided that the moles are regularly calibrated. Impact on cold tests at CERN Because of the good correlation found between warm and cold measurements, only one third of the dipoles are now measured at cold at CERN. This speeds up the magnets tests and allows significant savings in the construction of the LHC dipoles. Control software The control of DIMM benches, the measurement cycle execution and the analysis are performed by a LabVIEW™ application. The lowest level of the software is composed of the drivers of the interfaces and equipment used. The middle level is composed of multi-device sequencing and synchronisation functions using the lower level drivers. This is the core of the software that manages the control and read-out of the devices with the defined measurement procedure and parameters. The user interface allows the operator to define the measurement parameters and shows the status during the measurement and the final results. After the measurement results are displayed in graphical and numerical format. Several analysis tools are available to be applied on the collected data. Facilities are given to export measurement data as flat ASCII files and binary files (raw and results data). At the end of the analysis, files are sent directly to CERN via the company’s own network or via a dedicated ADSL modem. Final commissioning On this picture one can see the two field measuring probes before entering the dipole at the DIMM encoder side, together with the development team