Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Bubble Chamber Planning Meeting 04 September
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF ODH Discussion How to avoid ODH2 conditions? August 5, 2015.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 31, 2015.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker October 21, 2015.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
Hall A Installation Review John J. LeRose 2/25/2009.
Bubble Chamber Planning Meeting 07 August
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker April 12, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker February 23, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Internal Personnel Safety Review UITF Overview and Introduction Matt Poelker.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting What we started with… UITF as imagined Upgraded Injector Test Facility - UITF.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Upgrade Injector Test Facility: UITF Why Build It? HDIce commissioning Bubble chamber physics with Bremsstrahlung x-rays: photo-disintegration of oxygen.
ELENA installation progress F. Butin / ELENA collaboration.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 12, 2016.
CBETA Technical Review
PIs: Riad Suleiman and Matt Poelker
CLEX* Status and Plans CTF3 complex CLEX
UITF – Upgrade Injector Test Facility
Hot Checkout System for LERF Resuscitation
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
UITF Project Status Meeting
UITF Project Status Meeting
Thomas Jefferson National Accelerator Facility
User Facilities 2016 Users Group Board of Directors Update
Upgraded Injector Test Facility
Mathew C. Wright January 26, 2009
UITF MPS system requirements
Electron Source Configuration
Upgraded Injector Test Facility
J. Seeman Assistant Director for PPA/LCLS
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
NC Accelerator Structures
Upgraded Injector Test Facility
UITF Conduct of Operations Review
UITF Conduct of Operations Review
Polarized 3He target installation
Presentation transcript:

Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015

Thomas Jefferson National Accelerator Facility Page 2 UITF Progress meeting Proposed UITF re-scoped What we started with… Facilities HDice New UITF Cryo Infrastructure Facilities Cryo Infrastructure including some RF HDIce (polarized target beamline) New UITF

Thomas Jefferson National Accelerator Facility Page 3 UITF Progress meeting Demolition Stairs Electric Cave1, top of Cave1, Cave2 and control room Cave2 structure Gate Fire protection Assorted (LCW, railings, etc.,) Procurement Total: $269,000 Labor: $109,085 (34 PW)Facilities

Thomas Jefferson National Accelerator Facility Page 4 UITF Progress meeting FY16 UITF Facilities Cost Estimate for Procurements (direct costs) – 13 Nov 2015 Structural: Seismic Anchoring $ 30,000 Steel Pedestal (ODH vents) $ 8,000 Precast Concrete $ 56,000 Structural Total: $ 94,000 Architectural: Entry Gate $ 5,000 Painting $ 5,000 Architectural Total: $ 10,000 Mechanical: Compressed Air $ 4,000 Control Room HVAC $ 5,000 Mechanical Total: $ 9,000 Electrical: Cave 1 Elec $ 78,000 Communications $18,000 Cave 2 Elec $ 50,000 Electrical Total: $ 146,000 Fire Protection: Cave 2 $ 10,000 Fire Protection Total: $ 10,000 Project Total: $269,000Facilities

Thomas Jefferson National Accelerator Facility Page 5 UITF Progress meeting Plumbing and controls to connect 1/4CM to CTF Includes “spigots” near 1/4CM for supply and return to support other users, including HDIce or anything else needed in future. Controls Procurement: $18 to 44 Controls Labor: $30.8 (14 PW) Design and plumbing procurement$50 to 95 Design and plumbing labor$185.8 (97 PW) Totals $68 to 139 and $216.6 (111 PW) Cryo Infrastructure Some of this could move to “HDIce”

Thomas Jefferson National Accelerator Facility Page 6 UITF Progress meeting RF part of Cryo Infrastructure Include within Cryo Infrastructure all RF (since the ¼ CM is no good without RF) RF Procurement Total: $41k RF Labor: $74.3 (34 PW) This rf only for 1/4CM, more rf needed for new UITF (lasers, chopper, buncher, MO)

Thomas Jefferson National Accelerator Facility Page 7 UITF Progress meeting Cryo Infrastructure To CTF Cryo controls racks RF

Thomas Jefferson National Accelerator Facility Page 8 UITF Progress meeting HDIce (polarized target beamline) Designer for this part of beamline Move some of the Cryo costs to here… The hardware to build this part of beamline

Thomas Jefferson National Accelerator Facility Page 9 UITF Progress meeting HDIce (polarized target beamline) To purchase in FY16 viewers15 MPSNot defined yet girder20 DC power60Trim cards… MagnetsThree dipole magnets, two quads, steering magnets Pneumatic valves harpTrying to find harp, magnets and valves…. Machine shop35 Total 3 months design time Labor to put beamline together

Thomas Jefferson National Accelerator Facility Page 10 UITF Progress meeting New UITF re-scoped Gun Magnets Viewers Valves BPMs ODH and PSS Network communications Software Rad Con

Thomas Jefferson National Accelerator Facility Page 11 UITF Progress meeting Combine the two features that provided incremental success: shed and doped insulator Getting the gun to work can incur costs

Thomas Jefferson National Accelerator Facility Page 12 UITF Progress meeting “Shed” triple- point protection Doped insulator SF6 R350 epoxy receptacle Combination of doped insulator and shed, SF6 and epoxy receptacle, plus added length Yan Wang has modeled the shed, a good design… …then in October

Thomas Jefferson National Accelerator Facility Page 13 UITF Progress meeting New UITF Procurements To purchase in FY16 Gun130includes beamline components I&C211.9Some could get moved to HDIce portion SSG44.7 DC power8cable Magnets0Spectrometer dipole, trying to find one Network32.5IOCs and network switcher Machine shop40Always underestimated…. Total467.1

Thomas Jefferson National Accelerator Facility Page 14 UITF Progress meeting Four “Fences” Facilities (fairly well defined) $269k and $109.1 (34 PW) Cryo Infrastructure (some confusion over procurements, lots of labor) $68 to $139 and $216.6 (111 PW) for cryo portion $41k and $74.3 (34 PW) for klystron portion HDIce (polarized target beamline) $130k New UITF $467k (I’ve double counted procurements…number too large)

Thomas Jefferson National Accelerator Facility Page 15 UITF Progress meeting Month by Month Spending Profile This schedule and cost estimate for “rf applied to cold ¼ CM” seems accurate I will do the same for the entire project by UITF meeting next week…