MIWP 5 – Validation and conformity testing Update and status March 2015.

Slides:



Advertisements
Similar presentations
INSPIRE Service Architecture
Advertisements

Validation and Conformity testing - Status and planning (Carlo Cipolloni)
Update on INSPIRE: INSPIRE maintenance and implementation and INSPIRE related EEA activities on biodiversity CDDA/European protected areas technical meeting.
1 The INSPIRE Geoportal Ioannis Kanellopoulos Spatial Data Infrastructures Unit European Commission Joint Research Centre Institute for Environment and.
Serving society Stimulating innovation Supporting legislation INSPIRE Maintenance and Implementation Work Program Robert Tomas, Michael.
June 2006Data and Service Sharing Drafting Team The Data and Service Sharing Drafting Team Clare Hadley Co-Chair.
INSPIRE drafting teams work versus practical INSPIRE implementations, theory and practice Marek Brylski, Intergraph Polska Enviro-i-Fórum – Zvolen – Slovakia.
Serving society Stimulating innovation Supporting legislation Joint Research Centre The Inspire Geoportal Validator.
1 Interoperability of Spatial Data Sets and Services Data quality and Metadata: what is needed, what is feasible, next steps Interoperability of Spatial.
© NERC All rights reserved Work Package 8 – Web Services and Technology Jonathan Lowndes
XIth International Congress for Mathematical Geology - September 3-8, 2006 – Liège, Belgium Contribution of GeoScienceML to the INSPIRE data harmonisation.
Update on INSPIRE CDDA/European protected areas technical meeting 2015 Darja Lihteneger Project manager - Data centres and INSPIRE implementation IDM -
MIG temporary sub-group on Persistent Identifier (PID) DRAFT Terms of Reference Part II Christian Ansorge European Environment Agency MIG-T meeting, 18/12/2014.
Co-funded by the European Community eContentplus programme The NATURE-SDIplus Solution for Data Harmonisation.
Serving society Stimulating innovation Supporting legislation Update of Discovery MS MD Schemas and Tools – MIWP-8 Tim Duffy, James.
Serving society Stimulating innovation Supporting legislation WCS TG editor Alexander Kotsev, Michael Lutz MIWP-7b sub-group meeting,
Emanuele roccatagliata gisig NATURE-SDIplus contribution to the INSPIRE DS testing Nature-SDIplus, Best Practice Network ECP
Testing - an essential aspect of establishing an SDI Clemens Portele, Anders Östman, Michael Koutroumpas, Xin He, Janne Kovanen, Markus Schneider, Andriani.
Serving society Stimulating innovation Supporting legislation Proposal for a new MIWP action on GML-related aspects Michael Lutz MIG-T.
MIWP-16 status MIG-T meeting March Tasks of MIWP-16 The tasks of the temporary sub-group shall be: – Develop a project plan including deliveries.
INSPIRE Data validation: the eENVplus experience --- Extension of the INSPIRE DS: the GeoSmartCity experience NRC EIS meeting Copenhaghen Nov 26 th, 2015.
WISE Working Group D September 2009, Brussels Jon Maidens.
NSDI and Inspire implementation Lars Christensen.
Geodateninfrastruktur Deutschland INSPIRE conference 2013 | Florence, 24 June 2013 Daniela Hogrebe Andreas von Dömming Coordination Office SDI Germany.
Serving society Stimulating innovation Supporting legislation INSPIRE Maintenance & Implementation Framework Work Programme Michael.
WISE GIS/IT Workshop, Dublin January INSPIRE Architecture & WISE Steve Peedell Spatial Data Infrastructures Unit European Commission Joint.
Work package in ABC III Specific Contract with PwC/interactive instruments on implementation of INSPIRE validator Clemens Portele, interactive instruments.
Serving society Stimulating innovation Supporting legislation Work Programme evolution Michael Lutz MIG-T meeting, Rome, 1-3 December.
What’s new at ArcGIS for INSPIRE Roberto Lucchi Guenther Pichler.
Serving society Stimulating innovation Supporting legislation INSPIRE: Infrastructure for Spatial Information in Europe Michael Lutz.
Serving society Stimulating innovation Supporting legislation Web Coverage Services (WCS) Thematic Cluster #3 Jordi Escriu Facilitator.
1 ”Consolidation of” WISE Water Information System for Europe (as part of SEIS) ”Consolidation of” WISE Water Information System for Europe (as part of.
MIWG-8 Update TG Metadata Michael Östling Status Rome.
Michael Lutz INSPIRE MIG-T meeting #38 Ghent March 2017
Tomas Kliment Junior Researcher Italian National Research Council
Facilitator Thematic Cluster #3
Data set series Michael Lutz 44th MIG-T meeting, Ispra
38th MIG-T meeting, Ghent 28 – 29 March 2017
MIWP 5 – Validation and conformity testing
Validation & conformity testing
Validation and Conformity testing – Status & next steps
Robert Tomas INSPIRE Thematic clusters coordinator MIWP Action
action status & planning
MIWP action review and status report
INSPIRE registry Roles & procedures
Proposed MIWP action on INSPIRE & Copernicus
INSPIRE MIG-T MIWP-16 activity report.
MIWP : Deliverables for approval
Status MIWP work packages
MIWP7a: SOS-based Download Service – Overview and state-of-play
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
Validation in INSPIRE Webinar on a new Test Registry & Repository 26/05/2015 Robin S. Smith & Michael Lutz.
INSPIRE Test Framework
INSPIRE Thematic Clusters
MIWP MIWP actions follow-up
Status on eu actions from the kick-off meeting
INSPIRE Maintenance & Implementation Framework Work Programme
MD & NS validation workshop
Michael Lutz 29th MIG-T meeting, Ispra, April 2016
How to structure the download service TGs?
Work to date in MIWP-5 sub-group on validation and conformance testing
MIWP-6: Registers and registries
MIWP MIWP actions status reports MIG Technical subgroup meeting
WISE Floods drafting Group
MIG-P orientation debate
INSPIRE code lists and their extension
4th Meeting of the MIG-P, Brussels, June 2016
5.b3 Monitoring & Reporting 2019
INSPIRE MIG-T Meeting Paris, October
WISE and INSPIRE By Albrecht Wirthmann, GISCO, Eurostat
Presentation transcript:

MIWP 5 – Validation and conformity testing Update and status March 2015

SubTask Define process and governance of validation and conformity testing (INSPIRE testing maintenance framework). Manage by Peter Parslow UK (10 people) SubTask Investigate feasibility of setting up a compliance certification facility and process similar to OGC CITE or other rate system. Manage by Giacomo Martirano IT (3 p.) SubTask Establish INSPIRE testing maintenance framework based on results of 1.2. Manage by Peter Parslow and Carlo Cipolloni UK-IT (11 p.) Task 1

SubTask Define use cases for (a) commonly agreed validator(s) (for metadata, data and services) Manage by Christian Ansorge EEA(14 p.) SubTask Derive requirements (functional and non- functional) based on use cases.?? (14 p.) SubTask Collect information on existing validation tools/platforms and approaches, including languages/approaches for documenting tests. Manage by Daniela Hogrebe DE (8 p.) SubTask Evaluate existing tools/platforms and approaches on how they meet the requirements defined in 2.2. ?? (7 p.) SubTask Derive software/test development requirements based on results of 2.4. Manage by Ilkka Rinne DK (9 p.) SubTask Collect schema and schematron existing examples from Thematic cluster and proposed in MIWP-14. Manage by Robert Tomas JRC (all the TC Portal people) Task 2

SubTask Develop testsuite for INSPIRE metadata. Manage by Paul Hasenohr (13 p.) New extraTask Map requirements in MD IR to requirements in MD TG. Manage by Michael Lutz SubTask Develop testsuite for INSPIRE discovery service. ?? (4 p.) New extraTask Map requirements in NS IR to requirements in Discovery service TG. ?? SubTask Develop testsuite for INSPIRE view service. Manage by Sven Böhme (6 p,) New extraTask Map requirements in NS IR to requirements in View Service TG. ?? SubTask Develop testsuite for INSPIRE download service. ?? (6 p.) New extraTask ap requirements in NS IR to requirements in Download service TG. ?? SubTask Investigate feasibility of testing INSPIRE data sets. Manage by Carlo Cipolloni (10 p.) Task 3

35 staff applied 3 day x months 1 year of project 57 MM (1260 D/Y) WP resources + Specific Expert Group (11 people) x 2 months 15 sub-Tasks and 30 sub-sub-tasks

Activities started First Release of Procedures for change Managment and control the ATSs, documentation, ETSs, software, etc SubTask 1.2 Collect information on existing validation tools/platforms and approaches, including languages/approaches for documenting tests SubTask 2.3 Collect schema and schematron existing examples from Thematic cluster SubTask 2.6

Activities started Develop testsuite for INSPIRE metadata: ATS for Metadata Technical Guidance: almost all 39 requirements in the MD TG ready to be reviewed by the MIWP-5 SubTask 3.1 Develop testsuite for INSPIRE view service: ATS for View Services Technical Guidance - ISO profile: 25/75 requirements tested and ready for the MIWP-5 review ATS for View Services Technical Guidance - WMTS profile: are tested 6/19 requirements, 6 are considered not mechanically testable or overlapping with other requirements SubTask 3.3

Activities started Develop testsuite for INSPIRE download service: ATS for Download Services Technical Guidance - Pre-defined Atom Conformance Class: 4/45 were in draft stage and 5 have been evaluated as non- mechanically testable Suggestion about ATS for the WFS conformance class of the predefined dataset Download Service Suggestion about ATS for the WFS conformance class of the direct access Download Service SubTask 3.4 Dataset pilot case: A pilot on Protect Site is started with EEA and EPSIT for a schematron definition A pilot on Natural Risk Zone is started with ISPRA and EPSIT SubTask 3.5