2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.

Slides:



Advertisements
Similar presentations
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Advertisements

April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Progress and Plan for Superconducting RF Cavity RF Group.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
David Saenz CF Oct 30, CF MEP Commissioning.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
LAYOUT OF COMMERCIAL BUILDINGS
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Director’s Review of August 2-3, 2007 CLASSE ERL Conventional Facilities Donald Bilderback Cornell High Energy Synchrotron Source, School of.
Civil and Environmental Engineering Engineering the Future-2014.
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
Civil and Environmental Engineering
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
February 2010 ALBA Synchrotron Light Source Francis Perez.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
FIRE PROTECTION & SECURITY in ELI Beamlines
CBETA Technical Review
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Innovative He cycle Francois Millet.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
(Potential) Site and Utilities
Draft SuperB Organization Chart for TDR Phase
FRESNO COUNTY WEST ANNEX JAIL
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
COOLING & VENTILATION INFRASTRUCTURE
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Mechanical system of CEPC
The sport hall.
Maintenance at ALBA facility: Strategy for the conventional services
Presentation transcript:

2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS

2005/06/22 ALBA Building Project 2 ALBA Building Project. Time Schedule. The Site. Description of the Facility. 0Objective A.Architecture and Civil Works. B.Mechanical Installations. C.Electrical Installations. D.Safety and Fire Protection.

2005/06/22 ALBA Building Project 3 Time Schedule EneFebMarAbrMayJunJulAgoSepOctNovDic AVANT PROJECT BASIC PROJECT EXECUTIVE PROJECT Ideas Competition Construction period: 24 months 2005: Redaction of the Project 17 Firms interested 5 Finalists

2005/06/22 ALBA Building Project 4 The Site (1/2) UAB Campus Sant Cugat del Vallès ALBA Cerdanyola del Vallès Parc Tecnològic

2005/06/22 ALBA Building Project 5 The Site (2/2) BP-1413 Road between Cerdanyola and Sant Cugat Works on site during last year: Geotechnical Characterization Summer 2004 Monitored behaviour Taking data daily 12 Monthly reports Vibration campaign Dec 2004 Sector CENTRE DIRECCIONAL CERDANYOLA DEL VALLÊS m2

2005/06/22 ALBA Building Project 6 Description of the Facility 0.Objective. A.Architecture and Civil Works. B.Mechanical Installations. C.Electrical Installations. D.Safety and Fire Protection.

2005/06/22 ALBA Building Project 7 0. Objective MECHANICAL STABILITY ELECTRICALTHERMAL

2005/06/22 ALBA Building Project 8 A. Architecture and Civil Works. 1.Foundations - Slab 2.Functionality Diagram 3.Transit 4.Basement 5.Ground Floor 6.1st floor 7.2nd floor 8.Cross Sections

2005/06/22 ALBA Building Project 9 A.1. Foundations - Slab CRITICAL AREA (70 – 120 m diameter) –A stiff test plate directly founded on the subsoil is so far the most promising solution. –The vibration criteria in the low frequency range are very stringent and will govern the suitable solution. –Based on the results of the Geotechnical investigations performed, it can be concluded that the deformation potential is low.

2005/06/22 ALBA Building Project 10 A.2. Functionality Diagram OA: Foyer – Auditorium – Cafeteria - Stores MB: S ervice tunnel TB: Tanks – Water Treatment – Dynamic UPS OA: Entrance – offices - meeting and show rooms MB: ALBA tunnel – Exp hall – Service area - Laboratories - Mechanical rooms – loading area TB: cooling & heating plant – workshops - storage GROUND FLOOR FIRST FLOOR SECOND FLOOR BASEMENT OA: offices – free suitable for offices MB: mechanical rooms – control room outer ring – free suitable central courtyard OA: offices – free suitable for offices

2005/06/22 ALBA Building Project 11 A.3. Transit Pedestrian transit VIP vehicles Park & Bus transit General supply transit Scientific & technical supply transit Park & Bus transit Main Entrance Entrance to the Building

2005/06/22 ALBA Building Project 12 A.4. Basement Cafeteria – Vending Auditorium (200 p.) Compacts archive Medical service Changing room Waste store Service tunnel Electrical Station Electrical Control Room Tanks Pumps and exchangers

2005/06/22 ALBA Building Project 13 A.5. Ground Floor Experimental Hall ALBA Tunnel Beam Lines Laboratories: BL Labs ID + magnets Vacuum lab Comp & communic. Metrology lab Electronics lab Detectors lab RF lab Entrance – Hall Office Area – 400 m2 Trucks access exp. area Central courtyard Workshops – 750 m2 Storage – 600 m2 Cooling Plant & Cooling Towers Dynamic UPS Utilities

2005/06/22 ALBA Building Project 14 A.6. First Floor Office Area 400 m2 (Phase 2) m2 (Phase 1) Technical Area 2 * 500 m2 ALBA Control Room Central courtyard Free suitable for Supplementary labs. Phase 2

2005/06/22 ALBA Building Project 15 A.7. Second Floor Office Area 400 m2 (Phase 2) m2 (Phase 1)

2005/06/22 ALBA Building Project 16 A.8. Cross Sections

2005/06/22 ALBA Building Project 17 B. Mechanical Installations. 1.Production and Distribution 2.Water Treatment and Fluids

2005/06/22 ALBA Building Project 18 B.1. Production & Distribution Cooling Towers 9 MW Cap Boilers 1,5 MW Cooling Plants UTA’s ALBA Tunnel Service Area Experimental Area Beam Lines Offices ALBA Tunnel - Linac / BO / TL - S.R. Service Area Experimental Area Air Cond. 4 MW Cooling 4 MW

2005/06/22 ALBA Building Project 19 B.2. Water Treatment & Fluids. Demineralised water. Natural gas. Gas oil. Compressed air. –Distribution loops: perimeter laboratories and beam lines - Storage ring -Booster and Linac - Service area -Technical Building Gas nitrogen. –Supply from a liquid nitrogen tank to laboratories and beam lines. Other fluids. –Space will be foreseen for possible future installations of other gases as liquid nitrogen or recuperation of helium gas. Deionization UnitInverse Osmosis Unit

2005/06/22 ALBA Building Project 20 C. Electrical Installations. Topology and Power

2005/06/22 ALBA Building Project 21 C. Topology & Power 4,5 MW ALBA Machine Total Power 12 MW 4,5 MW Cooling & HVAC 2 MW Offices & Workshops 1 MW Critical Supply Static UPS Dynamic UPS

2005/06/22 ALBA Building Project 22 D. Safety and Fire Protection.

2005/06/22 ALBA Building Project 23 D. Safety and Fire Protection. In accordance with national rules. Safety and Control Integrated System: –Fire Detection –Fire Extinguishing (mobile, fixed, outdoor hydrants, automatic plus water/pumping system) –Intrusion detection –Access control –Visits control –Closed TV system –Technical control –HVAC monitoring and protection –Electrical Power monitoring and protection –Emergency Plan –Waste management

2005/06/22 ALBA Building Project 24 Thanks for your attention