DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.

Slides:



Advertisements
Similar presentations
Car Hoist.
Advertisements

Better together... we deliver SASOL CHEMICALS BASE CHEMICALS (EXPLOSIVES) MOSH - "Day of Learning" 2014.
The Pet Waterer FluiDivas Lindsey Ehinger, Laura Mar, Stephanie Wedekind, Kimberly Wilson CEE 454 Design Project.
Research Update Automated Bolting and Meshing Project - C17018.
+ Tips and Techniques for Successful Housing Placement Weingart Family Solutions Center Housing Locator Team.
1 Metallurgical Coal EXPERIENCES FROM THE USE OF IN CYCLE TENDON SUPPORT Richard Campbell Principal Geotechnical Engineer Blackrock Mining Solutions.
Development Taskforce Presentation
Disabled Platform Access There are two designated parking bays immediately outside the front of the main college building. Disabled access both into the.
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
Pulling System Hose Just Got Easier by TM Monthly Payments* Start At $ 617.
CSUN - Prof. David Shternberg
MSE507 Lean Manufacturing
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
ICT Graduate Schools stakeholder workshops Background and Preview July 2014.
Case Study – St Clair Park Village, Auckland, NZ
Solutions for business and government through  Strategic Planning  Process Thinking  Leadership Development PO Box 2013, South Melbourne, Victoria,
PRODUCT INSTALLATION CONTRACTORS SERVING THE MINING INDUSTRY Authors:Ed Barber - Strata Mine Services, Inc. John Breedlove - HeiTech Al Campoli - Minova.
Building a Training Agenda Focus, Structure and Variety.
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
Sandvik Mining & Construction (Tomago) Pty Ltd
ACARP 2008 Improving Development Performance. 2 ABM25s – From Plan to Production Background to Development at Ulan The plan to move development forward.
"Cost is long forgotten but quality is remembered forever"
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
Conservation District Supervisor Accreditation
Case Study – Flowers Owing to client confidentiality, the grower’s business cannot be named. However, this is a real case study from The case reflects.
ACARP Roadway Development - Operators Workshop March 2008
DISCUSS ANY FOUR APPROACHES TO SYSTEM CHANGEOVER
Ergonomics and Workstation Design Space Requirements
Powerful PowerPoint presentation using pain & pleasure matrix.
Copyright © 2008 OMAC. All rights reserved Packaging Automation Survey Summary Dave Bauman OMAC Technical Director.
© Wiley Chapter 2 Operations Strategy and Competitiveness Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint.
Nature And Sources Of Change In Business Nature And Sources Of Change In Business Reasons For Resistance To Change Reasons For Resistance To Change Managing.
SBT Series Swingbeam Shears.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Excel Engineering Fabrications SolidWorks Andrew ClarkeRegional sales manager Alan PopejoyTechnical and training consultant.
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
2007 Ryko Annual Sales Meeting 2007 Ryko Annual Sales Meeting Category Management Services (CMS) 2007 Ryko Annual Sales Meeting 2007 Ryko Annual Sales.
Starter. Objectives Recap key CPA items Define lean production Using two examples explain how CPA can be used to achieve Lean Production.
The Peace of Mind Dog Care SYSTEM V 1.0 Aaron Humphrey EKU, Dept. of Technology, CET.
Factory benefits Hooper feed back DRAFT Hooper : “We are looking at our core business, is building machines. Factory gives the.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
Train The Trainer. Ice breaker What is your background? What are your expectations from the course? What has been your greatest achievement up till now?
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
NYS Department of Environmental Conservation End of Summer P2 Intern Presentation How-To Tips (title slide) Erica Cruden, PE P2 Intern Coordinator NYSDEC.
MAINTENANCE – BUILDING BLOCKS. Maintenance Building Blocks? What does it mean and why do you think maintenance base building block important? By definition.
Welcome to the ICT Department Unit 3_7 Management Of Change.
On Demand Travel Spend Management Solutions ATRIIS Travel & Expense Management Solutions June 2011.
Classroom Interaction. EFL students need to speak out! Put a check mark in the appropriate box 1.How often do you ask your students questions in class?
Introducing Systematic Innovation Murali Loganathan trizindia.org.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Cloud solutions for growing entrepreneurial companies EXACT SOFTWARE.
The first question is really "Why do you need a control system at all?” Consider the following: What good is an airplane if you are a pilot and you.
Convergence Matters Research Analysis Preliminary results of research ESF Convergence Phase One: Exploring the involvement and achievements of Voluntary.
& A new approach to education Sally Boyce and Sally Singh Cardiac Rehabilitation University Hospitals of Leicester NHS Trust.
West Midlands Fire Service and the Environment “Everyone talks about the Weather, but does nothing about it.” Mark Twain By Sally Anne Chidwick.
TALKPERFECT DX Duplex Intercom
Tips How to Make Easily.
Presentation to Hernic Ferrochrome
9.4 Assessing greater use of digital technology
MOSH Noise Team Presentation to CM&EE August
Welcome To Powered by solutions. About Us SupportMart is a global services provider, offering multi-support services to various partners and end consumers,
Welcome To Powered by solutions. About Us SupportMart is a global services provider, offering multi-support services to various partners and end consumers,
Moderator: Don Pearson
The Sitecore® Experience Platform™ on Microsoft Azure
Fundamental Cornerstones of Managerial Accounting Chapter Six
MOSH Noise Team Presentation to JS August
Introduction to Ergonomics
Wipro Promax POI Tech lightning talk
Presentation transcript:

DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.

Explaining the Problem XCN Development losses. Development performance is affected by Cut Rate and Cut Hours (uptime opposite to delays) –Development delays are generally 1/3 Engineering and 2/3 Operational – Mine affected. –XCN 2006 at a 10% reduction in Engineering delays at our average rate would have realised an additional 1089m. –XCN 2006 at a 10% reduction in Operational delays at our average rate would have realised an additional 2880m. –XCN 2006 at a 10% increase in development rate based on average 2006 rate would have realised 6200m.

Understanding the basics What should our focus be on ? Correct all of them but the biggest bang for the buck is anything that assists Productivity or Process control. Ergonomics is no longer a dirty word because it contributes to productivity. The rest of this presentation involves the little things that can improve the machines productivity and uptime.

CHANGE AGENTS The West Wallsend, Crinum and now even the Ulan machines have delivered on best practice with operator interaction. The Industry is indebted –to the industry champions who are made a difference on our behalf. –and to the Suppliers who have partnered them in delivering such a quality outcome. CHRIS GEARING: ALAN BRUCE ULAN DEVELOPMENT TEAM

IMPROVING UPTIME

DEVELOPMENT DELAY CONUNDRUM hrs OPTIMUNMMACHINECUTTIMEOPTIMUNMMACHINECUTTIME Travel Time Crib Time ENGINEERING DELAYS OPERATIONAL DELAYS AVE SEQ MVE AVE CUT TIME (+) CUT TIME BP (++) LOST OPPORTUNITY FOR OTHER WORK What was the best in 2004 is now the average across our sites Best Practice could realise 15.9 hrs/ day

What factors affect Uptime XCN experience CABLESCABLES HOSESHOSES HOSESHOSES ELECTCCONTROLELECTCCONTROL BOLTER MBOLTER M HYDHYD

Benefit of focus on Uptime XCN has commenced on a program of eliminating hydraulic delays. XCN Hydraulic Delays

Engineering - Area of focus Hydraulic Hoses

Benefit of focus on Uptime XCN Bolter experience

Engineering - Area of focus Roof Bolter Systems

Improving Machine Productivity These factors assist in consistently being able to achieving 10 min cycles. Assist with repetition. Automated functions build into operating parameters. Hydraulic controls easily accessible and clearly marked. Consumables generally at the finger tips. Plenty of room to step back and observe. Area lighting makes the process easy to see. Platform height adjustable to operator needs. If only we could get the drill, the chemical and the bolt to go in by themselves it would almost be perfect.

IMPROVING PRODUCTIVITY

DEVELOPMENT PRODUCTIVITY CONUNDRUM O P TI M U N M M A C H I N E C U T R A T E m/hr CU RR EN T RA TE L O S T O P P O R T U NI T Y MATCHED EQUIPMENT COAL CLEARANCE SYSTEM SUPPLIES / SERVICES WHEELING ACTIVITIES VENT TUBES ROADWAY CONDITIONS CREW MOTIVATION BASE MANNING OPERATOR COMPETENCE Budget needs POORER PROCESS CONTROL GOOD PROCESS CONTROL HOW WELL DO YOU CONTROL YOUR PROCESS ?

Improving Productivity What is productivity – The interaction between man and machine to deliver a desired output. Why do we never deliver what the theorists believe is possible ? It seems easier to question why our people don’t deliver what the expectation are ! It is much harder to do something positive towards rectifying the differences. It amazes me that you talk with two different groups, one management and one workforce and hear two diametrically opposed views on who is to blame for lack of performance. Maybe we should sit back and listen to both groups point of view.

Improving Productivity Points to consider when delivering Productivity Improvement –Focus on people –Make sound engineering solutions available. –Kick a little O.E.M butt, demand only the best. –Consult with the end users, as they are the ones who have to make it work. –Don’t over look the simple things often they make a significant difference. –Make yourself think outside the box, when it come to improvement. –Simple does not always deliver the best outcome.

Improving Machine Productivity What has been achieved with the ABM25 machine layout and MDG35 Bolter solutions. Improved working area, including adjustable height Improving access and egress Improving consumables access Improving control layout and handle shapes Improving operator control panel interaction MDG35 compliant controls assists repetition. Minimisation of Bolter Hoses. Auto cutting cycle being introduced to Ulan. Supply POD layout to make it easier for operators to access supplies. Lighting improvements essential part of the changes. Noise reduction

Improving Machine Productivity

More Machine Productivity XCN WAITING for Push Button control technology to be proven with the ABM25, clearly it is the future. Ulan introducing auto cut cycle as primary means of cutting. NEXT CHALLENGE –LOOKING at feeding cable bolts under the platform via feed rollers and deliver the cable bolt to the drilled hole.

DEVELOPMENT IMPROVEMENT BEST PRACTICE REQUIRES TENACITY