SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01, 2010 1.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

 In today’s new age technology, everything evolves at the speed of light. Now technology comes out almost on a daily basis and there for makes it hard.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Heavy Concrete Construction Formwork
Present Procedure for cutting stuck casing on Drilling PLATFORM
Installing a double Dreamscreen. Check measurement Left.
Click on this image to open the full PDF document.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
L2000 Technical Training 6. Assemble/Disassemble.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
2008 Cadillac CTS With Original Antenna
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
How To Replace Your Fuel Filter On a 1998 Mustang GT.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Compressor Replacement – ODU
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Model 12 Intek Horizontal OHV
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Ziplock Container and 2L Bottle System. Bill of Materials –3 screw top Ziplock Containers –3 empty 2L soda bottles –Aquarium tubing –Aquarium pump –4.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Maintenance of, or to Change a faulty MCB (motor control board) 2010 models onwards.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
PostBase Automatic Feeder Component Removal Service Training
Annex 4 - Moving Frame and Whiffletree assembly
Baby-MIND Modules & Services
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
ProtoDUNE – DSS Installation, Alignment and QA
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Soxhlet Unit B Maintenance By: Shawna Brookes.
Initial BIS installation
iSHELL Design Review Cryostat & Optics Bench
T400 Motor Replacement.
Genuine N1. Conversion Installation manual LC
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
DET. Integration Inner detector envelope Radial clearances.
Installation guide for RG6/59 compression connectors
BPM Microsystems, LP.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

sLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,

Step by step procedure 2

3

4

Estimate tooling cost 5

Install the first minivan to the front of the EC -Lower the minivan on the rails by crane. -Time for installing 4 hours by 2 people.. -No shield necessary. 6 The extension tube is attached to the extension support, rotated 90 degree Rotary table

Move back the first minivan -Two people move back the minivan 3m. -Time of moving 4 hours by 2 people. -No shield necessary. 7

Insert the second minivan -Install the minivan by crane. -The minivan has a shield attached. -Time for insertion 4 hours by 2 people. -No shield necessary. 8 Two THK rails are attached to the second minivan.

Set up the extension tube on minivans. -Move the second minivan close to the first. -Rotate the extension tube and install it in the right position. -Connect the second minivan with the first. -Time to set up, 16 hours. -No shield necessary. 9 Shield attached to the minivan

Attach the extension tube to the con forward -Move the EC close to the assembly and set the position. -Adjust the height of the extension tube to match the FCAL. -Insert the extension tube inside the con forward. -Time: 16 hours, by 4 people. 10

Install the structure to the back of the EC -Lower the structure (already assembled outside of the cavern) on the rails, by crane. -Time for installing 4 hours by 2 people. -No shield necessary. 11

Set-up the structure -Move the structure and set it up in position. Set-up the position of the mandrel. -Attached the mandrel flange to the bulkhead. Connect the mandrel with the extension tube. -Remove the 48 bulkhead bolts. -Lift the FCAL (by turnbuckles) to clear the EC. -Time for installing 24 hours by 4 people. -No shield necessary. The mandrel square flange work as a shield. 12

Remove the FCAL -Move the FCAL on THK rails 500mm. -Time: 8 hours by 4 people. -Cut the 112 connectors wires. -Special tool is necessary to cut the wires. -Protective gear are necessary for the people who cut the wires. -Time: 4 hour by 2 people. 13

Wires to be cut 14

To remove the old FCAL will use a new cradle made from two halves, which will have a double purpose, as a cradle and a shield. I called it sarcophagus, because the FCAL will stay inside the cradle all the time. 15

Remove the FCAL 16 - Move the FCAL 1500mm to clear the scissor table. - Time: 4 hours by 4 people. - No shielding is necessary.

Remove the FCAL -Lift the sarcophagus to touch the FCAL. -Release the turnbuckles to change the FCAL load on sarcophagus. -Time: 8 hours by 2 people. -No shielding is necessary. 17

Remove the FCAL -By crane, lower the top half of sarcophagus which will engage the bottom half. -Time 4 hours by 2 people. -No shielding is necessary. 18

Remove the FCAL -Move the extension tube, to clear the con forward. -By crane, lift the FCAL just to clear the table and move it backward for the con forward to clear the EC. -Time: 4 hours by 2 people. -No shielding necessary. 19

Remove the FCAL -Lift slowly the FCAL and clear the area. -Time: 4 hours by 2 people. -No shielding necessary. 20

The summing boards -112 connectors for the FCAL to be disconnect. 28 boards, 4 connectors per board 21

The summing boards connectors. The diameter for the bulkhead. 22

Removing the old connectors -The shield lowered by crane. -Rotating the flange, position the window in front of each summing board, allowing to disconnect the old connectors. -Time 24 hours by 1 person. shield Rotating flange window 23

FCAL on Cradle - The existing cradle can be used with the crane to insert the new FCAL. FCAL Cradle 24

-The Installation of the new FCAL will be made in reverse order. -The new FCAL will install with the existing cradle. -To connect the new connectors some tooling is necessary!!!??? -A lifting table possible to be design (using mechanical jacking screws), in stead of buying a scissor table. -The time to remove the old FCAL and install the new one, about 6 weeks on each side. 25