Allowances, Unit Prices, and Alternates ACT 380 1.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Software Solutions for Landscape Professionals Change Orders made easy with DS|Manage360 Planning for Profitability 2012 Webinar Series June 28, 2012 Presenter:Marcus.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Measuring Carpentry and Miscellaneous Items
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH INSPIRE TRANSFORM ENRICH.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Contract Documents
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Construction Contracts and Project Delivery Methods
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
TYPES OF CONTRACTS.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
STRUCTURAL ENGINEERING. What Does a Structural Engineer Do?
Preliminary Project Descriptions/Outline Specifications
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
DIVISION OF PROCUREMENT SERVICES procurement.sc.gov/PS/PS-index.phtm Project Acquisition Under the Consolidated Procurement Code John St. C. White State.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
A few different things… ID 206 construction + materials II.
Specifications ACT 426 Instructor: Doris A. Kemp Student: Jeremy Wright Date: May 4 th, 2006  History of Specifications  CSI  Formats  Contracts 
Chapter 13 Estimates for Remodeling Work
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Measurement and Payment
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
The Contract Management Process Contract Formation.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Allowances, Alternates, and Unit Prices Review Questions.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Construction Planning
The Design Team Carl James.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Stage VI & VII: Construction and Completion & Formal Opening
Construction Documents
(Additional materials)
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
ARCH 435 PROJECT MANAGEMENT
Construction Contracts
FIVE PROJECT PHASES.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Allowances, Unit Prices, and Alternates ACT 380 1

Objectives O Recognize specifying techniques which meet the needs of dealing with the lack of adequate information, unknowns, and contingencies on a construction project 2

Related Considerations O Once a project has been analyzed to determine where changes may occur, then an allowance, alternate, or unit price can be used to minimize the impact of such variables O These special procedures SHOULD NOT become a substitute for accurate and complete documents (drawings & specifications) O Using these items tend to add complexity to the bidding and contract award process 3

Major Topics O Allowances O Cash allowance O Quantity allowance O Unit Prices O Alternates 4

Allowance Defined A monetary amount or a quantity that is not otherwise defined by specifications and drawings, but which the contractor is required to include in the project 5

Cash Allowance Defined A monetary amount that the contractor includes as part of the contract sum to cover the cost of certain items to be determined at a later time 6

When to Use Cash Allowances O Inclusion of items that cannot be designed or selected until the project is partially complete O Cover cost of items for which the owner or architect wants to arrange separate procurement O Cover items where the magnitude of the item can only be determined during construction 7

When to Use Cash Allowances O Accelerate construction schedule when short design period outweighs potential higher cost for cash allowances items O Substitute for complicated specification that is difficult to produce 8

A/E Must Clearly Indicate Which of the Following are Included in allowance: O Actual material cost O Taxes O Delivery O Unloading O Uncrating O Storage and Handling O Installation 9

Typical Cash Allowance Generally covers only cost of material delivered to the site including any taxes 10

When Cash Allowances Used: O Items that cannot be designed or selected until the project is partially complete (e.g., murals, sculptures, furnishings & accessories, & landscaping) O Items such as testing, the magnitude of which can only be determined during construction O Acceleration of the design schedule when the benefit of a short design period outweighs the potentially higher cost involved with cash allowance items 11

Quantity Allowance Defined Requires the contractor to include a specific quantity of a product in the scope of the work even though location of the product is not defined on drawings or in the specifications 12

Quantity Allowance Example A multi-story office building is being constructed O The exact layout of the interior partitions often can’t be determined until the space is leased and each tenant’s requirements are determined O In such as case…bidder will be asked to provide a quantity allowance for linear feet of finished interior partitions, doors & frames, sq. ft. of acoustical ceilings, and recessed lighting 13

Specifying Allowances O Written provisions must be included in several of the bidding documents: O Bidding requirements O Conditions of the Contract (both AIA & EJCDC forms provide articles for this) O Div 1 – General requirements O Individual specifications sections for products 14

Unit Price O A cost quoted by a contractor for a single, specified unit of work O Useful where the nature of the work is defined but the extent of work is not known or is likely to change O When the quantity of the work is known, the total cost of the item is determined by multiplying the quantity by the unit price 15

Alternates O A defined portion of the work that is priced separately and thus provides an option for the owner in selecting the final scope of the project O An alternate can simply be a choice between two products or can be the deletion or addition of a portion of the work (this reduces the total contract amount – stay within budget) 16

Sample Uses O Allowances O See page 4.34; Fig 4.6-A O Unit Prices O See page 5.54; Section 5.6.7; also see Fig 5.6-H O Alternates O See page 4.35; Section