Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director.

Slides:



Advertisements
Similar presentations
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
Advertisements

10-Dec-2012-cesg-1 SLS-OPT: Optical Communications Working Group (1 of 6) Problem and Issues: None. However, schedule for standards publication is very.
November SLS RFM and RNG REPORT 18 November 2004.
Common Coding and Synchronization Layer: Next Steps NASA Optical Communications Working Group 17 April /9/20151.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Fall Technical Meeting, Bordeaux (BOD) 4/15-18/2013 SLS-CS_13-03 Separating Coding from Framing V. Sank, H. Garon - NASA/GSFC/MEI W. Fong, W.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
UNIVERSITY OF MARYLAND CENTER FOR ADVANCED TRANSPORTATION TECHNOLOGY Customer-Focused Performance Measures (Looking for a few good measures) by Philip.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
The Consultative Committee for Space Data Systems Report to CCSDS AGENC Y Note to CMC members: This template follows the CMC-agreed outline for agency.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
SLS-RFM WG deadlock over NASA’s position –Rec has a number of critical flaws including a logical dependence upon an SFCG recommendation.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Image Data Compression WG Spring 2004 Pre-Meeting Status Report May 12, 2003 Meeting May 17-19, Greenbelt MD Chair: Pen-Shu Yeh.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
November SLS AREA REPORT November SLS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY TECHNICAL STATUS OF EACH.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS march 2008 meeting – Crystal City 1 TC/TM space links security SEA / SLS cross area meeting.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
May 16, 2005Chair, IEEE May 16, 2005Chair, IEEE Next Steps & Action Items from March 2005 Plenary Status Review - - May 2005 Interim.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
Report to CCSDS AGENCY Note to CMC members: This template follows the CMC-agreed outline for agency reports Replace RED text with your agency’s name and.
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
19-May-2015-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Spring 2015 Meeting CalTech (Pasadena, CA, USA) SPACE LINK SERVICES (SLS) AREA Gippo /
Image Data Compression WG
Joint Meeting of the CCSDS and the OMG-SDTF
SLS AREA REPORT November 2004 November 2004.
Delta-DOR WG: Report of the Fall 2010 Meeting
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
Atlanta, Georgia, USA, 16 September 2005
Considerations for LDPC codes selection
SPACE LINK AREA MID-TERM REPORT
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Presentation transcript:

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 1 SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 2 SLS-C&S WG summary Problems report: –Missing consensus. Future work/charter: –Future work will continue as BOF. Charter to be produced. See further for details.

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 3 Discussed Topics (1/3) Serial Concatenated Convolutional Codes for 8PSK (ESA/ESTEC/Polito) –Proposal currently ongoing in RFM; informative for C&S. Possible future options together with new modulation schemes. Complexity Comparison of Coding Schemes (ESA/ESTEC/Polito)

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 4 Discussed Topics (2/3) Requirements, Benchmarking & Overview of Proposed LDPCC (ESA/ESOC/UniBO) –Initial proposal to be discussed and refined with WG Members. Generalized IRA LDPCC (ESA/ESOC/UniBO) –Further possibility for refining LDPCC selection.

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 5 Discussed Topics (3/3) Orange Book Progress & Considerations on Requirements (NASA/GSFC) JPL Proposal for LDPCC (NASA/JPL) CNES proposal supporting DVB-S2 adoption (CNES)

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 6 Problem & Way Out (Hopefully) Three Different proposals tabled –NASA/GSFC Quasi-Cyclic LDPCC –NASA/JPL Protograph LDPCC –CNES support to DVB-S2  NO CONSENSUS WG not justified any more Migration to BOF or complete stop?

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 7 Migration to BOF or complete stop? Member Agencies recognize the difficult status without consensus and take proactive approach. Principle agreement for a set of “agreeable” codes reached. Codes shall be evaluated by BOF work and eventually generate consensus proposal for WG. Resolution: Convert WG to BOF.

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 8 Agreed Set Rate ½ Code to be derived by JPL proposal Rate 7/8 Code to be derived by GSFC proposal C2 Rates 2/3, ¾ and 5/6 Quasi-Cyclic Codes to be proposed by GSFC All codes to be validated by BOF taking as reference DVB-S2 characteristics.

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 9 Objectives of BOF 1.Identify a set of mandatory/desirable requirements (addressing also interaction with modulation). 2.Define a Benchmark Matrix for evaluation of proposed codes wrt identified req’s. 3.Identify a set of Quasi-Cyclic LDPCC for frames of (approx) 8 & 16k bits (des.32k). 4.Select the proposed codes by proper benchmarking.

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 10 Schedule of BOF 1.Identify requirements. 2.Define a Benchmark Matrix. By Fall Identify a set of Quasi-Cyclic LDPCC for frames of (approx) 8 & 16k bits (des.32k). 4.Select the proposed codes by proper benchmarking. By Spring 2005 (Initial results) By Fall 2005 (Finalized results)

Montreal – Spring 2004 SPACE LINK SERVICES CODING AND SYNCHRONIZATION WORKING GROUP 11 One task for the WG? The Orange Book Task is not dropped. Shall it continue as (only) task of the WG while the code selection is moved to the newly created BOF?