Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
1 Towards an Upgrade TDR: LHCb Computing workshop May 2015 Introduction to Upgrade Computing Session Peter Clarke Many peoples ideas Vava, Conor,
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Modularity in the Phase II Upgrade of the ATLAS Strip Tracker Ian Wilmut.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
May, 2005(c) 2005, US Civilian R&D Foundation1 The U.S. Civilian Research and Development Foundation (CRDF) Industry Partner Development Program (PDP)
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Beijing ILC Workshop Global Design Effort 1 Main Linac EDR: Cavity & Cryomodule Discussion Lutz Lilje DESY.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
Tests on production cryomodules Bob Kephart Sept 30, 2006.
WP4 April 2013 to March 2016 (Tim). WP4 Outline 1.Scope of UK Activity 2.How the UK work fits into the international programme 3.People involved, institutes,
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
What is Stave Carrier Frame Required to Do?
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Mechanics: (Tim).
Introduction to the Workshop
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Presentation transcript:

Local Supports to IDR Discussion ATLAS Upgrade Week November 2014

Aim of Today To begin to discuss the programme of work needed to advance the development of Local Supports in readiness for the Technical Design Report (TDR) Starting point? - October IDR – See talks by Steve & Ingrid

Context: Roadmap to LS3

…. And in more detail…

Pre-Production Tasks Finalize engineering designs – Geometry, functional specifications, interfaces, etc… – Essentially we do have designs which (probably) meet all the requirements but we might not know this to be true! There are still many issues to be resolved! Qualify the designs – i.e. can we make the design reliably and how robust is it against part & manufacturing inaccuracies. Naturally needs us to develop QA/QC plans & develop suitable test infrastructure NB Post-irradiation verification of properties needs careful consideration (schedule, access to irradiated parts, etc…) Look at materials & part procurement – Materials specifications, market surveys, qualify vendors SJMcM: “The qualification phase of early procurement is essential & must be done on a timescale which does not impede production…”

October IDR - Ingrid

Ingrid’s Timescale to TDR

Managing Change What is fixed? – Is it agreed that there will be 5 barrel strip layers? – Is it agreed that they will all have 2 planes of sensors (axial/stereo) ? – Is the barrel tilt angle agreed? – Will there be a ‘stub’? – Plus anything else you care to think of! To my mind nothing is agreed! All we have are ‘working assumptions’. – Need to strike a balance between premature arbitrary decisions and paralysis through working in the dark. In any case it is 100% certain that we have to be able to manage change

What is the ‘Cost’ of Change? Small Change to Tilt angle For example a change at the degree level to optimise layout etc. Similar to recent re-design of locking point for wire- bonding clearances. Engineering design: 3months-eff ort (m-eff) - done Verification with prototypes: 2m-eff – prototypes to be made on 5-axis mill Re-manufacturing mold-tool: 2-3m-eff – not being done now Re-manufacturing stave insertion tooling: 2-3m-eff – not being done yet Castellated Staves Change to castellated design has a major impact on stave core design; Stave geometry (side EoS still possible? If not then might impact on EC geometry), stave assembly tooling, etc… Stave Mounting & insertion design, tooling & prototyping Cascading impact to areas outside LS assembly – global supports, services, etc… My crude guess is that this is a 36m-eff cost

Other Examples of Major Change ? 5 th ‘Pixel’ Layer – Removes need for stub(?) and maybe some stereo layers in barrel strip system (no direct impact on forward region?) Saves money (& effort) in production. Effort needed to re-optimise for fewer modules (bus tapes, lower power) & optimise layout (same side vs staggered modules) HVCMOS – Replace barrel strip sensors (unlikely in forward region?) IDR Reviewers: – “A clear three- years plan for R&D on the HV-CMOS integrated sensors was presented. This technology has potential cost benefits due to the availability of larger industrial production facilities both for the pixel and the strip detectors. The reviewers encourage the community to pursue these studies. “ Saves money (&effort in production) Effort needed to re-optimise for different module geometry (stave width, bus tapes, module mounting) and power. Optimisation of layout for specific module geometry proposed. Anything for the endcap?

A plan? Focus effort on addressing identified issues – Ingrid’s list – Identify key un-resolved specifications Push for early decisions where possible Understand scale of resources needed (effort and cash) to recover timeline should a major change occur Topic Geometry, radiation length, stability and tilt to be finalised Study of long-term deformations of staves/petals mounted onto realistic structure “mock-ups” Tooling for orbital welding to be defined (Integration rather than LS?) Optimal way to implement ceramic-titanium isolator Thermal modelling and prototyping of the end-of-stave/petal region to ensure design removes heat from the EoS card without impacting (too much) on the thermal runaway headroom Not enough production sites for cores -> end-cap no site proved yet to be able to produce the petals => work more closely with industry