FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
THEMIS Instrument CDR 1 UCB, March 24-25, 2004 EFI AXIAL BOOMS (“AXB”) Critical Design Review Rob Duck Mechanical Engineering Department Space Sciences.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
1 UCB, May 04, 2005 Magnetometer Booms Vibration Issues Berkeley Composites Laboratory Department of Mechanical Engineering University of California at.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
Magnetometer Booms Critical Design Review Dr. Hari Dharan
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
MPSRAlignments - 1 UCB, Oct 26, 2006 THEMIS PROBE MISSION PRE-SHIP REVIEW Alignments Paul Turin LME University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
MPSRQA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Mission Assurance Manager Ron Jackson University of California - Berkeley.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Magnetometer Booms Critical Design Review Dr. Hari Dharan Berkeley Composites Laboratory Department of Mechanical.
FM1 Instrument Suite Pre-Ship Review (PSR)EFI- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) ELECTRIC FIELD INSTRUMENT John.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
THEMIS Instrument PDR Bill Donakowski/ EFI Radial Boom 1 UCB, October 15-16, 2003 EFI Radial Boom EFI Radial Boom Mechanical (SPB Spin Plane Boom) Bill.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Flux Gate Magnetometer and Boom Thermal Christopher Smith Thermal Engineer
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
THEMIS Instrument PDRMag Booms- 1 UCB, October 15-16, 2003 Magnetometer Booms (MAGS) Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
THEMIS INSTRUMENT SUITE
FIELDS MEP Thermal Vacuum Cycling iPER
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
MISSION PRE-ENVIRONMENTAL REVIEW
Gayle K. Martin November 14, 2016
GLAST Large Area Telescope:
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
(EFW Systems Engineer) University of California, Berkeley
THEMIS MISSION PRE-SHIP REVIEW
SPP FIELDS V1234 Thermal PSR
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS FM4/FM5 INSTRUMENT SUITE
University of California, Berkeley
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
GLAST Large Area Telescope
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
Presentation transcript:

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul Turin Lead Mechanical Engineer University of California - Berkeley

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 2 UCB September 21, 2005 Summary of Current Mag Boom Status FM1 Configuration End Item Data Package ToC Requirements Fulfillment of Requirements PFR Status RFAs, Closeouts, Rework, etc. Appendices (testing info) Outline

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 3 UCB September 21, 2005 Requirements and Design: No change to (official) Requirements since MCDR Two changes to Boom design due to other considerations: –Tilt upwards 5 deg (FGM)10 deg (SCM) to reduce S/A shadowing –Required taller frangibolt towers, inclined pivots –Raise boom height above deck to clear higher solar array –Required raising shoulder bases on taller feet Several more changes needed to fix problems caused by 1 st two changes: –Strengthen SCM Frangibolt tower –Strengthen SCM Shoulder Feet Flexures –Replace FR-4 thermal isolators with steel blocks –Redesign shaft retention set screws Personnel, Assembly, and Test: 5 flight and 1 flight spare boom sets have completed functional and environmental testing and have been delivered to I&T. Force Reductions: –Booms are supported by LME on an as needed basis. Mag Boom Status

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 4 UCB September 21, 2005 Configuration Mag Boom Configuration by Serial Number: FM1 suite contains FM1 FGB and FM1 SCB The first “flight” unit was converted to FM6 (flight spare) due to ~1 hour of vibration testing incurred while sorting out problems caused by deployment angle and height above deck changes. Subsequent units all passed all tests first time.

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 5 UCB September 21, 2005 EIDP

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 6 UCB September 21, 2005 Mag Boom Requirements

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 7 UCB September 21, 2005 Satisfaction of Requirements Test Proof test of graphite tubes Ambient, 0 rpm deployment test Sine, Random Vibration test Ambient, 0 rpm deployment test Thermal vacuum test (cycling + Hot and Cold 1 st motion deployments) Ambient, 0 rpm deployment test 15 rpm equivalent drop test Repeatability test Torque margin test Mag alignment verification Length Measurement All test complete, all booms passed, all results in family (except FM6, still acceptable) Satisfies Requirement GEVS IN.BOOM_4 GEVS IN.BOOM_4 IN_BOOM_2,4 IN.BOOM_4 IN.BOOM_1 IN.BOOM_4 Science IN_BOOM_9,10

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 8 UCB September 21, 2005 PFR Status PFRStatusTitle PFR-025CLOSEDCracked feet in SCB frangibolt towerReplaced DAD Tower PFR-027CLOSEDCracked Base Bracket in SCBReplaced tower, used steel washers PFR-041CLOSEDSpring spool in SCB base hinge loosened by vibration. Tightened Spools with new tool to higher torque PFR-043CLOSEDDamaged threads in FGB frangibolt ring.Repaired thread with helicoil. Affects FM6 spare only PFR-044CLOSEDFriction increase in hinge mechanism after vibe Set screw backing out and binding – larger screw used and staked PFR-053CLOSEDIncreased base hinge friction post vib at qual levels Bronze on Al galling -- SS shim added for bronze bushing to ride on PFR-058CLOSEDSCB connector wire damageETU cable too short – Flight long enough PFR-073CLOSEDLength Discrepancy between SCM Flight Harnesses All cut to same length PFR-077CLOSEDFM1 FGB Fail to deploy in Cold Vacuum TestInadequate firing time for cold temperature – worked fine with correct time PFR-078CLOSEDCable for FGM Mag Boom is discoloredContamination analyzed by GSFC determined not a contamination hazard PFR-079CLOSEDFM2 FGB fails cold deployment 6/21/05Inadequate firing time for cold temperature – worked fine with correct time PFR-080CLOSEDFGB 2 fails cold deployment 6/22/06Frangibolts did fire, Operator forgot to remove tape holding booms together PFR-086CLOSEDIncorrect Deployment Angles in FGM DesignShims added to get correct angles

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 9 UCB September 21, 2005 RFAs, Closeouts, Rework, etc. No Mag Boom RFAs No remaining Closeout Items Rework or replacement of hardware: Flexure Feet replaced on SCM Set screw size increased and epoxied to prevent backing out Shims added to prevent galling Shims added to all units to correct deployment angle –Deployment and repeatability tests repeated on one unit to verify no problems Compliance with Test Verification Matrix Complete Test Margins Adequate margins at Deployment extremes Torque margin worst-case > 3.3 (reqmt >2) Survived vibration and thermal limits + margin Integration with Probe 1 Bus Per thm-mint-proc-026,-027,-037(currently in draft form) Units will get 1 st motion deployments during probe TV Changes requalified on FM6, and acceptance tested on all other units

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 10 UCB September 21, 2005 Appendix 1 Vibration Testing

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 11 UCB September 21, 2005 Vibration Testing Sine Vibration Levels (Ref. Swales SAI-TM-2430-RevD ) FM 6 tested to qual levels, FM 1-5 to acceptance levels

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 12 UCB September 21, 2005 Vibration Testing cont. Random Vibration Levels (Ref. Swales SAI-TM-2430-RevD ) FM 6 tested to qual levels, FM 1-5 to acceptance levels

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 13 UCB September 21, 2005 Vibration Testing Status

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 14 UCB September 21, 2005 Appendix 2 Themal Vac Testing

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 15 UCB September 21, 2005 Thermal Vacuum Testing -115C, 4h 75C, 4h -115C, 4h 75C, 4h 75C, 12h 50C, Hot Deploy -40C, Cold Deploy Restow Test temperatures and Profile:

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 16 UCB September 21, 2005 SCM/FGM Boom Thermal Testing Status

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 17 UCB September 21, 2005 Appendix 3 Strength, Repeatability, and Torque Margin Testing

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 18 UCB September 21, rpm and Repeatability Test Booms hung vertically and weighted so that 1g replicates loads caused by spin accelerations, then dropped from angle that gives correct energy at end of stroke to simulate 15 rpm deployment forces. Boom then dropped 5 times and the rest angles were measured, worst-case variations below.

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 19 UCB September 21, rpm and Repeatability Test continued Drop and repeatibility tests repeated on one unit with angle correction shims to show that shims (added per PFR-086) have no effect on repeatability or strength.

FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 20 UCB September 21, 2005 Torque Margin test Ts Torque from Spring Tm Torque from Resistive Force on Force Gauge Tc Torque from Centripetal Force on Elbow Arm on Elbow Joint Tf Frictional Torque on Elbow Joint Minimum Torque Margin = 4.3 This test was run to verify adequate torque margin at worst-case joint at worst-case temperature of -8C and worst-case spin rate of 20rpm (bounce during thrust). Worst-case torque margin of 4.3 meets minimum requirement of 3