Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.

Slides:



Advertisements
Similar presentations
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Advertisements

A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Injection test? Mike Lamont For initial discussion.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Vacuum Interventions in Radioactive Environments J.M. Jimenez AT Department / Vacuum Group.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Mechanical and fluidic integration of scintillating microfluidic channels into detector system 1 Davy Brouzet 10 th September 2014.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
1 CONSIDERATIONS ON WARM MAGNET MEASURED DOSES 2012 September 3rd Francesco Cerutti for the team key contributions by TE-MSCDavide Tommasini and Pierre.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
HL-LHC Standards and Best Practices Workshop CERN, June 13, 2014 Best Practices for ALARA C. Adorisio and S. Roesler on behalf of DGS-RP.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
1 SLHC-WP5 Progress Contributions from I. Dawson, L. Nicolas (U Birmingham), S. Pospisil (ITU Prague) T. Kramer, B. Goddard, M. Benedikt, Helmut.
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
ENERGY DEPOSITION AND TAS DIAMETER
ALIGNMENT OF THE NEW TRIPLETS
News and Introduction from CERN June 15th, 2005
S. Roesler (on behalf of DGS-RP)
Instrumentation for Accelerators Technologies for the HL-LHC
Space Management and Logistics during LS2
Installation of an Instrument on a CERN machine
Renovation of the 45-year old PS magnets
Planned activities on collimator for LS1
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
IP7 losses scaling and impact on forecast for HL-LHC era
CLIC-ILC BDS & MDI work.
ISOLDE Front-End design review – Details of previous faults
Energy deposition studies in IR7 for HL-LHC
Radiation tolerant fibres for LHC controls and communications
HL-LHC operations with LHCb at high luminosity
Review of Quench Limits
Presentation transcript:

Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations identify/discuss possible show-stoppers - if any optimization measures to be implemented investigate (further) optimization measures for collective dose during interventions

Loss analysis (totals, time, sharing): scaling is linear with luminosity, Run2 ~ 2012 to be further studied: slope, scaling, dosimetry Observed dose asymmetry R-/L-side on magnets to be monitored carefully. FLUKA calculations (benchmarked with BLMs): 1MGy / 40fb-1 up to LS3  MBW/MQW Monitoring: coordinated effort combining calculations and measurements (BLMs and doses) Essential to collect data in 2015/2016 to refine predictions Cable samples in place, what about connectors? Part-1: Environment & Tools - Highlights

Activation: Up to 5x more in LS2/3 than LS1, and up to 35x in HL- LHC LSx -> limitation for long interventions in IR7. Similar to hot areas in the injectors Robotics: No industrial solution exists that fits a number of CERN needs -> require in-house development Good tests with survey, leak detection in SPS Data transmission bottleneck so far -> 4G required (to be deployed in the full tunnels, IT: 2015+) priority on the high-rad areas! Part-1: Environment & Tools - Highlights

Lifetime: No known lifetime issues until LS3 for the equipment itself. But cables/connectors (profibus) problems encountered already in LS1? Concern for collimator: once there is an issue on one - likely on many (may not only be due to radiation…). Ongoing investigation on roller screw issue Situation of spares Exchanged in case of problems. Part-2 : Equipment Groups & Impact

Radiation doses and interventions: General awareness and worry about dose to intervening personnel. Difficult environment, not generally optimized for speedy and easy intervention. Dose from environment General interest and support for robotics solutions. Good results for survey – to be developed, Encouraging test for vacuum leak detection. Intervention optimization and minimization. Example for collimator alignment: tolerances (fewer interventions), mechanical issues to improve. Part-2 : Equipment Groups & Impact

Preventive actions: LS1 intervention to improve the future situation. Vacuum pumping consolidation. Absorbers for MBW MBW shielding gains a factor of almost 3 Planned programs for further improvements. Absorbers for MQW, MQW ‘refurbishment’. Part-2 : Equipment Groups & Impact Operation: Relaxed pressure baseline for vacuum (<1E-8mbar) will reduce number of interventions. Humidity, ozone: supposed to be ok Regular flushing (~7d) due to access to points 6 and 8.

Cables, Lights, Fibres: New lights: radiation hard power-supply, light reduced to 40% after 100kGy -> neutron tests pending positions can (possibly) be further optimized Cables are sampled (representative + high-dose) connectors are not (follow-up? c.f., profibus case) Optimization measures already included Full cable exchange would be a dramatic intervention (radiation + access limitation) DC (and WCC) cables expected as not being an issue Optical fibers are fully qualified open question concerning resistance of ducts/cables Part-2 : Equipment Groups & Impact