All Island Single Electricity Market IWFA Update Laura Brien

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
EU Developments Transmission Workgroup 6th October 2011.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Creating a Single Electricity Market Across Borders: Pitfalls, Constraints, and Opportunities Paul K Gorecki Economic & Social Research Institute & Trinity.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Electricity Interconnectors in GB
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Can markets and RES coexist?
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Key Industry Challenges Regulatory Perspective Michael G. Tutty Chairman Commission for Energy Regulation 13 October
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
Update on electricity market Baltic Mini Forum 1 October, 2010.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Presentation to Select Committee on Economic Development
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
European Developments Transmission Workgroup 1 st December 2011.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
European Developments Transmission Workgroup 3 rd May 2012.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Renewable energy support schemes in the Republic of Moldova
DS3 and Qualifier Trials Update
EU Implementation Programme
Regulators’ update on Congestion Management and Balancing
Update on European Network Codes
EUROPEAN TRANSPARENCY UPDATE
New EU Target Market Model & SEM HLD Consultation Workshop
Presentation transcript:

All Island Single Electricity Market IWFA Update Laura Brien Commission for Energy Regulation 6th November 2014

Agenda I-SEM Context I-SEM Progress to Date Concerns Raised during HLD consultation The Aggregator of Last Resort Balance Responsibility of Wind in other EU Markets

EU Context Member States (UK and Ireland) have made a firm commitment to complete internal market Third Energy Package Establishment of ACER and ENTSOE as delivery bodies Single market is being developed through ACER Framework Guidelines and ENTSOE Network Codes European Commission take these through comitology process as binding Regulations EC Review of State Aid Guidelines Updated Guidelines which look specifically at generation adequacy measures published in 2014.

European Integration: Electricity Target Model 12h midday As soon as possible after midday on D-1 On D At H-1 capacity Monthly Day Ahead Market Physical capacity used implicitly Intraday market Balancing mechanism Y+3 Y+2 Annual (Y+1) Forward Market (Physical/Financial) time Auctions of long-term FTRs and/or PTRs with UIOSI via a single platform Flow-based or ATC-based pan-European price coupling Continuous trading through a common platform or implicit auctions Platform for exchanges between TSOs Products exchangeable on a secondary market

Market Development Context SOS Competition Environment

Specific Context of Wind in ISEM

I-SEM Progress SEM Committee published I-SEM HLD Decision on 19th September Compliance with Target Model Efficient use of interconnectors Incorporate lessons from the current SEM Retention of a CRM, but compliant with state aid guidelines Should aim to achieve a low cost efficient integration of renewables Reduce curtailment Incentivise the right back-up generation

Responses to HLD HLD Consultation raised a number of concerns from wind industry; Fundamental change from a ex-post pool to a ex-ante firm market Obligation of Wind to be Balance Responsible Risk associated with forecast errors Capabilities of merchant wind farms Treatment of Priority Dispatch status in ex-ante markets Impact on wind revenues Interaction with REFIT

Detailed Design Phase I-SEM Project Plan published on 10th October Energy Trading Arrangements (ETA) process has commenced Intensive input in next 12 months on the end to end workings of the market Aggregator of Last Resort 1st Consultation in December 2014 (Framework) 2nd Consultation in April 2014 (Operation) Final Decision in August 2015 in line with ETA decision Industry involvement is key

Balance Responsibility of Wind in other EU Markets The transition for wind to become balance responsible is not unique to Ireland A number of MSs have implemented transitory measures Denmark ‘BRP Club’ was opened for government supported (purchase obligation) wind that moved to market settlement arrangements The Danish TSO is the Balance Responsible Party on behalf of portfolio TSO sells the club’s portfolio into ex-ante markets, is balance responsible and settles the proceeds from these markets for participants BRP club is ‘passive’ which created incentive for wind generators to move to a commercial BRP or set up own BRP independently BRP Club is now closed to new members

Balance Responsibility of Wind in other EU Markets Spain Since introduction of forward markets in 1997, the Feed in Tariff for RES evolved to include incentives and obligations for participation in these markets Units above 10MW mandated to provide wind forecasts. If error greater than 20%, a penalty is incurred (10% of estimated total average system cost) In 2007, moved to Cap & Floor premium from the FiT. This was designed to be slightly more lucrative which encouraged generators to trade in all markets while exposing them to balancing costs Aggregators also facilitated in market to minimise balancing costs

The Aggregator of Last Resort Main Purpose of Aggregator of Last Resort (AOLR) Provide a backstop route to market for wind generation Minimise the risks associated with forecasting requirements in ex-ante market ETA will still allow commercial aggregators enter market Key Questions for December Consultation The AOLR entity AOLR Bidding & Settlement Cost Allocation & Incentives Participant Eligibility

END