Steven Worm – RutgersMar 25, 20031 CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,

Slides:



Advertisements
Similar presentations
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Advertisements

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
LHCb VELO Upgrade Medipix/Timepix PR01 Testbeam
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Test-beam Results for the CMS Forward Pixel Detector Carsten Rott Daniela Bortoletto, Gino Bolla, Amitava Roy Purdue University 28 April 2001.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Statistics 1670 components 5839 solder joints 4 routing layers 6 power planes 1858 vias total trace length 35 m dimensions 220 x mm 3 FPGA’s (1.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
Status of the Crystal Ball A.Starostin UCLA. Tasks in preparation for the polarized target experiments CB and the “cube” will be movable on rails – all.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Preparation Examples ACD has provided a website of their CDR preparation status I encourage everyone to view posted material, including the CDR Dry Run.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Testbeam Planning Common to all testbeams:
Micromegas Vertex Tracker Status Report
Planes, Telescope, System
The Beam Test at Fermilab:
Hall A Compton Electron detector overview
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
Testbeam status report
Beam Test Results for the CMS Forward Pixel Detector
Presentation transcript:

Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC, chiller, electronics, etc. –ORC paperwork remains to be done (no beam yet) –Some issues with cabling and power supplies to be cleand up –Much of the initial testing of Si, ROC still to be done (will need help) –Regularly updated to-do list at o Problems with the PSI43 in the testbeam –At Rutgers “Data Challenge” we uncovered some problems with the PSI43 –Dongwook will discuss… o Testbeam Goals –Finish setting up, do basic checkout of telescope, trigger, ROC –Primary goal of getting system up and reading out pixels we can still do! –More advanced goals include measuring hit efficiencies, looking for broken bonds, bad channels, rotating and studying charge sharing, etc.

Steven Worm – RutgersMar 25, 20032

Steven Worm – RutgersMar 25, Fermilab T936 CMS PIXEL Testbeam Steve Worm office: (630) cell: (630) FermilabRutgersUC DavisNorthwesternJohns HopkinsPurdueMississippi Pre-Setup Task List (3/15/04) Request plug-in boxes on either side of telescope table (one requested) Ask if extension cord power from Alcove is OK in ORC (gist: temporary OK, permanent not OK) Post instructions for how to get rad training, badges, controlled access Test and finalize Rutgers DAQ Test bruno's Si/chip/VHDI with Rutgers DAQ Get fixtures for Bruno's cooling lines to run old cartridge (?) ORC document (and web link?) Get/setup thin trigger scintillators from Muzaffer Get extension cords (have one now, ~25') Fix or correct the address decoding in double-hits Get (4) +/-6V power supplies for Si strips, readout chip, and pixel Get "Beam TV" signal and monitor in Alcove (requested) Re-key the Alcove Control room for EXP29 (requested) Setup Task List Get Rad Worker, Controlled Access training (all)Bring Stepper Motor into Alcove and cable it Kerberize RUDAQ computers in Alcove Better connectors for Stepper Motor and low Voltage supply Mount trigger scintillators (Steve, Muzaffer)Strain relieve cables, shrinkwrap repeater card lines Check second output of CNR 6B scintillatorInstall test PSI43 (Dongwook, Eric) Drill holes in scope to mount small scintillatorAlign Bruno's new scintillator Check second output of CNR 6B scintillatorInstall test PSI43 (Dongwook, Eric) Permission to put chiller between CNR6B and beamstop Fix Si planes (Steve) Install and test Peltier cables and PS Run DAQ in Alcove (John, D'wook, Eric) Get the flow rate of Nitrogen increasedWork with Chuck/Erik to get first beam (Muzaffer, Steve)

Steven Worm – RutgersMar 25, Telescope setup, Mar 17-21

Steven Worm – RutgersMar 25, DAQ for Telescope and PSI43