1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
G2P Target installation and Beyond. Schedule Pivot before.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE RF System Power Supplies, Control and Monitoring Status report
Electrical & Control.
MICE CM31 Schedule summary
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Controls & Monitoring in MICE
Presentation transcript:

1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane John Webb

Recent Electrical Infrastructure work Power feeds for Cryo compressors via distribution boards. 5 th Board added to cover additional compressors (31) Final Location of compressors to be agreed. 2 New up-rated Sub Station 25 installed to provide sufficient power to run all of MICE.

3 400 / 208 V Distribution transformer installed for Cooling channel power supplies. Local distribution board to feed magnet power supplies for Step IV has also been installed adjacent to rack positions. Water cooling pumping system for cooling channel compressors to be modified, with an automatic pump changeover control system. Can this equipment cope with the high magnet field in the services trench ? Power Distribution

4 - PPS field wiring in MICE Hall complete and the search and lockout system has been in use for a while now. Any feedback comments on its operation would be welcome. -Some modifications are planned to the signage/key locking system at the large entrance door/personnel door. - Other modifications may be required to cover the additional shielding that’s planned for the Step IV control rack locations ? -Move Search Points etc. Personnel Protection System

Recent Electrical Control Systems Spectrometer Test Rack at Wang NMR. Interfaced to Magnet power supply Rack & Fermi Lab Quench Protection system. AFC Test Rack for Use in R9 Equipped with VME EPICS control system, instrumentation to control and monitor the feedback sensors and the Magnet power supply. Will be ready for tests in July 5

Recent Electrical Control Systems cont. Temporary Tracker Control system for Mice Hall Tests Allows remote control and monitoring and interlock status. The functionality of this control system will be incorporated into the full hall control system in Step IV. 6

7 Future Electrical Work for MICE STEP IV Proposals Build the Mice Hall Control system for all the instrumentation in the cooling channel. (Temp, He level, Pressure etc.) Build a separate control rack behind the beam dump for Cryo compressor control, vacuum control and Tracker II. Install cable management systems from the North Mezzanine extension upper level to the South side, (service routes to be agreed.) Similarly install additional under floor cable routes from the trench, to provide magnet power supply feeds for Step IV and Step VI. Install all cabling required for the above to Spectrometers & AFC modules. Commission and test all control feedback. Complete software, using feedback from tests on Spectrometer, AFC & Tracker as a base platform.

Recommendations/Layout of Racks for Step IV “With the Strong Magnetic Fields in Mind the Plan is to populate the racks as shown below: 8 Upper Tier (Step IV) Spectrometer Control System (2 racks and blister) AFC Control Rack & Diffuser Shielding Proposal available from Jason for this layout

9 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Upper Tier (left to right) Step IV Upper Tier Spectrometer Control System (2 racks and blister) AFC Control Rack & Diffuser Shielding TBD Recommendations/Layout of Racks for Step IV

10 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) Step IV Spectrometer Solenoid #1 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #2 Power Supplies AFC & Absorbers Circuits Tracker Shielding TBD Recommendations/Layout of Racks for Step IV

11 Upper Tier (left to right) BPM High Voltage equipment Control System Spare Network Lower Tier (left to right) Step IV Spectrometer Solenoid #1 Power Supplies Spectrometer Solenoid Dump Circuits Spectrometer Solenoid #2 Power Supplies AFC & Absorbers Circuits Tracker Shielding TBD Recommendations/Layout of Racks for Step IV

Recommendations/Layout of Racks for Step VI If the Return Yoke Proposal is put into place: 12 Upper Tier (Step VI) RFCC Control Rack AFC Control Rack Spectrometer Control System (2 racks and blister) RF Network/Control Rack & Diffuser Rack

Recommendations/Layout of Racks for Step VI 13 Upper Tier (Step VI) RFCC Control Rack AFC Control Rack Spectrometer Control System (2 racks and blister) RF Network/Control Rack & Diffuser Rack

Recommendations/Layout of Racks for Step VI 14 Lower Tier (Step VI) Spectrometer 1 Spectrometer 1 / 2 Dump Spectrometer 2 AFC 1 / 2 RFCC 1 / 2 Tracker 1 AFC 3

Recommendations/Layout of Racks for Step VI 15 Lower Tier (Step VI) Spectrometer 1 Spectrometer 1 / 2 Dump Spectrometer 2 AFC 1 / 2 RFCC 1 / 2 Tracker 1 AFC 3