HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC High Field Magnet program and HE-LHC Luca Bottura & Gijs de Rijk CERN 1.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

E. Todesco DIPOLES FOR HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Bordini, L. Bottura, G. De Rijk, L. Evans, P. Fessia, J.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
General Considerations for the Upgrade of the LHC Insertion Magnets
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
CERN Accelerator School Superconductivity for Accelerators Case study introduction Paolo Ferracin CERN, Geneva Claire Antoine
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
CERN plans on high field magnet development ¤ Present situation of the LHC ¤ Sc magnet activities beyond LHC start ¤ R&D topics ¤ On going ¤ Conclusions.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
The R&D programme on High Field Magnets (HFM)
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
CERN Conductor and Cable Development for the 11T Dipole
11 T Dipole Project Overview and Status
EuCARD2 WP 10.2 HTS Conductor
11T Dipole for the LHC Collimation upgrade
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC High Field Magnet program and HE-LHC Luca Bottura & Gijs de Rijk CERN 1

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC CERN program on High Field Magnets HFM program aim: High field magnets technology (dipoles and quads) for LHC upgrades and future accelerators Priorities: - Conductor is the heart of the magnet - Magnet design and tests - Germinate new projects First step (2004 – 2012): Conductor technology : NED 1.25 mm, Fresca2 1 mm (2010), 11 T 0.7 mm (2011) Magnet technology : Short Model Coil (2011) Personnel training on existing technologies : test TQ & CERN (2009) Second step (2009 – 2014): Magnet models : Fresca2 (2013), IR quad model (2013), 11 T dipole model (2013) Conductor test facilities upgrade to 15 T test station ( ) Radiation hardness studies for Nb 3 Sn and coil insulation ( ) Magnet concepts from 15 T to 20 T : EuCARD 6 T insert (2013), EuCARD2 (2016) Third step (2014 – 2016): LHC Dispersion Suppressor dipole prototype (2015) LHC Inner triplet quadrupole prototype (2016) 2

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC HFM program gantt chart 3 Continuous conductor development, starting with Nb 3 Sn, now also HTS From the HFM project new construction projects germinate After 2016 this will result in : IT Quad construction, 11 T DS construction and possibly a more targeted HE-LHC magnet development project

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Conductor R&D - NED and post-NED strands 4 The NED program ( /2010) achieved Nb 3 Sn 1.25 mm strands with J C of 1500 A/mm 2 at 15 T and 4.2 K, filament diameter of 50  m, and RRR regularly in excess of 150 The HFM program has since focussed on issues of cable production and degradation, and thermo- magnetic stability Bruker-EAS PIT, 288 subelements, (Nb-Ta) 3 Sn Courtesy L. Bottura, B. Bordini

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Cables for HFM Program SMC Dipole cable – 14 strands (1.25 mm) and 18 Strands (1 mm), Width = 10 mm, Twist Pitch = 60 mm Average I C degradation 0 … 4 % DS Dipole cable – 40 Strands (0.7 mm) Width = 14.7 … 15.1 mm, Twist Pitch = 100 mm, 0.8° keystone Average I C degradation < 3 % Fresca 2 Dipole cable – 40 Strands (1 mm) Width = 20.9 mm, Twist Pitch = 120 … 140 mm Average I C degradation < 15 % Cabling by L. Oberli and A. Bonasia (CERN) 5 Cabling tests were performed on several variants of strands/cable sizes to explore the space of parameters, and among others: dimensions, compaction, twist pitch, cabling angle and cabling force, … Cabling degradation was reduced from 45 % (worst case) to negligible (within the scatter of measurements of extracted strands)

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Conductor R&D Courtesy of B. Bordini (CERN) 6 Conductors to be studied in detail: Nb 3 Sn Critical current as function of field and temperature Nb 3 Sn stability: magneto-thermal instabilities understanding Accompany industry with detailed characterization and metallurgic studies Example: Magneto-thermal instabilities In-depth study to understand this effect which was seen in other labs, Guide strand choice and strand layout development : -small sub-elements ≤50 μm -reduce strand diameter: 1mm, -high RRR: ≥100 -reduce J c : 1250A/mm 15T, 4.2 K

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC LHC upgrade (HI-LUMI) magnet development 2 parallel development lines: Nb 3 Sn : mainstream for LHC upgrade magnets NbTi : fallback solution for LHC upgrade magnets 7 Short Model Coil (2010) Fresca2 Nb 3 Sn Dipole (2013) 11 T DS Nb 3 Sn Dipole (2012) MQXC NbTi Quadrupole (2012)

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Magnet technology development: Short Model Coil An CEA-Saclay / CERN / SRFC-RAL / LBNL collaboration Test Nb 3 Sn cables in a magnet-like setup ( Jc, stress sensitivity, etc) Cost effective training of the manufacturing of Nb 3 Sn coils First coils set (SMC1) tested in Oct 2010: low performance at 40 % Jc Second coil (SMC3) set tested in June 2011: performance 85%-95% Jc –Confirmed in a second test The Fresca2 cable with final insulation scheme will be certified in SMC before a full scale coil will be made 8

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Short Model Coil performance (SMC-3, June & Aug 2011) 12.6 ± 0.1 T Data evaluation by J.C. Perez and M. Bajko (CERN) 9

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC EuCARD WP7 High Field Magnets 12 partner collaboration : CEA-Saclay, CERN, CNRS-Grenoble, Columbus (Genova), BHTS (Bruker), INFN-LASA (Milano), KIT (Karlsruhe), PWR (Wroclaw), SOTON (Southampton), STFC-Daresbury, TUT (Tampere), UNIGE (Genève) One management and 5 R&D tasks: 1.Coordination and Communication. 2.Support studies, thermal studies and insulation radiation hardness 3.High field model: 13 T, 100 mm bore (Nb 3 Sn) 4.Very high field dipole insert (in HTS, up to ΔB=6 T) 5.High Tc superconducting link (HTS powering links for the LHC) 6.Short period helical superconducting undulator (ILC e + source) Duration: – , Budget:6.4 M€ total, 2.0 M€ EC contr. 10   40 mm 25 × 2 × 600 A

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Task 3: High field model (Fresca2) Diameter Aperture = 100 mm L coils = 1.5 m L straight section = 700 mm L yoke = 1.6 m Diameter magnet = 1.03 m 156 turns per pole Iron post B center = 13.0 T I 13T = 10.7 kA B peak = 13.2 T E mag = 3.6 MJ/m L = 47mH/m Courtesy Attilio Milanese, Pierre Manil Challenging construction with several new concepts: Block coil geometry with flared ends Shell-bladder and key structure (inspired by the HD2 of LBNL) 11

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC 11 T Nb 3 Sn Dispersion Suppressor Upgrade: collimators & 11 T dipoles LS : Point-3,7 & IR-2 LS : IR1,5 as part of HL-LHC MB.B8R/L MB.B11R/L 5.5 m Nb 3 Sn 3 m Collim. 5.5 m Nb 3 Sn 3 m Collim 11 m Nb 3 Sn 3 m Collim LS2: 12 coldmass + 2 spares = 14 CM LS3: 8 coldmass + 2 spares = 10 CM Total 24 CM LS2: 24 coldmass + 4 spares = 28 CM LS3: 16 coldmass + 4 spares = 20 CM Total 48 CM ∫BdL = I nom = kA in series with MB with 20 % margin 12

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC HFM R&D for an LHC luminosity upgrade: 11T DS dipole Development started for a twin aperture  = 60 mm, B = 11 T, L = 5.5 m dipole magnet: –40 strands of 0.7 mm –2 layers 14.7 mm width cable –B=11.0 T at 80.4% I ss, T=1.9 K, I=11850 A –Coil length 5.3 m Open issues: –Stability of the strand at 1.9 K –LHC dipole like collar structure –Insulation type –Heat removal from the coil –Inter-strand resistance in the cable : cored cable –Is sub-element diameter 50  m small enough ? 30  m 13

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC HFM R&D for an LHC luminosity upgrade: IT Quad R&D in the US (LARP): Up to now achieved (LQ): Aperture  = 90 mm, G = 220 T/m, L = 3.4 m Now testing (HQ): Aperture  120 mm, G = 170 T/m, L = 1 m Conductors used: OST-RRP-54/61 and OST-RRP-108/127 Cable 27 strands,  0.7 mm, sub-elements  50  m Open issues: -Inter-strand resistance in the cable is low and variable : used a core in the cable -Stability of the strand at 1.9 K to be confirmed -In the sub-element diameter of 50  m small enough ? : develop 30  m -Length limit at 3.4 m, should be 8-10 m -Radiation hard insulation -Heat removal from the coil 14

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC LARP IT quad development program Achieved with Nb 3 Sn: TQ: 1 m, 220 T/m, 90 mm aperture LQ: 3.8 m, 220 T/m, 90 mm aperture HQ: 1 m, 170 T/m, 120 mm aperture with alignment features Plan: 4 m LHQ technology demonstrator by

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Radiation resistance The radiation resistance of the Nb 3 Sn magnets (and HTS) has to be fully proven Effects of radiation on the superconductor, the stabiliser (Cu, Al) and the insulator CERN started in 2010 a program to test radiation effects on the Nb 3 Sn conductor –Radiation tests on Nb 3 Sn conductor carried out at ATI (Vienna) and Kurchatov (Russia) – In the EUCARD program there is a task to select radiation hard insulator material material (impregnation) for the Nb 3 Sn coils –Radiation tests on Nb 3 Sn insulation carried out in at Swierk (Poland) (irradiation starting this month) 16

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Radiation resistance: irradiation tests 17 Insulator electron irradiation at Swierk Courtesy M. Chorowski (PWR) Courtesy H. Weber (ATI) Measurement of Jc of various HEP-grade Nb 3 Sn strand in the TRIGA reactor at the Atominsitut of the Technical University in Vienna

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC 18 Magnet concepts from 15 T to 20 T : EuCARD 6 T insert 18 CNRS, CEA, KIT, INFN, TUT, UNIGE,PWR Objective: Design and realization of an HTS Very High Field dipole insert (6-7 T), which can be installed inside the 13 T Nb 3 Sn dipole of task 3 This is a very first attempt to approach 20 T in a dipole geometry. Very challenging project ! Issues: I c of the HTS conductor: need an averaged J c of ~300A/mm 2 HTS coil fabrication Forces ( ~1000 t/m) Fixing into dipole Coupling, quenching First make small solenoids and only then a dipole

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Magnets for HE-LHC For a TeV collider in LHC tunnel: need 20 T dipoles Present idea: HTS-Nb 3 Sn-Nb-Ti nested coil magnet Scenario set during the Malta workshop in Oct Courtesy E. Todesco

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC EuCARD, 6 T insert ( ) 20 Conductor: YBCO 12 mm tape, back to back soldered, and 2 in parallel, transposed between the poles Number of turns = 170 (of 4 tapes) Aperture h = 20 mm, w = 15 mm “chopped cylinder” inside racetrack Force detainment with welded clamp + shrinking rings L total = 700 mm L straight part = 274 mm I = 2800 A Detailed insert design ongoing Manufacturing of test solenoid pancakes in progress Test of test solenoids this year Quench studies in progress 3D geometry 350 mm 700 mm Courtesy: J-M Rey (CEA), P. Tixador (CNRS & Grenoble) A. Ballarino (CERN)

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Magnet concepts from 15 T to 20 T: EuCARD2 ( ) EuCARD2 HFM proposal to be submitted this month (L. Rossi) Task 1: Conductor development Choice between Bi-2212 or YBCO 10 kA HTS cable 21 YBaCuO coated conductor (tape) BI 2212 round wire The main challenge is to make a high I cable: affordable, stress robust and ‘wind-able’ into a coil

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Magnet concepts from 15 T to 20 T: EuCARD2 ( ) 22 –6 T accelerator quality HTS dipole Never done with HTS before: definitive tests that HTS can be used for this type of magnets –Test 6 T dipole as insert in 13 T dipole Get close to 20 T in a real dipole

HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC Summary After LHC completion CERN is engaging on high field magnet R&D The High Field Magnet R&D is done in worldwide collaborations LARP EuCARD, EuCARD2 Many direct collaboration agreements between CERN and universities and labs HI-LUMI Etc. HFM R&D is evolving into real magnet construction projects: IT quad, 11 T DS, etc HFM R&D for HE-LHC is stepping up 23