Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,

Slides:



Advertisements
Similar presentations
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
TQS Overview and recent progress
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Status report on MQYY (Q4)
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Discussion session on day 1
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
LARP Rotatable Collimators for LHC Phase II Collimation
QXF schedule and milestones
Presentation transcript:

Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools, and Case Studies at LBNL

Outline 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop2 Overview of LBNL Activities within US-LARP Design and Engineering Tools Case Studies Summary

Overview of Short/Long Models activities at LBNL 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop3 QXF Task Leaders at LBNL Dan Dietderich: Cable/ conductor Dan Cheng: Coil fabrication and Trace Fabrication Maxim Marchevsky: instrumentation (and test) Helene Felice*: Support structure Team members Franck Borgnolutti, Ray Hafalia, Nick Heys, Hugh Higley, Daryl Horler, Tom Lipton, Ian Pong (LARP Toohig Fellow), Matt Reynolds, Jim Swanson, Xiaorong Wang * Also overall LBNL QXF activity coordinator The US-LARP magnet effort is a collaboration between BNL, FNAL, and LBNL Current activities are a snapshot of “Pre-project” development of the Q1, Q3 prototypes The “Project” phase will likely change distribution of activities outlined here Short Model (SQXF) activities at LBNL ( ) Cable fabrication of all cable UL Support structure which includes complete magnet assembly to be delivered to FNAL test facility Short coil fabrication: reaction and impregnation Coil Instrumentation (incl. protection heater and trace design and fabrication), magnet instrumentation, magnetic measurements Long Model (LQXF) activities at LBNL (2014 – 2018) Cable fabrication of all cable UL Support structure which includes complete magnet assembly to be delivered to BNL test facility Trace design and fabrication Instrumentation, magnetic measurements Similar teams exist at BNL & FNAL as well

US LARP Magnets Collaboration, Historically 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop4 US partner labs have been involved in many phases of present LARP magnet design, construction, and testing TaskBNLFNALLBNL Strand Procurement ✔✔ Cable Fabrication ✔✔ Strand Testing ✔✔✔ Coil Parts Design & Fabrication ✔✔✔ Coil Wind & Cure ✔✔✔ R & I Tooling Design & Fabrication ✔✔✔ Coil React and Impregnation ✔✔✔ Strain Gage Instrumentation ✔✔ Magnet Structures Design & Fab. ✔✔ Magnet Assembly ✔✔✔ Magnet Testing ✔✔✔

US LARP Long Prototype (LQXF) Magnet Tasks 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop5 “Pre-project” magnet development attempts to focus activities at each Lab Throughput requirements may still determine actual Project activities later TaskBNLFNALLBNL Strand Procurement ✔✔ Cable Fabrication ✔ Strand Testing ✔ Coil Parts Design & Fabrication ✔ Coil Wind & Cure ✔ R & I Tooling Design & Fabrication ✔ Coil React and Impregnation ✔✔ Strain Gage Instrumentation ✔ Magnet Structures Design & Fab. ✔ Magnet Assembly ✔ Magnet Testing ✔

Design Tools used in the US LARP Collaboration 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop6 Aside from CAD systems, the analysis tools are identical at all partner labs TaskBNLFNALLBNL Strand Procurement ✔ Cable Fabrication ✔ Strand Testing ✔ Coil Parts Design & Fabrication ✔ Coil Wind & Cure ✔ R & I Tooling Design & Fabrication ✔ Coil React and Impregnation ✔✔ Strain Gage Instrumentation ✔ Magnet Structures Design & Fab. ✔ Magnet Assembly ✔ Magnet Testing ✔ FNAL CAD: NX Analysis: ANSYS, ROXIE, Opera, BEND BNL CAD: Pro/E Analysis: ANSYS, Opera, ROXIE LBNL CAD: Pro/E Analysis: ANSYS, Opera, ROXIE, BEND

Integrated Design Approach at LBNL 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop7 Integrated Design approach Used in all magnet designed at LBNL Combining: Mag., Mech. analysis and CAD Magnetic Analysis Opera – ROXIE Mechanical Analysis ANSYS Within LARP / Hi-Lumi collaboration Exchange of input files, cross-check of the analysis CERN: Mariusz Juchno, Susana Izquierdo Bermudez, Paolo Ferracin CAD Extensive CAD modeling goes hand in hand with ANSYS analysis Constant feedback to determine the proper level on simplification in the FEM model with respect to the CAD model Exchange of files using STEP files to accommodate all CAD systems

Engineering Standards Applied at LBNL 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop8 Drawing Standards: – ANSI/ASME Y14.5M - Dimensioning and Tolerancing Documentation: – Document Control Center (DCC) for Engineering Notes, Specifications, Travelers Project & Management Tools – Engineering Process Guide: (may not be accessible without LBNL credentials) Safety – EH&S safety manual: PUB References ASME, AWS, OSHA, etc. standards

QA/QC Case Study: QXF Conductor 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop9 QA is an integral part of all conductor-related tasks – Strand procurement – Cable fabrication – Cable insulation QA/QC philosophy (based on PMBOK; see – Preventive Actions Procedures and plans – Documentation and Analysis Reporting (including data) – Adjustments (where necessary) Before problems arise (e.g. SPC)

QA/QC Case Study: QXF Conductor 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop10 Conductor specifications located in LARP Plone document server – Strand, cable, insulation, etc. – Definition of test methods QA – Tracking System Barcode system Unified Cable nomenclature (CERN/LARP/CDP are all compatible) – Traveler/Procedures – QA plan from vendor(s) – Documentation and Discrepancy Reports QC processes reference international standards where applicable, for example: – Strand I c measurements conform to IEC – Cu stabilizer material must meet ASTM B and F68-82, Class 2 or better after fabrication – RRR measurement techniques conform to IEC , with modifications appropriate to LARP Additional details can be found in LARP/Hi-Lumi CM-22 talk by Ian Pong – Id=730 Id=730

6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop11 Standards Case Study: SQXF Coil Lifting Fixture Coil Lifting beam (BNL- designed) Coil shipping mandrel (BNL - designed) Lift Points Lifting tabs (12 places) Coil weight: ~130 lbs./~60 kg

6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop12 Standards Case Study: SQXF Coil Lifting Fixture BNL designed and fabricated the coil lifting fixture – Analyzed and proof-tested per their safety requirements, 1.5x the rated load – Requires 3x safety factor w.r.t. material Yield Stress – Shipped fixture to LBNL However, LBNL PUB-3000 states: – Analysis and proof testing to 2x rated load for lifting fixtures – Requires 5x safety factor w.r.t. material UTS. These additional requirements must be met before LBNL will use this fixture – Fortunately, this is a simple fixture, analysis, and proof test… Lesson learned: – Differences in laboratory standards should be examined to reduce duplication of effort, and to find the common ground for applicable requirements

6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop13 Standards Case Study: CAD Drawings BNL designed reaction and impregnation fixtures for SQXF – Utilized ANSI standards for views and dimensions – CERN reuses the same design and will fabricate parts in Europe—but most of their vendors are not familiar with ANSI standards BNL created additional drawing package with European first-angle projection views SQXF Magnet structures designed and procured by CERN for both CERN & LARP – Uses ISO standards – LQXF (Long model) will be designed in US to ANSI standards This solution may not be practical for assemblies with large amount of drawings/parts – May have to be determined on a case-by-case basis

CAD systems: – FNAL uses NX – BNL and LBNL both use Pro/E CAD models exchange – While Windchill is the database server at both LBNL and BNL, each laboratory maintains their own database, therefore ”official” files remain each respective Lab’s property – STEP files are also effectively used for transferring models between FNAL and partner labs (also between CERN and LARP) – USLARP Plone site has been used, but static files must be manually updated with newer releases Solution of a unified database has not been agreed upon (yet) High-level discussions would need to take place between partner labs’ CAD support to see what is possible and/or practical 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop14 File Exchange Case Study: CAD Models

The US-LARP magnet collaboration has already faced challenges in dealing with tools, standards at different sites – Workable solutions have been found for some issues – Solutions to other issues were “managed” on a case-by-case basis New challenges come with CERN now as a “partner lab” in the long- and short-model magnet prototypes – Differences in ISO/ANSI drawing standards – Safety/process standards need to be compatible Lessons learned from LARP can help to understand how to navigate what we do in the future Workshops like these will help to identify key issues and common ground in standards and processes in preparation for the coming Project 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop15 Summary and Lessons Learned

Thank you for your attention 6/11-6/13/2014D. Cheng, H. Felice – HL-LHC Standards and Best Practices Workshop16