1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Re-clearance Vlad Dorjets, Form EIA-860 Project.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
CPUC CSI Workshop CPUC CSI Stakeholder Workshop San Francisco, CA February 15, 2012.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Fuel Cell Forum-12 March 2007 Considerations on the purpose, feasibility, and design of incentives for Alternative Energy adoption.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Presentation to 40 th Meeting of the APEC Energy Working Group Brunei Darussalam November 2010.
Co-generation Cogeneration is an attractive option for facilities with high electric rates and buildings that consume large amounts of hot water and electricity.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Energy, Society, and the Environment Unit 3 Energy Economics.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
Cost and Supply of Geothermal Power Susan Petty Black Mountain Technology.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 ERUS Management Team May 10, 2012 | Washington, DC Power.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
Pasadena Water & Power Intermountain Power Project Amend the Existing Contracts Participate in Renewal Project Pasadena City Council Item 11 July 20, 2015.
Example 12.6 A Financial Planning Model | 12.2 | 12.3 | 12.4 | 12.5 | 12.7 |12.8 | 12.9 | | | | | | |
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Financial Statement Modeling & Spreadsheet Engineering “Training in spreadsheet modeling improves both the efficiency and effectiveness with which analysts.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Avoided Costs of Generation
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Natural Resource Partners L.P. SMH Capital Investor Growth Conference New York, NY November 8-9, 2007.
© 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Reclearance Vlad Dorjets, Form EIA-860 Project.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
IMPEDIMENTS TO EFFICIENT DEPLOYMENT OF DISTRIBUTED RESOURCES.
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Markets: Recent Changes and Key Drivers for LDC Gas Forum.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Oregon State Bar Association Environmental & Natural Resources Annual Conference October 8, 2010 Athena M. Kennedy Renewable Energy Law Update 2010.
2013 Gaps in Energy Workforce Survey Results For CEWD Members and Survey Respondents Only Not for Distribution.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Energy! Your World and You. Renewable Resources Renewable resources are naturally _________ Some examples of renewable resources are: –________ (sun)
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Non-Renewable Resources Use half a page to copy and complete the following table. MethodHow it worksAdvantages Disadvantages Oil - Oil is burned for heat.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
DEMAND FORCASTING. Introduction: Demand forecasting means expectation about the future course of the market demand for a product. Demand forecasting is.
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Solar Economics (Assessment and Financing) February 10, 2016.
Long-Term Planning Presented by: APP Site Visit Don Untch
Uniper Energy Services
Process Economics Factors that affect profitability
City of Lebanon, Missouri Electric Department
Presentation transcript:

1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models used by government, industry, & NGOs Important considerations for energy market financial analysts, consultants, and academics  EIA already collects some power plant related costs Fuel Certain environmental control equipment  EIA does not collect power plant cost data for Construction Operations & maintenance Major refurbishments, modifications, or upgrades expenditures

Michael Leff and Jim Hewlett, Washington, DC, May 10,  Consider collecting plant costs at all 3 levels of a plant’s life cycle Plant Construction Plant Operation (non-fuel) Plant Decommissionin g

Michael Leff and Jim Hewlett, Washington, DC, May 10,  EIA Costs are a key driver for new capacity additions in the NEMS model projections. The NEMS model uses “overnight” capital costs as an input. This represents the cost of building a power plant independent of time and financing. The inflated expenditures and financing costs are calculated endogenously in NEMS.  Public Input for other energy models Of interest to other government entities (e.g., the DOE Office of Nuclear Energy) Universities

Michael Leff and Jim Hewlett, Washington, DC, May 10,  EIA uses construction costs derived from a 2010 study completed by the engineering consulting firm, RW Beck The RW Beck study allows EIA to compare construction cost estimates for new technologies across a consistent basis Construction cost data from actual projects would be very valuable as a means to update and validate the RW Beck estimates  Public utility commission filings  Other government organizations  Industry associations  Company reports  Press

Michael Leff and Jim Hewlett, Washington, DC, May 10,  For the large planned power plant projects, EIA wants the costs data broken down in the same manner as is shown in Table 1 in the next slide. This detail is needed to determine the reasons for the differences between extended and realized costs Direct Indirect Owners Contingency (for estimates only) Total overnight costs (for estimates only) Total project cost without financial charges Total project cost with financing charges  Note that for units early in the planning process, in all probability the estimates will be in a form similar to the one shown in the first column in Table 1. However, once construction of the unit is completed, the data will be in the form shown in the second column in Table 1 Broken down for large projects only

Michael Leff and Jim Hewlett, Washington, DC, May 10,  All units that entered commercial operation as of 2014  All coal and nuclear units under construction as of December 31, 2014 This will capture the ongoing Vogtle and Summer projects, plus any coal units currently under construction Short lead time renewable and natural gas plants will be surveyed when they enter commercial operation  Estimates for planned nuclear power plants With the exception of Vogtle and Summer, all of the other recently announced nuclear projects are on hold and are not expected to start construction until the later part of this decade For the later group, EIA will track estimates for these units as their planning strategies evolve over time. That will aid in projections of unit operational dates. To keep this process simple, respondents need not report estimates if they have not changed by some reasonable threshold (e.g., 20 percent)

Michael Leff and Jim Hewlett, Washington, DC, May 10, Plant Operation (non-fuel)

Michael Leff and Jim Hewlett, Washington, DC, May 10,  Operations & Maintenance.  Capital  Specific large capital expenditures for individual technologies  Why are these so important? Significant costs, in some cases, can exceed a billion dollars Aging nuclear fleet and life extensions Environmental requirements for coal and nuclear

Michael Leff and Jim Hewlett, Washington, DC, May 10,  The operations and maintenance costs for power plants currently operating  Capital expenditures for power plants currently operating  Specific large capital expenditures for individual technologies Nuclear  Power uprates  Life extension programs  Steam generator replacement  Cooling towers Coal  Pollution control equipment  Cooling towers Renewables  Technology specific, for example blade/gear box replacement (wind), drilling costs (geothermal), inverter replacement (solar), turbine replacement (hydro)

Michael Leff and Jim Hewlett, Washington, DC, May 10,  Pollution control capital costs (Form 860 Schedule 6, Part G & H) Requires the installed cost of existing and anticipated FGD and FGP unit costs be reported These fields would be moved to a new cost schedule on the Form 923 as a major plant capital expense Definitions revised to fit EIA’s definitions of major capital expenditures for coal units  Pollution control equipment O&M Costs (Form 923 Schedule 8, Part B) Requires O&M and capital expenditures for combustion byproducts from coal plants EIA proposes replacing these O&M costs with general costs from each technology. For coal plants, EIA would collected both fixed and variable O&M costs  These costs would be collected on the new cost schedule of the Form 923  For most coal plants, variable costs are associated with environmental control equipment & waste production. This would capture a summary of what is being lost by aggregating the information already collected

Michael Leff and Jim Hewlett, Washington, DC, May 10, Plant Decommissioning

Michael Leff and Jim Hewlett, Washington, DC, May 10,  Costs associated with taking a unit out of service  Potentially most significant for nuclear plants  Information already collected at the PUC level and by the NRC  NEMS model is relatively insensitive to changes in nuclear decommissioning costs  EIA recommends not collecting these costs for this survey cycle. If need be, these costs can be collected directly from the PUCs

Michael Leff and Jim Hewlett, Washington, DC, May 10, Plant Construction Plant Operation (non-fuel) Plant Decommissionin g