Weighline Rail Scale Installation. Track prior to the scale installation.

Slides:



Advertisements
Similar presentations
SOLUTION 1 The configuration of the objects within an apartment does not allow a small apartment area, due to the positioning of the beds. The almost linear.
Advertisements

Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Driveshaft installed. Bits and pieces – new oil seal.
Optical Manufacturing Solutions 1 Probe Assembly.
Handling Marking Depaneling Screen Printing Final Assembly ASYS Line Call Presentation.
Engineering Overview Presenter’s Name
Printing Issues Tracking down an unknown issue.
Reduced Vertical Separation Minimum (RVSM)
Introduction to B-tek “Digital” load cell Shows complete assembly as in the “Centurion” Truck Scale. Shows complete assembly as in the “Centurion” Truck.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
1 TiVi70 – Skin Colour Tracker Welcome to the presentation of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
General idea of a couple of check rod system and adjustments
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
 E4 Electrical Installation #2 Wire Sizing and Materials.
Set up your own server! Go to “Pricing” and select the $25 package.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
The Effects of Engineering Assumptions when Designing a Plate Panel/Stiffener System Under a Uniformly Distributed Load Bernard Nasser Master of Engineering.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
An Introduction to Pandrol’s PANGUARD System
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
© ABB Month DD, YYYY | Slide 1 MG3 Thermal transfer printer Martinez, Marketing, 17/05/2013.
Electrical Materials Continued. Powering your home Homes in Ontario now have Smart Meters, these meters keep track of how much you use and when. The idea.
Page 1 - © Richard L. Goldman RJ-45 Termination ©Richard L. Goldman June17, 2002.
A for Military Ships August What is A? A is a system of: –tube assemblies –tube connectors –tube management closures –fibre bundles –fibre management.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
1 Direct burial cable, up to 24 individual fibers, reinforced.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
German Engineering for British innovation. RS1 = Is there any chance to make our clamps even smarter? + The answer is clearly: “ YES! ”
PRIME (Plastic Removal In Marine Environments) - CS1(SS) Foster.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
AUSAC Meeting March 2-3, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Reflector alignment Recent high frequency results.
Diesel Building Fire Damper Failing Closed Mike Walker TVA.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
BROADCAST MASTER APPLICATION OVERVIEW. Overview Broadcast Master is a complete Channel Management and Ad Sales system providing the ability to manage.
Internship final presentation Paula Skrobucha September- October 2015 Cracow University of Technology Paula Skrobucha PH-DT26/10/2015.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
T. Hajer Brahim & T. Rania Alakazalah U.Y: 1435/1436 H.
Competency: Draw wall sections and details
You have 10 seconds to name…
FRC Team 2337 Plate/Rail Chassis Design Fully functioning prototype making its debut. Featuring ½ X 1 X 1/8 top and bottom rails, 3.5 X 5.0 motor and shaft.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
PAGER PRINTER SETUP. TURN ON THE PAGER – Press the I on the back of the unit.
Kitakami Side AHCAL Assembly or anywhere in any detector.
New Air Handler Platform
Quick Installation – 1/4 Pressure Sensor
Permanent Way.
Lab A: Installing and Configuring the Network Load Balancing Driver
Installation step 4. (3 days)
33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT
Chapter 31 Battery Systems.
אביבה אלקלעי, ראש היחידה לכניסה להוראה, המכללה האקדמית אחווה
מהו הסטאז'? המכללה האקדמית תלפיות.
INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION
Basic Check Link Principles
Ready?.
Repairing the Electrical Components
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Weighline Rail Scale Installation

Track prior to the scale installation.

The new scale!

Existing section removed.

Rail bed is tightly compacted.

Ties installed in required configuration.

The scale installation begins.

Note: position of orange stripes on blue rails in relation to tie spacing!

The orange mark identifies the centerline of each load cell.

Rail scale sections are in place, rail tie plates can now be installed.

Scale is now an integral part of the existing track.

Load cell cables are installed. (sheathed in flexible conduit)

Final adjustments are made.

Track stiffeners are installed.

Scale is tested and verified.

Scale is ready for calibration