CGP Transfers and Terminations How does it end?. Transfers.

Slides:



Advertisements
Similar presentations
Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Designing More Contractor- Friendly Storm Water Pollution Prevention Plans April 6, 2005 Joan M. Meitl.
PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
August’s Top Performers Most new Listings; Most Units Sold; Top producer; Agent name Renee Jean.
Kirsten Ruliffson Program Manager – Real Estate, Rental and Intern Housing.
Stormwater 101: How to stay out of trouble with TDEC.
Construction Unresolved Issue: #1 Legal Authority Controversial issue: Definition of rainy season A.) October 1 – April 30, may be extended by written.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.
Navigating your entitlement to buy and/or sell a residence under Permanent Change of Station orders.
60 th Annual School for Highway Superintendents Record Keeping & Liability Robert Bambino NY Municipal Insurance Reciprocal June 7, 2005 Ithaca College.
BEING READY FOR AN INSPECTION No matter when the inspector shows up.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Applying for the VT Multi-Sector General Permit Step 3. Claiming No Exposure No Exposure is one of two ways to comply with the MSGP. It is the quickest.
AGENDA Program Features Eligible/Ineligible Improvements
Ronald Poe Gabe Robertson Planning and Project Development Division.
Module 7: Construction Phase
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Tax Collection & Enforcement 2010 SUMA Convention Education Session E6 January 31, 2010.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Welcome to training on Best Management Practices for Erosion and Sediment Control.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
How to Select and Pre-screen a Home Improvement Contractor.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Unit 1: Planning and Permitting Mr. Todzia. How does a construction project start? First need someone to initiate……could be the homeowner, a developer.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Test Your Storm Water Knowledge!
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Post - Auction Procedures LPTV and TV Translator Digital Companion Channels (Auction 85) Linda Sanderson, Auctions Marketing Specialist FCC Wireless Telecommunications.
SECOND UNITS IN BRAMPTON BREB BUSINESS BREAKFAST October 8, 2015.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Permit Process & Application Guide
Pollution Control: For Field Office Construction Sites.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
Building Permit Contractor Round Table 8744 Government Drive New Port Richey, Florida Wednesday – May 8, :00 pm to 4:00 pm.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
Tara Condominiums Homeowners Association
For Storm Water Discharges Associated with Construction Activity
MS4 On-site evaluations & common findings
SWPPP Basics.
City Government (Obtaining Permits).
Importance of Pre-Construction Meetings
DTF CONSTRUCTION MONITORING
TPDES MCM 7 Makes Life Easier
TPDES Construction Management at the City of Laredo
Improving Your Construction Site
Planning and BMPs for Large LUPs
Laura Triplett VP, Senior Loan Officer
Ohio EPA, Division of Surface Water
Flow chart to determine whether coverage is required
TPDES Construction General Permit Compliance
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

CGP Transfers and Terminations How does it end?

Transfers

Transfers – Why Permittee must be the party in day to day “supervision and control of activities occurring at the construction site” When operators change, the permit coverage must be transferred to the new operator

Transfers - Operator Changes When a “lot” is sold to a builder/real estate company/investor When a contractor is done, but the site is not “finally stabilized” The road, building, facility is built, but surrounding grounds are not revegetated When one operator is bought by another or assets are transferred between operators Etc.

Transfers – Time Frame Transfer of authorization must occur within 14 days of change in ownership or operational control First owner is responsible for permit compliance until transfer is official

Transfers – How Notice of Transfer and Acceptance (NOTA) Signatures of both previous and new permittees Confirming correspondence to BOTH parties Copy of updated SWPPP to new permittee Copies of previous 12 months of inspection reports to new permittee New permittee updates or rewrites SWPPP within 30 days of transfer

Partial Transfers Working on a new NOTA that will accommodate partial transfers Right now the party taking on part of a project must submit a new NOI while the previous permittee removes the transferred property from SWPPP.

Terminations

Terminations - When Are You Done? Site is entirely finally stabilized Built over of revegetated with a vegetation canopy that is uniform and at least 70% as dense as typical background veg and temporary ESC controls have been removed. Lot is sold, with a home, to the new homeowner Provide Homeowner Fact Sheet if lot not fully landscaped

Terminations - NOT When site meets conditions to end permit coverage, submit a Notice of Termination (NOT) right away Subject to permit conditions until coverage is formally ended Inspections, BMP maintenance, etc. DEQ spot checks sites that have submitted termination requests Confirming correspondence sent to permittee Early terminations do not result in refund of permit fees

The End! Questions?!