156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.

Slides:



Advertisements
Similar presentations
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Advertisements

City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Carroll Engineering Corporation Existing Conditions Richland Township Ronald Reagan Drive Extension Richland Elementary School Strayer Middle School Railroad.
September 24, 2012 Genesee County Road Commission Dye & Court Roundabout Dye Road and Court Street Roundabout Construction John Daly, Manager-Director.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
March 2014 Water Resource Permitting Purpose & Need.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Mecca Roundabout Project Mecca, CA September 28, 2011.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
ROUNDABOUTS. What Is A Roundabout? A specific type of traffic circle Not all traffic circles are roundabouts.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Trail Funding Sources & General Information
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
April 20, 2012 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
At-Grade Intersection Design
Traffic Signs Part Two. What do these 2 signs tell you?
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
TRAFFIC CONTROL ORDERS DOWNTOWN MIDLAND January 23, 2017
ROUNDABOUTING WHAT YOU NEED TO KNOW
Project Management Team Meeting #3
District 3 Complete Streets Projects
Public Information Meeting NW 100th Street Reconstruction Project
ROUNDABOUTS Improving Safety and Efficiency
Issaquah-Fall City Road
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Presentation transcript:

156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE

Project Area Highway 36 Bennington Road City Hall 156 th St Bennington Elementary School

Jan 2007 Project History Team Selected

May 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document

May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held

Jan 2008 May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held Preliminary Engineering

Jan 2008 May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held Environmental Documentation (NEPA) Preliminary Engineering

Jan 2008 Sep 2009 FHWA May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held Environmental Documentation (NEPA) City Preliminary Engineering

Jan 2008 Sep 2009 Public Open House FHWA May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held Environmental Documentation (NEPA) City Preliminary Engineering Oct 2009 Public Open House

Jan 2008 Sep 2009 Oct 2009 Public Open House FHWA May 2007 Sep 2007 Jan 2007 Project History Team Selected FHWA authorized preparation of a NEPA Environmental Document 1 st Public Information Meeting Held Environmental Documentation (NEPA) City Preliminary Engineering Environmental document is currently under review

Project Goals Improve Safety of Traffic flow (Vehicular and Pedestrian) Control Excessive Traffic Speeding Address Traffic Congestion and Queuing problems during School peak hours Improve Drainage and inadequate Storm Sewer system

Project Needs Excessive Speeding along 156 th Street 171 traffic citations (2006); 199 citations (2007); 150 citations (2008); 135 citations (Jan-June 2009) Speed Records along 156 th Street for mph for mph

Speed – Drivers Cone of Vision 40 mph  30 mph  20 mph

Project Needs Poor Traffic Operations and Queuing during school peak hours.

Project Needs Drainage – Open Ditches and existing storm sewer inadequate causing runoff and flooding.

Project Needs Roadway – 156 th Street Pavement rapidly degrading. No resurfacing or rehab done in the last years.

Project Alternatives No-Build Alternative No-Build Alternative Current 2-lane section along 156 th St 4-way stop at 156 th St & Bennington Rd Does not improve traffic operations, excessive speeding and queuing issues Does not improve safety of Pedestrian/ Bicycles Drainage problems will continue to exist

Project Alternatives Build Alternatives Build Alternatives Widen 156 th Street to a 3-lane roadway with a center left-turn lane Provides additional capacity to handle future volumes and queuing at School Provides a refuge lane for left-turning vehicles Provides a transition area for medians and landscaping – shorter pedestrian crossings Traffic Calming like Chicanes (curved roadway) can be effectively incorporated to slow traffic

Project Alternatives Incorporate ‘Traffic Calming’ elements to control excessive speeding Chicanes (Curved Roadway) Medians Landscaping, Trees Roundabouts etc.

Project Alternatives Build Alternatives Build Alternatives Install a Traffic Signal at 156 th St & Bennington Rd More Right-of-way needed to install exclusive left-turn lanes Volumes do not meet ‘Federal Traffic Signal Warrants’ till 2030 – No federal money can be used

Project Alternatives Build Alternatives Build Alternatives Install a Roundabout at 156 th St & Bennington Rd Excellent traffic control to reduce speeds (15-20 mph) Good pedestrian crossings – Shorter crossing distance with refuge medians (one lane at a time) ADA compliant design Eligible for federal funding Functions as a ‘Gateway’ from South

North Segment

Chicanes Curved Roadways to break drivers line-of-sight and Slow drivers

South Segment

Roundabout

Intersection Conflict Points

Roundabouts – How they work ? Source/ Credit: Kansas Dept of Transportation

Roundabouts (similar to the proposed one in Bennington) Test Drive a Roundabout in Omaha Happy Hollow Blvd & Elmwood Park Road ( near 60 th & Dodge)

Public Opinion about Roundabouts Source: Wisconsin Dept of Transportation

Project Area Stop Signs 3-Lane Section (Center turn lane + 1 NB thru lane + 1SB thru lane

Project Area Chicane

Project Area

Roundabout Design

Landscaping

Estimated Costs Project Total Cost - $ 3,7000,000 (approx.) 156 th St/ Bennington Rd Intersection Roundabout - $ 375,000 Traffic Signal - $ 550,000 Mill & Overlay Total Cost - $ 200,000 (approx.) (1” mill + 2” overlay to existing roadway – no drainage improvements or traffic signals or roundabouts )

Thank You Please proceed to any of the stations to Review the preliminary plans Ask questions