JRA1 – SRF report CARE Steering Committee meeting, 11-04-2006.

Slides:



Advertisements
Similar presentations
D.Proch EuCARD kick-off, CERN,Dec.08 WP10 SRF: SC RF technology for higher intensity proton accelerators & higher energy electron linacs.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Status JRA-SRF 2008 MS Project plan for 2008 JRA1_4Y_ mpp JRA1_4Y_ mpp LG_SC_07_08_ mpp Information about scientific progress in WP`s.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC-BCD: Cavity Package International Linear Collider - Baseline Configuration Document: Cavity Package DESY -MPY-
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
CARE JRA1 SRF COUPLERS TUNERS LOW LEVEL RF CRYOSTAT INTEGRATION TESTS BEAM DIAGNOSTICS Treated in highlight talks by P. Sekalski and S. Simrock Work-packages.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Lutz Lilje DESY -MPY- Summary of the Superconducting RF WG DESY -MPY Overview on talks given List European Assets.
CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.
CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.
Status JRA-SRF List of submitted deliverable reports Report on continuing activities –WP 2, WP 4 Status of remaining deliverables Highlights Approaching.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
ILC-HiGrade annual meeting - 12 October 2011 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Sub-Task HOM-BPM HOM based Beam Position Monitors – Planned and Extant Measurements N. Baboi, DESY, Hamburg EuCARD WP 10: SRF, Annual Review Meeting.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Status of SCRF Accelerator Activities at CEA-Saclay
WP5 Elliptical cavities
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
Accelerator Research and Innovation for European Science and Society
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
STFC Contributions to the FCC Study
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
HIE-LINAC status report
High gradients in TESLA nine-cell cavities
Nick Walker (DESY) EU GDE Meeting Oxford
EuCARD RF-Tech Meeting 2 December 2010, PSI
Daresbury ESS In-Kind Contributions
Operational Experience with LCLS RF systems
Presentation transcript:

JRA1 – SRF report CARE Steering Committee meeting,

SRF Work Packages SRF 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis 2.2 Improved component design 2.3 EB welding 3 Seamless Cavity Production 3.1 Seamless cavity production by spinning 3.2 Seamless cavity production by hydroforming 4 Thin Film Cavity Production 4.1 Linear arc cathode 4.2 Planar arc cathode 5 Surface Preparation 5.1 Electro-Polishing on single cells 5.2 Electro-Polishing on multicells 5.3 Automated EP 5.4 Dry ice cleaning 6 Material Analysis 6.1 Squid scanning 6.2 Flux gate magnetometry 6.3 DC field emission studies of Nb samples 7 Couplers 7.1 New proto-types 7.2 Titanium-nitride coating system 7.3 Conditioning studies 8 Tuners 8.1 Actuators and sensor characterisation 8.2 Control electronics 8.3 Piezo-electric tuners 8.4 Magneto-strictive tuner 9 Low Level RF 9.1 Operability and Technical performance 9.2 Cost and reliabilty 9.3 Hardware technolgy 9.4 Software technology 10 Cryostat Integration Tests 11 Beam Diagnostics 11.1 Emittance monitor 11.2 Beam position monitor

WP2: Improved Standard Cavity Fabrication SRF Front side of the EB machine Studies of vacuum seals in Milan Reliability analysis (Eacc vs. # of installation difficulties) report close to completion.

WP3: Seamless Cavity Production SRF New spinning machine operating in INFN-Legnaro Deliverables (#month): Evaluation of spinning parameters (29) 1-cell spinning parameters defined (36)

WP4: Thin Film Cavity Production SRF Linear arc coating at IPJ Swierk DESY to provide single cell cavities for tests in near future.

WP5: Surface Preparation SRF Single-cell EP set up operational in Saclay: Multi-cell set-up in DESY Deliverables (#month): continued Automated EP: Conclude on best electrolyte (44) VT cleaning of 9-cell cavities: evaluation of experimental results (48) Dry ice cleaning of horizontal 9-cell cavities: evaluation of experimental results (48)

WP6: Material Analysis SRF Aim : Improve the sensitivity of Nb sheet quality control Equipment operational: SQUID scanner operational at DESY Flux Gate Magnetometry operational at INFN-Legnaro DC field emission monitor operational at Uni-Wuppertal. Deliverables Final report on SQUID scanning (48) Conclude on comparison of SQUID scanner vs. flux gate detector (48) DC field emission: evaluation of scanning results (48) DC field emission: evaluate strong emitter investigations (48)

WP7: TTF-V and TW60 windows

WP8: Tuners CEA Saclay Tuner Ready for Tests - CARE report SRF Deliverable # 11 for Will be tested early 2006.

WP9: Low Level RF SRF New firmware for FPGA board called SIMCON 3.0 tested in TTF2/ACC1 to control the Vector Sum of 8 cavities in the module DSP daughter board

WP10: Cryostat Integration Tests SRF High RF power tests of fully equipped (coupler, tuner) high gradient RF cavities, in order to qualify new prototypes Deliverable (# month): Cryostat integration tests: final evaluation (46) Achievements so far : Aug’05 : first operation of CryHoLab at 1 MW RF power for coupler RF conditioning Oct’05 : cavity + coupler + CEA tuner installed in CryHoLab CryHoLab re-installation foreseen in 2006, leaving only one year for SRF programme !

WP11: Beam Diagnostics SRF The Diffraction Radiator In place in TTF/Bypass Monte-Carlo simulations Awaiting beam time allocation for tests on TTF (FLASH)