Converter Regulation Board Status WP PO 09/12/2010 - CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
DPNC Daniel La Marra Activities in 2013 for the Electronics Group « GrElec »
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Wireless Telemetry System for Solar Vehicle Scott Cowan Elliot Hernandez Tung Le March 14, 2011 Scott Cowan Elliot Hernandez Tung Le March 14, 2011 School.
Andrei Nomerotski 1 External Electronics : WP4 Andrei Nomerotski, LCFI Collaboration Meeting 28 March 2006 Outline  Test Boards for Sensors : MotherBoards.
WSN based Innovative Education Practice 報告:曾宗揚 指導老師:溫志煜.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Work Package Controls MACS Week June 2010 June 24th, 2010 Johannes Gutleber PR a-JGU, June 24th, 2010 J. Gutleber 1 R. Gutleber.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
I N V E N T I V EI N V E N T I V E EDA360 - Is End-to-End Design a Riddle, a Rebus, or a Reality? April 6, 2011.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
1 WP3 Progress towards objectives 27/10/ WP3.1 Communications equipment for trials The objectives of this work package are: to configure existing.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
12th May 2008AIDA FEE Report1 AIDA Front end electronics Report May 2008 Progress Data compression Plan for prototype delivery.
© Imperial College LondonPage 1 A voltage controller design and it’s hardware implementation for a DC/AC power converter Xinxin Wang Control and Power.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
1NetFusion Family. ●A close family of electronic products providing Ethernet connectivity to a new modern range of powerful FPGA/ASIC processing boards.
MACS week 2/2011 status report nearly end of CWO-3) Joze Dedic … on behalf of CSL MA team the best people.
TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration.
EU Design Study Kickoff Meeting GSI U. Raich CERN AB/BDI Digital Signal Analysis for BPMs The Project –Measure beam trajectories and orbits in.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
PowerBench Programmable Power Supply Dror Lazar Moran Fishman Supervisor: Boaz Mizrahi Winter Semester 2009/10 HS DSL.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Tobias Stadlbauer Special Magnets MedAustron 7-8 October 2010 Special Magnets Controls Status and Plans IntroductionPower SupplySlow ControlsAOB.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Tiltmeter, Compass,Temperature modules for the PPM.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Tobias Stadlbauer, Tony Fowler Special Magnets MedAustron 28 June 2011 Special Magnets Controls Status StatusIntroductionDetailsStatusAOBComponents.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
SKIROC status Calice meeting – Kobe – 10/05/2007.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Piero Belforte 2015: SPICY SWAN SIMULATIONS EXAMPLES
Valérie Chambert and Joël Pouthas
n-XYTER Hybrid Developments
Control Electronics for MedAustron Power Converters
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Figure 1.1 A silicon wafer. Figure 1.1 A silicon wafer.
Figure 1.1. A silicon wafer..
This project mainly concentrates on library message displays by using a typical multi-CPU embedded system Due to the limit of memory space and the real.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Assembly order PCB design
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Presentation transcript:

Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1

What is the CRB ? Enables the PCO to regulate the current (or field) in the magnet Electronic board – 3U x 200 mm Main features: DSP core for regulation Analogue high precision acquisition interface (for current and voltage) Communication interface with PCC (through the FED) Memory buffers 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 2

What is the CRB ? 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 3

What was done ? A lot of things needed and need to be defined : Link between CRB and PCO Link between CRB and PCC Precision required for the current regulation Trigger interface for PCO control B-field measurement … Documents produced : CRB requirements CRB-PCO interface PCO-PCC interface PCO specifications for tendering CRB design : Schematics should be finished by the end of the year 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 4

Next steps ? CRB design : PCB routing – End of January 2011 Manufacturing a prototype – March 2011 Validating the proto – Building a PCO simulator Interface with MACS going on : PCC architecture and driver design PCC and CRB interface XML definition files and RMS 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 5

What needs to be defined ? B field measurement Interface with CRB foreseen High precision circuits - Temperature regulation Work on a temperature regulated rack Interface with Beam Delivery System 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 6