1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Baltic Energy Market Interconnection Plan (BEMIP)
Vienna, 8 April th IG Meeting Meeting Guide.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
2nd RCC Meeting – Region South-South East 13th 2006, Vienna.
1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
An introduction to the EU and its legislation. Member States currently 15 –Austria- Ireland –Belgium- Luxembourg –Denmark- Netherlands –Finland- Portugal.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1st Stakeholder Group Meeting Region South-South East 27th September 2006, Bratislava.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Gas Regional Initiatives (GRI) – Progress Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
1st RCC Meeting – Region South-South East June 1, 2006, ROME.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Christopher Burleson Leslie Kay Ritchie Jitesh Sharma European Energy Restructuring: The Quest for a Competitive Single Energy Market.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Pilot project – Energy Trade Data Reporting Scheme 1 st Steering Committee Meeting Brussels, 5 October 2010.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 11th September st RCC Meeting South Gas Regional Initiative.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
1st RCC Meeting – Region South-South East Part II – Technical Issues Rome, June 1st 2006.
Regional Initiative Progress and Next Steps Graeme Steele.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Bonn Workshops 8 and 9 Feb Gas Regional Initiative North West Region Balancing workstream Workstream leader: Cemil Altin (Ofgem)
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Madrid, 3rd October st SG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative South South-East
New transparency guidelines
Region South-South East
Work plan of GRI NW for 2011 Three out of four projects are started
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
Baltic Energy Market Interconnection Plan (BEMIP)
Gas Regional Initiative South South-East
"Financing Natura 2000 Guidance and Workshops”
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
LNG Workshop Bilbao, March 13th 2009 GLE.
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative South South-East
Presentation transcript:

1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna

2 Agenda

3

4 ERGEG Regional Initiative ERGEG published its gas roadmap for consultation in November 2005 The roadmap sets out ERGEG‘s view on the key issues inhibiting the development of competitive gas markets ERGEG proposed a gas regional initiative to push forward market integration at a practical level Support from all respondents for the gas regional initiative Lack of market integration identified by DG Competition & DG TREN as key issues Launch of the gas regional initiative in April 06 alongside a gas roadmap conclusions paper

5 The idea behind AIM: creation of regional gas markets as a stepping stone towards a single competitive market FOCUS: trading at and between gas hubs and other issues impacting market integration e.g. transparency, network access SCOPE: address the shortcomings identified by DG COMP´s Energy Sector Inquiry Interim Report Market concentration, vertical foreclosure, lack of market integration, lack of transparency,price formation INVOLVEMENT: ensure that all key stakeholders are involved the Commission, MS, TSOs, SSOs, Hubs, traders, shippers, suppliers, consumer organisations,…

6 What do we want to achieve? PRACTICAL OUTPUT: Identify existing obstacles and potential solutions, to increase: market liquidity trading activities and competition, increase number of active traders in the region TPA efficiency through harmonised TPA rules; market oriented and cost-based offer of transport services and flexibility tools; sufficient availability of transport capacities… security of supply and competition through diversification of sources and sufficient availability of transport capacities ENSURE STRONG COORDINATION WITH THE OTHER RCCS AS A FIRST STEP TOWARDS SINGLE MARKET

7 Scope RegionCountriesLead Regulator North- West Netherlands, Belgium, France, Great Britain, Ireland Germany, Denmark, Netherlands NL North (*) SouthSpain, Portugal, Southern France Spain South- South East Italy, Austria, Slovakia, Hungary, Slovenia, Greece, Poland, Czech Republic Italy & Austria (*) Initially the North and North-West REMs will be run jointly, i.e. under the lead of DTe (The Netherlands). Once the first phase of the REMs has been completed it is intended that the North REM will revert to the leadership of BNetzA (Germany) and will be separated from the North West REM.

8 ERGEG - Timetable TimingAction April 2006Finalise scope of gas REMs May 2006ERGEG presents establishment of gas REMs to the Madrid Forum June st meeting of RCC: Establish governance structure; Identify tentative priority actions based on roadmap paper and CEER/ERGEG workplan, DG COMP Sector Inquiry, EC Benchmarking report, stakeholders´ input; report to ERGEG June/July 2006RCCs to decide/establish/convene meetings of implementation Group and Stakeholder Group Aug/Sept 2006 Sept/Oct 2006 Post Autumn 2006 RCC to develop forward Action plan in consultation with implementation and Stakeholder Group RCC reports to ERGEG on Action Plan ERGEG compiles report for 4 REMs and reports to Madrid Forum RCC's and IG Members begin to implement Action Plan. Continued liaison with Implementation and Stakeholders G.

9 Information – Access to Documents – Transparency g/portal/page/ portal/ERGEG _HOME/ERGE G_RI/Gas_Reg ional_Initiative ERGEG website  regional initiatives

10 4.1/GRI: ERGEG is committed to transparency!

11 Contact Persons

12 Agenda

13 ERGEG established Regional Co-ordination Committees (RCCs). Each RCC : - comprises regulators from the region; - has autonomy, & adopts its own decision making process ERGEG established Regional Co-ordination Committees (RCCs). Each RCC : - comprises regulators from the region; - has autonomy, & adopts its own decision making process IMPLEMENTATION GROUP Includes TSOs, SSOs, Hub Operators, other relevant market players This is the ‘do-er’ for each Regional Initiative Chaired by RCC IMPLEMENTATION GROUP Includes TSOs, SSOs, Hub Operators, other relevant market players This is the ‘do-er’ for each Regional Initiative Chaired by RCC STAKEHOLDER GROUP Wide participation including market players chaired by RCC Consultation on RI activities STAKEHOLDER GROUP Wide participation including market players chaired by RCC Consultation on RI activities MADRID FORUM Overall forum for discussing progress in progressing regional initiatives and pan- European consistency MADRID FORUM Overall forum for discussing progress in progressing regional initiatives and pan- European consistency EU COMMISSION 3.1 Structure A list of all nominated stakeholders will be distributed in the meeting

Organisation of the SSE Region – Roles  RCC  Regulators of the Region  Establishment and lead of regional projects  including way of work, decision making, consulting stakeholders, convene Implementation Group/Stakeholder Group, involve Member State governments and EC  Reporting and monitoring of progress  Prepare/commission discussion papers, gather information, distil/develop conclusions/way forward, develop action plan  ERGEG report to Madrid Forum  Member State governments  Relevant powers often rest with MS  responsible for national legislation  EC  Key role in supporting each gas REM project and helping to deliver objectives

Organisation of the SSE Region – Roles  Implementation Group  Agreed proposals need to be implemented in a practical and efficient way  Can be invited to put forward proposals for solutions, actions  Regular dialogue with RCC – e.g. regular formal meetings  Members of IG  Regulators  TSOs, SSOs, Hub Operators,...  Ministries

Organisation of the SSE Region – Roles  Stakeholder Group  Stakeholders views and input crucial for progress  Stakeholders will be involved in definition of detailed objectives and timetable  regulators will ensure full transparency and consultation  formal and informal dialogue  Members of SG  Implementation Group members  Representatives of all relevant market participants eg. consumers, traders, suppliers, grid operators, producer,....

Organisation of the SSE Region – Rules of Procedure  How to consult stakeholders  Consultation Paper circulated and published on ERGEG Website  Bilateral Meetings  Public hearings of stakeholders

Organisation of the SSE Region – Rules of Procedure  Decision making rules  Voting criteria: normally by consensus in RCC and IG. Only in special cases and if agreement cannot be reached voting by ERGEG weights (RCC) or EU weights (IG, by country). Dissenting positions officially recorded.  No votes in the SG  Consultation. A consultation document will be issued by RCC asap and Public hearing in Sept. Regulators chair the session and operators, stakeholders present their views on the proposed issues.

19 Agenda

Priorities of SSE Region – Priorities (1) 1) Monitoring of regulatory implementation in the countries, with particular reference to: Implementation of Directive 2003/55, shortcomings and infringement procedures Steps undertaken to ensure compliance with the Regulation 1775/2205 Scope and guidelines of Regulatory Authority powers and actions

Priorities of SSE Region – Priorities (2) 2) Survey and analysis of the regional market and its problems, particularly:  Current development of hubs and other trading activities in the region  Development of the main physical and commercial gas flows  Current and expected infrastructure development and its regulatory framework  Practical case studies of gas transportation through the region for specific profiles by a fictive shipper:  RUS-SK-CZ-GER (Velke Kapusany - Waidhaus or Hora Svate Kateriny)  RUS-SK-A-SI-I (Velke Kapusany - Goricia)  RUS-SK-A-I (Velke Kapusany - Tarvisio)  RUS-SK-A-GER (Velke Kapusany - Oberkappel)  RUS-PL-GER-CZ (Bobrowniki or Kondratki * Mallnow - Hora Svate Kateriny)

RUS-SK-CZ-GER: Velke Kapusany - Waidhaus or Hora Svate Kateriny RUS-SK-A-SI-I: Velke Kapusany - Goricia 3. 3.RUS-SK-A-I: Velke Kapusany - Tarvisio RUS-SK-A-GER: Velke Kapusany - Oberkappel 5 5. RUS-PL-GER-CZ: Bobrowniki or Kondratki – Mallnow - Hora Svate Kateriny Case studies of gas transportation through the region

Priorities of SSE Region – Priorities (3) 3) Transparency requirements covering:  Access to Storage Services  Hub Service

Priorities of SSE Region – Priorities (4) 4) Interoperability issues:  -Gas quality issues  -Infrastructure interconnection agreements  -Operational balancing

Priorities – Allocation of responsibilities RCC prepares (draft) consultation papers, questionnaires and Action Plan National regulators: to define / liaise with stakeholders provide available data consult with national stakeholders discuss and approve drafts TSOs/HOs/SOs: to provide requested information, discuss and implement agreed Action Plan

26 Agenda

27 Agenda

28 6. Timetable of SSE Region  6.1 Milestones  Draft and circulate consultation document– mid July;  Comments no later than 5th September  Fact finding activity by regulators (compliance with directive and regulation, collection of basic market data)  Draft Action Plan circulation 10.10, approval  6.2 Next steps  First SG – Meeting - Public hearings and discussion 27.9 *) *) 28./29.9 GTE-Conference in Bratislava 29.9 GFG/GWG in Vienna