Central Valley Flood Protection Board Meeting – Enforcement Report 1.

Slides:



Advertisements
Similar presentations
Purchasing Updates Faculty and Staff Presentation Fall Semester, 2010.
Advertisements

Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7A APPLICATION NO
Central Valley Flood Protection Board Meeting – September 27,
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
Office of Federal and State Accountability September 11, 2012.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
SEVIS Student Exchange Visitor Information System The Final SEVIS F-1 Student Immigration Regulations Effective January 1, 2003.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
HEAL Conference 2015 Presented by: LaDonna Patton, MSN, RN, CEN.
Integrity Management Inspection Process Don Moore, OPS Central Region.
Environmental Management Systems in Massachusetts April, 2003.
Central Valley Flood Protection Board Meeting – Agenda Item No. 11 DESIGNATED FLOODWAY MODIFICATION.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
ADWR COMPLIANCE AND ENFORCEMENT MANUAL PHOENIX AMA GUAC 1/6/09.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Department of Water Resources California Levee Database (CLD) An ongoing Initiative to Collect and Catalog Data for California’s Levees and Flood Control.
Central Valley Flood Protection Board Meeting – December 20,
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
Public Hearing February 26, Case:CDR Project:Beck/Overstreet Planned Development / Land Use Plan (PD/LUP) - Substantial Change Applicant:Kevin.
STATE OF ARIZONA BOARD OF CHIROPRACTIC EXAMINERS Mission Statement The mission of the Board of Chiropractic Examiners is to protect the health, welfare,
1 HOW TO WRITE A CORRECTIVE ACTION PLAN (CAP) Presented by Nancy Gates Chief, Financial Policy and Compliance Division April 29, 2008.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Complaints Information Santina Thibedeau March 5, 2009.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
Assembly Bill Local Agency Annual Summary Report Flood Project Integrity & Inspection Branch Division of Flood Management Hydrology and Flood.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
CLR Preview Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio EPA Electronic Licensing and Registration Tools Jim Long.
Noncompliance and Correction (OSEP Memo 09-02) June 2012.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Enforcement What to Expect From the Water Boards, and What to Look for Locally ENTS Workshop August Mark Bradley Office of Enforcement CA State.
PSE&G Credit and Collection
Overview by: Patrick Otsuji - SWRCB Michelle Beckwith - RWQCB.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Fall 2012 DWR Inspection Data Translated to USACE Ratings Presentation to CVFPB by: Rachael Hersh-Burdick, PE USACE – Sacramento District July 12, 2013.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
PRISMS Training April PRISMS Training - January Purpose of the training To achieve full compliance with the ESOS Act, National Code and the.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
Streamlined Penalty Enforcement Program Board approved Waste Tire Hauler Streamlined Penalty Enforcement Program implementation in January 2009 Approval.
Field Services and Compliance Bureau Joe Sanfilippo Supervisor Field Office 1 Air Quality Enforcement Coordinator.
Public Workshop: California Regulations and Test Procedures for Sand Cars October 24, 2006 Air Resources Board California Environmental Protection Agency.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
Washington State Collection Agency Board: Regulatory Process Grace Hamilton, Investigator Department of Licensing – Collection Agency Board Complaint Process.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Wisconsin Department of Natural Resources Perspective on the Industrial Sand Industry March 24 th 2016.
6/13/2016 U.S. Environmental Protection Agency 1 Starting a Facilities Flow Lee David
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
Feather River West Levee Project Project Area C May 24, 2013
Preparing a Right of Way Clearance Certification Request
Reviewing Activity Reports
E-rate Filing Process – Post-commitment
Granville County Government Budget Calendar
FINISHING FUNDING YEAR (FY) 2017 AND WORKING ON FY2018
Presentation transcript:

Central Valley Flood Protection Board Meeting – Enforcement Report 1

 Enforcement Activity – January thru March:  427 Encroachments identified in USACE Inspections entered into DB  5 Fact Finding Letters were Issued  2 – Reached full compliance  2 – Have agreed to comply after flood season or farming activities  1 – Requested a meeting with staff  8 Notices of Violation Issued  2 – Reached full compliance  1 – Incorrectly complied  1 – No response has been received  4 – Issued in late March 2

Central Valley Flood Protection Board Meeting – Enforcement Report  Enforcement Activity – January thru March:  2 – Cease and Desist Orders were adopted by CVFPB  1 – Cease and Desist Hearing  2 – Compliance Letters issued  13 – Encroachment cases closed  USACE Inspection Compliance:  69 Systems are Active for PL RIP Assistance  41 Systems are Inactive  8 Systems are Partially Inactive 3

Central Valley Flood Protection Board Meeting – Enforcement Report 4

 Letter of Intent (LOI) for System Wide Improvement Framework (SWIF) Update:  Reclamation District 1000’s LOI was submitted to USACE March 11, 2013  SBFCA’s LOI was submitted to USACE on March 26, 2013  Reclamation District 1001’s LOI will be submitted to USACE once finalized 5

Central Valley Flood Protection Board Meeting – Enforcement Report Questions? 6

Central Valley Flood Protection Board Meeting – Enforcement Report  Partially Inactive: In the past, USACE inspected portions of levee systems, and would give ratings to portions of levee systems. If 3 LMA’s were responsible for a system, 1 LMA may have been rated inactive, while the other two were rated active, giving the levee system a partially inactive rating. 7

Central Valley Flood Protection Board Meeting – Enforcement Report  Enforcement Database Update:  Encroachments  Recently Entered from USACE Inspection Reports  320 – Before USACE Inspection Reports  Of the 778  122 – Closed  481 – Categorized as “Investigate”  175 – Categorized as “Active”  New Tools in the DB 8

Central Valley Flood Protection Board Meeting – Enforcement Report Status ID Order Status/Activity Month Year Total 18100Encroachment Project Entered into DB Fact Finding Letter Sent Public Hearing by Board Encroachment Closed Encroachment Project Entered into DB Notice of Violation Sent Compliance Letter Issued Encroachment Closed Encroachment Project Entered into DB Fact Finding Letter Sent Notice of Violation Sent Compliance Letter Issued Encroachment Closed