1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

O. Beltramello ATLAS experimental cavern Patrol Procedure LAAWG – October 07 O. Beltramello.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Survey activities during LS1 Dominique Missiaen On behalf of the SU section.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Radiation Protection computing tools Gérald Dumont HSE/RP.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ADO–PO/TC Meeting Safety Activities
ALICE 5 o’clock meeting Wk 51.
Safety in the Neutrino Platform Hall
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Safety in Construction and Upgrade Phases
ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017.
Helium spill in LHC tunnel
Technical Support Activities in EP-ADO-PO
M.Tavlet, H.Taureg - ALICE
Upgrade Strategy for the Experimental Vacuum Systems
Updates on ESS Handbook for Radiation Protection
Radiation Protection Handbook
Presentation transcript:

1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols What is the current status and what needs to be implemented before the end of the long shutdown , Olga Beltramello

2 General Safety A new safety organization have been implemented at Point 1with : Nomination of new PH TSOs and DTSO for the various buildings Nomination of new PH TSOs and DTSO for the various buildings Nomination of the missing safety officers Nomination of the missing safety officers Creation of the general weekly safety meeting every week at Point 1 where all TSO, safety officers, safety engineers, SLIMOS and safety coordinator are reporting Creation of the general weekly safety meeting every week at Point 1 where all TSO, safety officers, safety engineers, SLIMOS and safety coordinator are reporting The main safety issues are reported weekly at OPM meeting The main safety issues are reported weekly at OPM meeting

3 General Safety Work package analysis meetings are held every Tuesday with the WPA manager (William), the GLIMOS, RSO (Giuseppe), ALARA coordinator (Fernando), the safety coordinator and the concerned project responsible. Work package analysis meetings are held every Tuesday with the WPA manager (William), the GLIMOS, RSO (Giuseppe), ALARA coordinator (Fernando), the safety coordinator and the concerned project responsible. These meeting are followed by VIC. Work declaration form (web based) is implemented and mandatory for all activities happening in SR1, SGX1, SX1, USA15, US15, UX15. Work declaration form (web based) is implemented and mandatory for all activities happening in SR1, SGX1, SX1, USA15, US15, UX15. Very active presence of the safety team in the experimental area (all TSOs, WPA manager (William), Franck and Xavier). Very active presence of the safety team in the experimental area (all TSOs, WPA manager (William), Franck and Xavier).

4 SLIMOS desk The SLIMOS desk has been set up operational for the LHC run period and later moved to shutdown configuration. All safety systems and access systems (LACS/LASS, SSA) IHM are implemented and operational. The SLIMOS procedures are available. The SLIMOS handbook is created and under consolidation, this shall be finalized before the end of the shutdown period.

5 SLIMOS desk The Fire Brigade instructions and routes (with the associated signalization in situ) have been implemented (Sofia, Irina and Kathy). The safety systems (ODH, FG, Fire, seismograph), access systems and some missing infrastructure (ventilation) data are currently under collection and shall be inserted in the SLIMOS desk and also in the safety web page (Alessandro). The SLIMOS shifts are operational, about 50 SLIMOS have been trained and qualified (Sofia and Xavier).

6 Safety Systems (Fernando, Sofia, Nuno) Safety systems / safety matrix status : All safety systems (ODH, FG, Fire, Sniffers,..) have been implemented and receptioned.All safety systems (ODH, FG, Fire, Sniffers,..) have been implemented and receptioned. Their maintenance is currently on going.Their maintenance is currently on going. The ATLAS safety matrixes have been implemented and receptioned.The ATLAS safety matrixes have been implemented and receptioned. The maintenance campaign is going on.The maintenance campaign is going on. DSS operational, remaining missing actions or signals are being implementedDSS operational, remaining missing actions or signals are being implemented The FPIAA system remaining missing areas/ configuration (forward platforms, open configuration) are currently under installation. The surface seismograph shall be linked to the SLIMOS desk and the two seismograph events shall be connected to DSS for actions in case of seismic events

7 ATLAS Training An ATLAS training for Fire Brigade has been developed (Sofia, Kathy and Xavier) and the entire fire brigade has been for half a day trained. Very appreciated and successful ! An ATLAS training for visitor guides has been developed to cope with the new access and RP situation (more than 50 people trained by Xavier). The ATLAS Safety training is currently under revision : The ATLAS RP training has been created (Giuseppe)The ATLAS RP training has been created (Giuseppe) The ATLAS access training is under creation (Sofia and Irina) with the help of a Finnish company RecIT.The ATLAS access training is under creation (Sofia and Irina) with the help of a Finnish company RecIT. The ATLAS level 4A safety training shall be revisedThe ATLAS level 4A safety training shall be revised

8 Main Safety Engineering consolidation campaigns before this summer A campaign to improve the overpressure between the caverns and the tunnel is currently on going in collaboration with CV (air flow measurements, sealing improvement, overpressure measurement, implementation of additional pressure or air flow sensors, link to the slimos desk, etc..) (Olga, Fernando, Nuno) An assessment of the criticality of possible CO 2 leaks during ID operation is being performed with the various TRT and ID experts. with the study of the possible technical and operational solutions. A large CO 2 tests campaign will be run in collaboration with ID experts and Fire Brigade to assess the stability of the various CO 2 systems, the various operation parameters and the safety issues.

9 RP issues – General The RPE / RPA team has been trained, the piquet service has been set up and the ATLAS RP activities have been successfully organized and run since the first beams (Giuseppe). Additional training is possible with N. Conan from SC-RP every week, please register. A new session of RPA and RPE training is planned this year, if you are interested please contact Giuseppe or Olga. The ATLAS activation and dose calculations is currently under restructuring and revision (Giuseppe and Zusanna)

10 RP issues – Gate monitors The Radiation gate monitors to detect possible radioactive material exiting at UX15 access points have been selected in collaboration with SC-RP and ordered to Dubna (available end of March). The infrastructure and access points configuration need to be modified to implement the gate monitors, currently under study (Tatiana and Wim). UPX16 ULX15

11 RP issues – Surface Buffer Zone The creation of the surface radioactive buffer zone in the surface building is under study (Patrick). It shall be implemented before the next shutdown period.

12 RP issues – ALARA In order to gain experience when the dose rates are negligible and to prepare for future shutdowns, we have agreed with Michel to follow the coming ATLAS Detector closure and to collect the data required for the ALARA studies. The strategy is the following : Collect for the complete access closure activities the ALARA parameters : type of activity, person ID, type of expertise, time spent to perform each activity, eventually some first possible optimization etc.. Collect for the complete access closure activities the ALARA parameters : type of activity, person ID, type of expertise, time spent to perform each activity, eventually some first possible optimization etc.. The level of detail in the recovery process of the ALARA parameters will depend on the estimated criticality of the activity (low, medium, high) The most critical activities will be filmed and pictures will be taken The most critical activities will be filmed and pictures will be taken

13 RP issues – ALARA The data will be analyzed and an optimization of the working procedures will be established in very closed collaboration with the various working teams. The data will be analyzed and an optimization of the working procedures will be established in very closed collaboration with the various working teams. A dose rate estimation will be performed for the forward shielding removal A dose rate estimation will be performed for the forward shielding removal We willl possibly propose further development of shieldings. We willl possibly propose further development of shieldings. Work out the specification for the personal database and the associated tools. Work out the specification for the personal database and the associated tools. A meeting will be held in the coming 2 weeks to detail the strategy to the various teams intervening in the ATLAS closure activities. A meeting will be held in the coming 2 weeks to detail the strategy to the various teams intervening in the ATLAS closure activities. This campaign will be coordinated by Fernando and requires collaboration from the whole team (access and safety).

14 RP issues – Upgrade studies We have started our participation to the Upgrade studies in collaboration with Michel for the Lar Upgrade and Raphael for the IBL and beam pipe replacement : RP calculations (Giuseppe and Suzanna)RP calculations (Giuseppe and Suzanna) ALARA studies (Fernando and Olga,..)ALARA studies (Fernando and Olga,..)

15 Patrols The ATLAS patrols procedures are ready and tested and debugged. The Patrols are under the responsibility of the GLIMOS. The ATLAS patrol manager is William. Several ATLAS patrols have been run with around 30 persons from ATLAS Collaboration and DT persons.

16 Patrols The patrollers and head of patrol training and validation have to be created and organised. The patrol team piquet on call service are currently under setting up ( for the LHC run period) This on call service shall be associated to other services like RPE/RPA to minimize impact on personnel. No more than 3 to 5 patrols should be expected per year.