Solar Probe Plus FIELDS Quarterly Management DCB_RFS-ADC July 18, 2013.

Slides:



Advertisements
Similar presentations
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
Advertisements

Steven Koelmeyer BDS(hons)1 Reconfigurable Hardware for use in Ad Hoc Sensor Networks Supervisors Charles Greif Nandita Bhattacharjee.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Critical Design Review 27 February 2007 Black Box Car System (BBCS) ctrl + z: Benjamin Baker, Lisa Furnish, Chris Klepac, Benjamin Mauser, Zachary Miers.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
MAPLD 2009 Presentation Poster Session
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
P. Earle p1 November 16, 2001Electrical SNAP Electrical Design Estimates November 16, 2001 C. Paul Earle Super Nova/Acceleration Probe.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept. 2008EFW INST+SOC PDR253 Data Controller Board FPGA Dorothy Gordon UC Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
PowerPC System Design Final Report Group 8 Kyle Brady Rebecca Hansen Ray Harlan Ian Remmler.
12th May 2008AIDA FEE Report1 AIDA Front end electronics Report May 2008 Progress Data compression Plan for prototype delivery.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
J. Christiansen, CERN - EP/MIC
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
HinzeSPP/FIELDS iCDR – TDS FPGA 1 Solar Probe Plus / FIELDS Instrument CDR TDS FPGA Jason Hinze University of Minnesota
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Scott Russell Sponsor: Nigel Thompson Advisor: Dr. William Harrison.
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
Main Electronics Package
GoetzPre-PDR Peer Review October 2013 FIELDS TDS FPGA Peer Review Keith Goetz University of Minnesota 1.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
Advanced Hardware/Software Optimization Techniques for Application Specific MCSoC m Yumiko Kimezawa Supervised by Prof. Ben Abderazek Adapted Systems.
TRIO-CINEMA 1 UCB, 8/10/2010 CINEMA Project Update Thomas Immel UCB/SSL Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS MAG Peter Harvey. MAG FSW Requirements.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
Status of DCC CALICE WEEK University of Manchester September 9, 2008 Franck LLR Polytechnique.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
Goetz22 June 2016 SPP/FIELDS Quarterly UMN 22 June 2016 Keith Goetz 1.
Program Management Agenda
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Instrument Data Processing Unit (IDPU)
Preliminary Design Review
Low Voltage Power Supply & Power Controller Board
Digital Sub-System Dorothy Gordon.
Combiner functionalities
FEE Electronics progress
FEE Electronics progress
Presentation transcript:

Solar Probe Plus FIELDS Quarterly Management DCB_RFS-ADC July 18, 2013

FPGA Daughter Board Development FPGA ETU Daughter board schematics and layout completed – This board houses the Actel/Microsemi reprogrammable FPGA (ProASIC3000) – Fabrication and population scheduled to accommodate integration with DCB-RFS_ADC ETU1 – HDLP Connectors delivery expected in September, 2013 Daughter board de-insertion hardware ETU FPGA Daughter board layout

DCB/RFS_ADC ETU1 Development DCB_RFS-ADC Schematics Completed – Schematic Review held in June, 2013 – BOM released and parts have been ordered DCB_RFS-ADC PCB Layout Completed 3 Boards can be driven by the RFS Frontend ETU1 boards (will be eventually integrated during the ETU2 stage) FPGA Daughter Bd CPU Memory: SRAM, EEPROM & PROM FLASH RFS Memory (SRAM) RFS ADCs and Data Buffers Instrument & LNPS I/Fs S/C I/F We are checking the layout & expect to have boards in August, 2013.

DCB/RFS_ADC ETU1 BOM Most parts are “flight-like” or high-fidelity commercial equivalents on order Linear Power supply (non-flight) replaces LNPS for ETU1 Digital I/F to LNPS is included Instrument I/Fs (to DFB, AEB and MAG-O) are included HDLP Connectors (mother to daughter board) may be the gating item But FPGA Development/Simulation is ongoing during this “waiting period” Design & fabrication of an SRAM adapter (for use of commercial parts) is underway

DCB/RFS_ADC Revised Power Estimate DCB and RFS have been combined into one board and one FPGA Revised Power Estimates include scenarios for DCB (1.6W Avg) only and DCB with RFS subsystem (2.6W Avg). We expect to be able to operate without the ADC External Reference, but have included this as an option on ETU1

DCB/RFS_ADC FPGA DCB related subsystems are well-known (Coldfire Processor has been used for the MAVEN DCB). The DCB portion of FPGA utilization is estimated at approximately 30%. RFS utilization estimated at approximately 40% of the FPGA gates. FPGA SRAM is allocated for filter coefficients and high-speed temporary storage.