Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 GAME ANALYSIS OF INTEREST GROUPS IN POLICY-PROCESSING OF POWER GRID CONSTRUCTION.

Slides:



Advertisements
Similar presentations
Right of Way Acquisition Process Jesse W. Smith Right of Way Manager.
Advertisements

Development and Operation of Active Distribution Networks: Results of CIGRE C6.11 Working Group (Paper 0311) Dr Samuel Jupe (Parsons Brinckerhoff) UK Member.
Financial Statements Audit
Trade & Environment Negotiations Sanjay Kumar 16 th December 2005.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
Transmission & Distribution
Barriers to Energy Efficiency 1 Barriers to Energy Efficiency Energizing Cleaner Production Management Course.
CALIFORNIA’S LEADERSHIP IN RENEWABLE ENERGY: BUILDING AN ENVIRONMENTALLY AND ECONOMICALLY SUSTAINABLE FUTURE Manal Yamout Special Advisor to the Governor.
Frankfurt (Germany), 6-9 June 2011 Ying Wang – China – Session2– Paper 0587 Voltage Sag Frequency Assessment Considering Customer Satisfaction Degree Ying.
Euroheat & Power Why is there not more combined heat and power?
M ANAGERIAL ECONOMI X. CONTENTS… DEFINITION T.E.T V/S M.E.T WAT’S NEW IN MET PROBLEMS IN M.E.T MET & STATISTICS MET & O.R MET & MANAGEMENT ACCOUNTING.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
When integrated models meet stakeholders and data (& vice-versa) WATER BASIN MODELS DATA STAKEHOLDERS POPULATION MODELLERS.
Frankfurt (Germany), 6-9 June 2011 Xin MIAO, and Xi CHEN – P. R. China – Session 6 – 0393 Communication technical standards infrastructure of the smart.
Frankfurt (Germany), 6-9 June 2011 Greet Vanalme – NL – RIF Session 6 – Paper 0786 The introduction of local system services – the case of storage in the.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Frankfurt (Germany), 6-9 June 2011 Shaoqing Ying– China – RIF Session 4 – 0806 Impact of an increasing Penetration of urban Photovoltaic systems and electric.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
W IND E NERGY C HALLENGES. W IND ENERGY HAS MANY BENEFITS Oil independence Locally produced (jobs) No air pollution (or CO2) Uses no water Renewable Lower.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
EPA’s Proposed Clean Power Plan U.S. Environmental Protection Agency.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Principle of Interest-Pay-Say in Community-Based Environmental Management Daigee Shaw President Chung-Hua Institution for Economic Research Taipei, Taiwan.
1 What is Social Responsibility? The Concept of Social Responsibility proposes that a private corporation has responsibilities to society that extend beyond.
Frankfurt (Germany), 6-9 June 2011 MOCCI – IT – RIF Session 5 – Paper 999 Multi-Objective analysis of Regulatory frameworks for Active Distribution Networks.
Frankfurt (Germany), 6-9 June 2011 Analysis of Protection Malfunctioning in Meshed Distribution Grids Evita PARABIRSING Dr. Edward COSTER Dr. Marjan POPOV.
Frankfurt (Germany), 6-9 June 2011 Steven Inglis – United Kingdom – RIF Session 5 – Paper 0434 Multi-Objective Network Planning tool for the optimal integration.
SIMILARITIES AND DIFFERENCES IN THE STRATEGIC ASSET SIMULATION FOR ELECTRICITY AND GAS DISTRIBUTION GRIDS Klaus PetersRWE Rhein-Ruhr - Germany Armin Gaul.
Green tariff for solar energy: practical legal aspects and legislative barriers ROUND TABLE «UKRAINIAN SOLAR ENERGY MARKET: REMOVING BARRIERS FOR GROWTH»
Frankfurt (Germany), 6-9 June 2011 Hugo Morais – Portugal – Session 4 – 0810 ENERGY RESOURCES SCHEDULING IN COMPETITIVE ENVIRONMENT Authors Zita Vale,
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
European Commission views on intra-day and balancing markets
Frankfurt (Germany), 6-9 June 2011 Iñigo Cobelo – Spain – RIF Session 4b – Paper Iñigo Mikel
A Throughput-Adaptive MAC Protocol for Wireless Sensor Networks Zuo Luo, Liu Danpu, Ma Yan, Wu Huarui Beijing University of Posts and Telecommunications.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
Learning Objectives To know what stakeholders are and their roles in the affairs of a corporation. To know the issues, problems, and possible remedies.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Every state in the nation benefits from wind energy.
Frankfurt (Germany), 6-9 June 2011 Thermo-electrical load modelling of buildings for assessment of Demand Response (DR) based on Heating Ventilation and.
A Challenge of Brownfield Redevelopment Indentifying Real Estate Features Brano Glumac.
Frankfurt (Germany), 6-9 June 2011 EUROPEAN REGULATORS’ VIEWS ON REGULATING SMART DISTRIBUTION NETWORKS Authors - Gareth Evans (Ofgem), Riccardo Vailati(AEEG),
Air Pollution as a Feedback Control Loop Andrew McCarthy.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
1. Freight Transport System Facilities: Seaports Airports Rail yards Distribution centers Warehouses High traffic roads Border crossings 2 Modes:
Energy, Agriculture and Policy Development Power for Today’s Agriculture and Rural Communities Dale Arnold, Director, Energy Development Ohio Farm Bureau.
Community Development Department June 10, Mission Statement To ensure existing and future land use projects adhere to federal and state environmental.
ORGANIC AGRICULTURE AND ECOLOGICAL ECONOMY: A WAY FORWARD IN AGRICULTURAL SUSTAINABILITY Dragiša Milošev, Srđan Šeremešić, Milorad Živanov, Bosiljka Todić.
Challenges & Opportunities for Economically & Environmentally Sustainable Development A Port’s Perspective.
MTEF ALLOCATIONS 2016/17 – 2017/18 – 2018/19 Nosipho Ngcaba Director-General Portfolio Committee Briefing March
SUSTAINABLE INVESTMENT STRATEGIES FOR AGING DISTRIBUTION NETWORKS Dr. Eric Jennes 24/7 Netze Mannheim Germany Frankfurt (Germany), 6-9 June 2011 Dr. Eric.
On the Legal System for the Right to Develop and Utilize Water Energy Resources in China Dr.Wang Mingyuan Professor and Director Center for Environmental,
President, Novia University of Applied Sciences Baku, November 2016
The Clutch Control Strategy of EMCVT in AC Power Generation System
Legal Aspects Related to Brownfield Regeneration
National Audit Office of China
Is Neutrality in Distribution Reasonable?
ENGINEERS DO MANY THINGS. ENGINEERS DO MANY THINGS.
Research on profit distribution mechanism of industrial innovation platform based on Grey System Theory Wang lei,Tan qingmei Nanjing University of Aeronautics.
Optimization of the Energy-Supply-Structure of modern Aircraft by using conventional power system technologies Dipl.-Ing. Ilir Purellku Electrical Power.
Transmission As Enabler
Newcastle Launch Thursday 23 May.
Financial Management Services Nosipho Ngcaba Director-General
The UN Forum on Sustainability Standards (UNFSS)
Franchise Agreements: An Opportunity to Promote Clean Energy in Illinois Alexis Cain USEPA, Region 5.
Incentives for electricity infrastructure – ERGEG view
Plans for the 2021 Population and Housing Census
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 GAME ANALYSIS OF INTEREST GROUPS IN POLICY-PROCESSING OF POWER GRID CONSTRUCTION AND RESEARCH ON COMPENSATION MECHANISMS Liang YAN Huzhou Electric Power Bureau of State Grid – China

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Introduction  On the description of problem  How to solve the problem?  Compensation mechanism  Simulation analysis  Research conclusion CONTENT

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 Recent years have witnessed an increase on the conflict existing in construction agents and legal affairs. The policy-processing of grid construction refers to the attainment of agreement between the planner of grid construction and interest groups of external environment. 1. INTRODUCTION

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – ON DESCRIBING THE PROBLEM  Coordinate the economic development of the local life with its social equivalent, improve the related infrastructure and performance of government officials. Local government Local residents Grid company  High standard of compensation for grid- construction land expropriation and environmental pursuit.  Fulfill its social responsibility and lower construction cost. MAIN INTEREST GROUPS

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 Negotiation Coordinated by government Litigate Upgrade Residents: Compensation, Environmental pursuit Government: Economic development, Agency fee Grid Company: Lower construction cost CONFLICTING PATH Conflict 2. ON DESCRIBING THE PROBLEM

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 MAIN REASON: Local residents of power inputting areas will get the benefit from clean energy while local residents of passing-through areas could not get it but environment pollution and land expropriation. 2. ON DESCRIBING THE PROBLEM

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Compensation mechanism based on the stakeholder theory Reduce negotiation space of local government and residents in power inputting areas and expand negotiation space of those in areas which transmission line passed through. 3. HOW TO SOLVE THE PROBLEM?

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Simulation analysis of the compensation mechanism Check the availability of the compensation mechanism 3. HOW TO SOLVE THE PROBLEM?

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Simulation analysis of the compensation mechanism Four interest groups:  One grid company  Two local governments which grid construction passed through  One local governments which electric power is input into 3. HOW TO SOLVE THE PROBLEM?

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  The decision-making model of local residents in passing through areas 3. HOW TO SOLVE THE PROBLEM?

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  The decision-making model of local residents in inputting areas 3. HOW TO SOLVE THE PROBLEM?

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Simulation analysis of the compensation mechanism 3. HOW TO SOLVE THE PROBLEM? Related data of grid company, local government and local residents kbetato P betato V costacostbcostccostdcostecostf Grid company Gov Gov Gov Resident

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Local residents’ profit and cost simulation analysis 3. HOW TO SOLVE THE PROBLEM? Profit curve of local residents without considering stakeholders Profit curve of local residents considering stakeholders

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065  Local residents’ profit and cost simulation analysis 3. HOW TO SOLVE THE PROBLEM? Effort cost curve of local residents without considering stakeholders Effort cost curve of local residents considering stakeholders

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 Firstly, each interest group would like to make an agreement as soon as possible in the process of negotiation.  Local residents  Grid companies  Local governments 4. CONCLUSION

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 Secondly, the compensation mechanism based on the stakeholder theory would be likely to reduce the compensation degree of inputting areas and increase that of passing-through areas to balance their profit. 4. CONCLUSION

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 Thirdly, compensation mechanism based on the stakeholder theory can effectively reduce the appearance of deadlock during negotiation. 4. CONCLUSION

Frankfurt (Germany), 6-9 June 2011 Liang YAN – China – RIF Session 5 – 0065 THANK YOU