Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.

Slides:



Advertisements
Similar presentations
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Commissioning of the Fermilab Accelerators for NuMI Operation Robert Zwaska University of Texas at Austin NBI 2003 November 7, 2003.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
Proton Economics Eric Prebys FNAL Accelerator Division.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division

AAC Review, May 10 th, Prebys 2 Major Features of Long Term Plan  Linac  Primarily maintenance and reliability upgrades  Booster  RF System: biggest issue  Corrector system (dipoles+quads)  Higher harmonic  Main Injector  See A. Marchionni’s talk

AAC Review, May 10 th, Prebys 3 Major Linac Projects  Quad power supplies  Very old technology, reliability concern  Major source of PCB’s  About $1M to replace  7835 filament current stability  Believed to be a source of linac instability  Investigating 480 isolation  Plan to implement on all stations ASAP  Cost ~100K

AAC Review, May 10 th, Prebys 4 Booster RF Issues  The existing RF cavities are an aperture restriction  They are a high maintenance item (primarily the PA), so their activation is a worry.  There is a possibility that heating could be a worry beyond 7.5 Hz.  The RFSUM of the existing 18-cavity system is a limitation to the maximum proton batch size.  Decisions about the RF system are the most significant part of the plan, at least from the finance/resource point of view.

AAC Review, May 10 th, Prebys 5 Why not Commit to a new RF System?  It’s hoped that a combination of alignment and collimators can keep activation under control (initial data very encouraging).  A new RF system would use all of the money forseen for the proton plan. Activation at RF Cavities Date MBooNE Turn on Always been hot cavities Some hot Some cool 10x more protons

AAC Review, May 10 th, Prebys 6 Booster RF Options  New, solid state PA’s  Dramatically reduce maintenance  Similar to Main Injector design  One being used already.  Total cost: ~$7M  Definitely part of the plan  Increase number of RF cavities:  Can use the two large aperture prototypes built with help from MiniBooNE and NuMI/Minos universities  Hope to have at least one in by end of Summer shutdown.  Second in during  Could potentially increase Booster batch size to 6.5E12 or higher.

AAC Review, May 10 th, Prebys 7 RF Cavity Replacement Options  Control losses with alignment and collimators?  Don’t replace  Should know by ~8/04  Move forward with 5” prototype design?  Design complete and tested  Could begin procurement and construction immediately in FY05.  Aggressive schedule could have cavities in place by 2007  Cost: ~6M  Completely new design?  Could be designed with higher GE voltage and reduced HOM.  Frequency range a challenge  Could have design by end of 2005, cavities in place by 2008  Plan to decide on preliminary recommendation by 8/04

AAC Review, May 10 th, Prebys 8 Corrector Packages  The Booster contains corrector packages at each of the 48 sub-periods.  Horizontal trim  Vertical trim  Quad  Skew quad  The trims are not powerful enough to control the orbit throughout the cycle  The quads are not powerful enough to fully control the tune/coupling throughout the cycle  We would like to replace the corrector system with one with roughly 3-4 times the strenght.  Working with TD on the specifications.  Could have in place in ~2 years  Cost ~3M.

AAC Review, May 10 th, Prebys 9 Higher Harmonic Operation  By adding a 30 Hz compononent to the Booster magnetic lattice, we could reduce the maximum dp/dt by ~35%, effectively increasing the RF power.  Pursue prototype in 2005  If successful, implement in 2006  Cost ~$1M

AAC Review, May 10 th, Prebys 10 Proton Projections – Basic Assumptions  Based on stated policies of Directorate…  Run II (pBar production) will continue to have priority.  One NuMI comes on line, it will be given protons up to the lower of: The Main Injector loading/ramp time limit The Booster loss limit  IF the Main Injector loading limit is reached with significant Booster loss headroom, we will continue to run the 8 GeV line (MiniBooNE, FiNESSE, etc) up to the Booster loss limit.  Even with fairly conservative projectsion, we should be able to satisfy the needs of RunII and NuMI  Unfortunately, under this scenario, it is very difficult to make projections wrt MiniBooNE’s future.

AAC Review, May 10 th, Prebys 11 Increasing intensity with collimators  Currently, our most accurate measure of Booster activation is the power loss, which is calculated from lost protons.  This will cease to be a good measure once the collimators are implemented.  Our plan is to measure activation at a set of chosen locations on a weekly basis  Impact ~2 hrs/wk  As activation is observed to decrease, we will increase intensity to keep it roughly constant.

AAC Review, May 10 th, Prebys 12 Predicting Rate Based on Cooldown  Best fit with two roughly equal components:  Half-life 5.6 days  Half-life 282 days ( 57 Co)  Predict effect of increase method based on this model.

AAC Review, May 10 th, Prebys 13 Rate Increase Assuming 50% loss reduction

AAC Review, May 10 th, Prebys 14 Making Projections Optimistic Conservative Stretch

AAC Review, May 10 th, Prebys 15 Projecting to MiniBooNE  Rather than use the instantaneous rate, will scale from typical weekly MiniBooNE totals:  Baseline Scenario:  Improvements compensate for increased protons to pBar -> Continue to average 5.5E18/wk  MBooNE shuts OFF 1/05  Optimistic Scenario:  MBooNE rate increases more or less linearly to 10E18/wk at 1/05  5.5E18/wk after NuMI turns on.  Stretch Scenario:  MBooNE rate increases linearly to 10E18/wk at 1/05  5.5E18/wk after NuMI turns on.  Linearly to 10E18/wk on 1/06 Typically 5.5E18/wk

AAC Review, May 10 th, Prebys 16 Protons to MiniBooNE

AAC Review, May 10 th, Prebys 17 Approximate Timeline  2004  Collimators commissioned and fully operational  L13 Modification  Vertical and RF cavity alignment  Complete alignment network and as-found  19 th RF cavity added to Booster  2005  New ORBUMP magnets and Power supplies.  Horizontal alignment proceeds  Procurement for solid state PA’s  Either design or procurement of new RF cavities, if recommended  Design and procurement for new corrector system  New quad supplies in Linac  2006  Complete installation of solid state PA’s  Install new corrector system  Continue with RF cavity design/procurement.  Install 30 Hz harmonic, if recommended  2007  Complete installation of 5” RF cavities, if recommended.  2008  Complete installation of new RF system, if recommended.