Alternate Project Delivery Systems for Governments.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Benefits of Construction Management
Organization of Primary Entities
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Design/Build Solutions to your construction projects, large and small.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
1 Basics of Government Contracting. Federal Procurement Background The U.S. Government is the world’s largest purchaser of goods and services 2.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
EPC & EPCM contracting.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Measure L Program Implementation Management Considerations Report to the Board of Trustees San Joaquin Delta Community College District July 13, 2004.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Planning & Delivery Systems Construction Engineering 380 Engineering Law.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Qualification Based Selection. Qualifications Based Selection – Basing selection of design professionals on their qualifications first and foremost through.
Financing Urban Public Infrastructure
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
Chief Legal Counsel, OSFC
Session 5: Making a choice: partners and options 1. Identifying partners 2. Role of different partners in providing public services 3. Partnership processes.
CONSTFUNDAMENTALSCONSTFUNDAMENTALS Overview of the Construction Industry, Chapter 2.
AWPHD Legislative Summary House Bill 1196: Increasing the dollar limit for small works roster projects House Bill 1847: Increases bid limits for public.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Construction Contracts and Project Delivery Methods
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
COFPAES Presentation on GSA Federal Supply Schedule/ Multiple Award Schedule Re: Architect-Engineer Services Brian Pallasch, CAE American Society of Civil.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
Construction Engineering 380 Design Contracts. Design contracts are agency relationships Making “estimations” of an individual’s ability to perform Negotiate.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
QBS Colorado FALL FORUM 2011 Daniel W. Akin, P.E. – P.L.S. Chairman QBS Colorado October 4, 2011.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Definitions and objectives of public private partnerships (PPPs) Annemarie Mille.
Construction Management At Risk Process
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
Small Purchase of Professional Service Providers Administrative Rule R
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
AWWA IMS Leadership Forum Project Delivery Systems
Stage VI & VII: Construction and Completion & Formal Opening
PROJECT DELIVERY METHODS
Project Delivery Systems
PROJECT DELIVERY METHODS
Presentation transcript:

Alternate Project Delivery Systems for Governments

Preliminaries Safety, exits Comfort Lunch, ASCE meeting Certificates and Evaluations No, Evaluations and Certificates

Thanks Trish Main and AGC ASCE and employers UAF Student ASCE Moolin Family

Program Agenda – Note breaks – Discussions at end Speaker bio-sketches ASCE Officers UAF Students Three-ring Binder - not

Warm-up Alternate Project Delivery Systems for Governments

Project Need Funding (“programing, “planning,” other) Design Construction O&M Demolition 6

Project Delivery System Defines the relationships, roles, and responsibilities of the project team and sequence of activities required. Incudes Procurement Methods – Contract type – Contractor selection 7

Project Need Funding (“programing, “planning,” other) Design Construction O&M Demolition 8

Contacting Methods Lump sum Cost plus Cost reimbursable “T&M” “In house” 9

Contractor Selection CSB, Completive Sealed Bids Regulations always say “qualified” Define? – Bonding Other? – QBS – “Best Value” 10

“Governments” Different?

Boss Tweed 12

Mid 19 Century US House of Representative, NY State Senator Controlled NY City Stole between 25 and 200 million in 1870 dollars, or about $1 to $8 billion is todays dollars. 13

Tweed’s Project Delivery System Public had need, such a new hospital “Entrepreneur” recognizes need and went to Tweed or his agent Entrepreneur agrees to hire “contractors” designated by Tweed Contractors agree to pay Tweed or his agents when they get the job 14

Tweed gets appropriation for hospital Government hires contractors designed by Tweed Hospital gets built All bad? Tweed and hundreds of others like him led to a plethora of laws governing public construction. 15

Public Construction Contracts Federal – CFRs – 41CFR41CFR – FARs FARs State – Title 36Title 36 Local 16

Public Contract Public Confidence Goal (anti-corruption goal) – Procurement accountability, transparency, equity and fair dealing Public Welfare Goal

“Alternate” Wars – Start with complex regulations – Government can’t process the paperwork – Not enough contractors anyhow – Evolve into expedited methods – Cost reimbursable common 18

Owner’s Constraints Laws – Federal – State – Local Rules – Corporate – PUB – NGO Specify details of process?

QBS Qualifications Based Selection AS – ….procurement officer shall negotiate a contract for an agency with the most qualified and suitable firm or person of demonstrated competence for architectural, engineering, or land surveying services. Negotiations with most qualified – All model procurement codes and federal

Project Delivery System Design-bid-build – A/E Design QBS – Qualifications Bonding Other – Best Value Not quite QBS

Design-Bid-Build, AKA “traditional” or “low bid”

Design-Bid-Build, AKA “traditional” “low bid” QBS Determines need, finds $

Design-Build Design-build – QBS – Technical – Cost

QBS

CMAR, GC/CM Start with CM not at risk CM, consultant

CMAR, GC/CM CM, consultant

What the hell is CMAR? Construction Manager at Risk AKA GC/CM, General Contractor Construction Manager Owner employs the A/E. (Contrast with CM as agent)

Owner hires A/E, who reports to owner CM is selected based on qualifications – QBS The CM provides “preconstruction services:” evaluating costs, estimating, providing value analysis, scheduling, and constructability advice Owner and CM negotiate a price at about 95% design “Guaranteed Maximum Price” (GMP)

Other Job Order Contracting – Many large utilities – Chiefly O&M Public Private Partnerships

Public-private partnerships (PPP) AKA: build, operate, transfer (BOT), build, own, operate, transfer (BOOT) design, build, finance, operate (DBFO) Three possible kinds of arrangements within the definition of PPP: – Financially free-standing projects – all costs for project will be charged to end users, such as toll roads, bridges. – Services sold to private sector – costs for project are covered through charges for the services to be paid upon their deliveries as in the case of schools, student accommodations, hospitals, prisons. – Joint ventures – project costs are recovered partly from end- users and partly though subsidies from public funds.[3]

Discussions Rural, QC, Claims Personal experiences Other points of view Master’s Project Web site