1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 9/3/2009 PHENIX WEEKLY PLANNING 9/3/2009 Don Lynch.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 8/27/2009 PHENIX WEEKLY PLANNING 8/27/2009 Don Lynch.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Seyoung Han / Ewha Woman’s Univeristy
RPC FEE The discriminator boards TDC boards Cost schedule.
Presentation transcript:

1 Onsite Status Itaru Nakagawa RIKEN/RBRC

2 Schedule

3 Optical Fiber Connection Completed by Seiko & Yoshi

4 Fiber Chain Test Completed chain test for data cables. Found 5 dead trunk cables. (Seiko, Yudai, Ray) Arranged repair work with ITD tech on next Thursday (Sept.10). Beam Clock (BCLK) cable test is now underway. (Seiko, Ray)

5 LV Power Last week Present Completed terminal block connections Megapack will be installed today Remote control will be tested next Voltage measurement and adjusting MegaPack Power Supply frank

6 LV Distribution Modules 5 + spare cards to be produced (~1 month) Required Total 16 Available11 Missing5 LV distributer Beam Clock (BCLK) Fanout 50 more optical drivers to be Delivered.

7 OASys Maintenance Camera/power dead? Bad power connector  FIXED! Signal cable swapped Confirmed Powers are back (Yoshi, Yudai)

8 OASys Camera Magnet Effect Tested with permanent magnet. Less than 30 micro meters moved. (Yoshi, Yudai) Try to get magnetic field probe to measure B field of the permanent magnet. Thermocouple Install in South Completed Sensor assembly Ready to run cables. (Seiko)

9 Station-1 Status Octant-7 Chassis Mount Done (Mike Lenz) Pluming Work Done (Mike Lenz) Installing Boards  Cable connections/finalize cabling (Jimmy)

10 Grounding Chassis St-2&3 Completed Grounding Chassis. (Yudai, Ray) Systematic modifications to original grounding scheme. (originally somewhat random configuration. ) Additional ground cable between chassis and chamber will be tested

11 Pedestal Measurement (South, St-2) Ref. Jan.2009 Last week (incomplete grounding) oct1 oct6 oct3 oct4 oct5 oct2 oct7 oct8 Plane-1Plane-2Plane-3Plane-4Plane-5Plane-6

12 Pedestal Measurement (South, St-2) Ref. Dec.8,2008 After grounding completed.

13 Pedestal Measurement (South, St-3) Ref. Dec.8,2008 After grounding completed. Replaced Cathode Read Out Card (CROC) by LANL group

14 Pedestal Measurement (South, St-1) Ref. Dec.8,2008

15 Pedestal Measurement (North,St1) Ref: April.28, 2009 Larger noise by factor of 1.5 ~ 2 since power shutdown in Aug.20

16 Pedestal Measurement (North,St2) Ref: April.28, 2009

17 Pedestal Measurement (North,St3) Ref: April.28, 2009

18 Issues 1.Weak cooling water pressure. No flow in top of octants. FEE operation/functions?  To be modified next Tuesday by CAD techs. 2.John T’s Dedication on PAD chamber until next Wednesday + Mike Lenz on vacation  1 week of no progress in pluming. 3.DCM error&busy MuTR.S standalone (St-1&St-3). No data taking after power shutdown. 4.Short of LV distribution modules  Rental from North. Arrangement necessary.

19 To complete Infrastructure Finish Cabling (Friday) Run MuTR.S standalone Optical –Tray install for trunk cable loop. –Patch bay install at platform. –Trunk cable connection. –Fiber connections. –PatchBay(rackroom) - PatchBay (Platform) - Chassis Chain test –Repair dead cables. LV –Megapack Install (Frank) –Connection to Terminal Block (Frank)  end of this week –LV measurement & tune Chassis –Station-1, Oct-7 Mount (Mike) –Finish grounding St-2&St-3 –Plumming (John+Mike)

20 Welcome Naruya & Junichi

21 Plan for next week Make MuTR.S standalone running (Itaru) Test St-2&3 chassis-chamber ground cable (Yoshi+Ray) LV measurement and tune (Seiko+Ray) ADTX-FEE cable installation to St-1 (Yoshi+Itaru) Daily calibration and analysis (Seiko+Ray) Pedestal analysis code development (Seiko+Ray) Board QA (Naruya+Junichi) OASys temperature, humidity correlation study (Naruya+Junichi)

22 Backup

23 4th Week September South OASys camera alignment Miscabling Check South camera 24, 26 Diagnose Camera 18 Thermocouple install to South Develop noise chart program Develop Cathode cable miscabling checker OASys temperature measurement and correlation North arm Station-3, Octant-1 noise hunt Norm arm noise issue FCI connector debugger (soldering?) Rack room –Setup MRG and cabling –Run LL1 Cable –Run DCMIF-DCM cable