5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60.

Slides:



Advertisements
Similar presentations
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
Advertisements

12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
Objectivity Data Migration Marcin Nowak, CERN Database Group, CHEP 2003 March , La Jolla, California.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
ACAT 2002, Moscow June 24-28thJ. Hernández. DESY-Zeuthen1 Offline Mass Data Processing using Online Computing Resources at HERA-B José Hernández DESY-Zeuthen.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Working Group Meeting (McGrew/Toki) Discussion Items (focused on R&D software section) Goals of Simulations Simulation detector models to try Simulation.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
Computing and LHCb Raja Nandakumar. The LHCb experiment  Universe is made of matter  Still not clear why  Andrei Sakharov’s theory of cp-violation.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina, L.Lueking,
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
25/07/2002G.Unal, ICHEP02 Amsterdam1 Final measurement of  ’/  by NA48 Direct CP violation in neutral kaon decays History of the  ’/  measurement by.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
Horst Fischer University Freiburg / CERN COMPASS Computing.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
CDF Offline Production Farms Stephen Wolbers for the CDF Production Farms Group May 30, 2001.
21 st October 2002BaBar Computing – Stephen J. Gowdy 1 Of 25 BaBar Computing Stephen J. Gowdy BaBar Computing Coordinator SLAC 21 st October 2002 Second.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
F. Rademakers - CERN/EPLinux Certification - FOCUS Linux Certification Fons Rademakers.
10/22/2002Bernd Panzer-Steindel, CERN/IT1 Data Challenges and Fabric Architecture.
CERN Physics Database Services and Plans Maria Girone, CERN-IT
The LHCb CERN R. Graciani (U. de Barcelona, Spain) for the LHCb Collaboration International ICFA Workshop on Digital Divide Mexico City, October.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Andrea Valassi (CERN IT-DB)CHEP 2004 Poster Session (Thursday, 30 September 2004) 1 HARP DATA AND SOFTWARE MIGRATION FROM TO ORACLE Authors: A.Valassi,
Open and Hidden Charm production in 920 GeV Proton-Nucleus Collisions Presented by Marko Starič for the Hera-B collaboration The.
MC Production in Canada Pierre Savard University of Toronto and TRIUMF IFC Meeting October 2003.
Cascade production – preliminary results Cascades  and  are reconstructed in decay chain   and  K, respectively. Plots in the first row show mass.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
15 December 2015Alan Norton, NA62, LKR WG 1 LKR Calibration Topics for 2016 Pedestals Pulser Calibration Bad Channels Time Calibration Small Pulses LKR.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
The Database Project a starting work by Arnauld Albert, Cristiano Bozza.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
PADME Kick-Off Meeting – LNF, April 20-21, DAQ Data Rate - Preliminary estimate Tentative setup: all channels read with Fast ADC 1024 samples, 12.
Jianming Qian, UM/DØ Software & Computing Where we are now Where we want to go Overview Director’s Review, June 5, 2002.
Apr. 25, 2002Why DØRAC? DØRAC FTFM, Jae Yu 1 What do we want DØ Regional Analysis Centers (DØRAC) do? Why do we need a DØRAC? What do we want a DØRAC do?
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
PC Farms & Central Data Recording
LHC experiments Requirements and Concepts ALICE
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
The COMPASS event store in 2002
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
COMPASS off-line computing
ALICE Data Challenges Fons Rademakers Click to add notes.
Presentation transcript:

5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60 (Carlos Lourenco) EP/SFT Inherited Commitments (John Harvey)

5 June 2003Alan Norton / Focus / EP Topics2 NA48/2 COMPASS NA60 JUNE 13SEP 8OCT 26

5 June 2003Alan Norton / Focus / EP Topics3 Measure of the asymmetry in the Dalitz plot of   from  K + with respect to   from  K - Many other rare K decay channels

5 June 2003Alan Norton / Focus / EP Topics4 NA48/2 Requested:120 days in 2003 Got: ~ 70 days New Beams – simultaneous K + K - New Beam Spectrometer Different Trigger setup

5 June 2003Alan Norton / Focus / EP Topics5 To limit the biases due to the detector differences during the the data taking the K + and K - are simultaneous

5 June 2003Alan Norton / Focus / EP Topics6 Data taking: 75 days (minus Machine Development) 2 levels of hardware trigger select ~60 K trig/burst which are recorded by the online Pcfarm. The load corresponds to 0.5 GB of rawdata/burst Triggers are filtered by a L3 software trigger to produce several data streams: 1. goldraw: raw format. 2. goldcmp: compacted format (1/5 of raw). 3. calibration and streams for specific studies:10% of the full statistics.

5 June 2003Alan Norton / Focus / EP Topics7 L3 to be used in flagging mode Goldraw, goldcmp and other streams are written to Castor Total load per burst : 0.5 GB(goldraw) + 0.1(goldcmp) + 0.1(other streams) = 0.7 GB/burst which gives 3.5 TB/day and 175 TB in total (assuming ~70 % data taking efficiency.

5 June 2003Alan Norton / Focus / EP Topics8 NA48/2 Dedicated use of CDR and CASTOR Priority channels Reduce ~ 25 TB goldcmp to ~ 5 TB L3 runs continuously on lxbatch ~ 100 jobs on average Not yet fully migrated from ‘old’ na48 setup CDR main control on a Sun Na48pc/na48cern used for Lkr calibration Installation of 10 disk servers now critical !! 7 from Cocotime 3 from NA48/2 institutes

5 June 2003Alan Norton / Focus / EP Topics9 NA48/2 Preliminary Analysis during the run Priority channels Reduce ~ 25 TB goldcmp to ~ 5 TB Report to SPSC in October Quality of data Backgrounds Significance of sample

5 June 2003Alan Norton / Focus / EP Topics10 Compass DAQ period already started –Experiment under Setup –Physics running expected by mid June –Expected sample This year period will be shorter than last year one (~80%) assuming the last year efficiency expect to collect about 200 TB of raw data or more (will enlarge trigger acceptance to test On Line Filtering –Expected sustained DAQ rate Added more tracking devices but event size should not change much Same SPS duty cycle ~ 40 MBps or more (due to higher trigger rate) –No L3 Trigger (On Line Filtering) yet But it is being tested flagging events. Trigger rate will be increased up to 30% to test flagging efficiency

5 June 2003Alan Norton / Focus / EP Topics11 Compass (continued) 2002 Data Production –Still on going due to several delay sources (Objectivity → Oracle) & (9940 → 9940B) migrations troubles –Software setup –Delayed 9940B drives delivery Spectrometer alignment and “understanding” –Some Period Production delayed due to long code certification procedures –We will need to reprocess Objectivity data too –50% of 2002 data processed 4 “SPS periods”. 1 period to be produced 3 periods to be re-processed (the ones stored in Objectivity/DB) –0.7 s/event (on a 1GHz PIII machine) Improvements in production code slowed down program speed –Asked >100 SPECint200 needed to process all 2002 in ~ 4 months Up to now: we got no more that half of such CPU power

5 June 2003Alan Norton / Focus / EP Topics12 Compass (continued) Oracle DBs –Got help from IT for migration ~1FTE from IT, ~1-2 FTE from COMPASS –Lost 1-2 months due to delay in 9940B delivery and various troubles –Reasonably stable now Some problems still appears –Forced to stay on GCC2 due to available Oracle libraries No way to completely certify out code using GCC3 We risk to be the unique experiment asking for GCC2 installed when upgrading to future Linux releases

5 June 2003Alan Norton / Focus / EP Topics13 NA60 Indium Run: ~ 30 days in 2003 Will run with Protons in 2004 Expect about 0.5 TB per day Use CDR and Castor All analysis done locally Private Linux setup in B559 PC farms in Lisbon and Cagliari Main problem is network connection to B559

5 June 2003Alan Norton / Focus / EP Topics14 Commitments taken over by EP/SFT CERNLIB (including PAW and GEANT3) till end 2003 keep-as-is from 2003 AIDA (ANAPHE) residual support mainly HARP and Compass ? Geant 4 tests & examples GEANT4 (MoU -> Collaboration agreement) current level of support for visitors, PA for development of physics components