Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Review of industry code governance 26 March 2010.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Code Administrators Working Group Introduction 28 August 2008.
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Modification Panel Constitution and Voting Rights Tim Davis March 2010.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Code Administrator's Working Group Duncan Burt CUSC and Grid Code.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Code Governance Review Overview of consultation documents Mark Feather 11 February 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Customer Charge On behalf of all DNs 25 October 2010.
Code Administrators Working Group (CAWG) Meeting 3, 29th October 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Industry Dialogue on xoserve Services 14 th September 2007.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Presentation to the BSC Panel
Presentation to the BSC Panel
Grid Code What is the Standard Modification Process? Panel
Manifest Errors for Entry Capacity Overruns Workgroup 364
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Introduction of Code Contingency Guidelines Document
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC Trader User – Licence obligations
Electricity Governance Comparison
Code Governance Review UNC Modification Proposals
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Rebecca Hailes For 15 March 2018
Joint Office Presentation for Modification 0678
Introduction of Code Contingency Guidelines Document
Mod Proposal 0268 : AQ Backstop Date
Richard Fairholme Transmission Workstream 4th September 2008
Modification proposal 330
Consideration of issues raised by UNC Modification Proposal 0244
CUSC “Alternate” Proposal process
Options for the Development of a Demand Side Response Mechanism
CUSC Amendment Panel Recommendation
Ofgem presentation to Gas Transmission Workstream
Commercial Arrangements For Gas Quality Service – Introduction
Joint Office UNC Elections
Joint Office UNC Elections
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Joint Office UNC Elections
Presentation transcript:

Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS

Background – Code Governance Review (CGR)  Ofgem announced the Review of Industry Code Governance in November 2007  Code Governance Review (CGR) concluded at the end of March 2010 when Ofgem published their Final Proposals  The licence modifications necessary to implement the Final Proposals for the CGR and the Code of Practice (CoP) were published on 3 June 2010 and become effective on the 31 December 2010

Background – Review Group 0267  Review Group 0267 “Review of UNC Governance Arrangements” raised October 2009  The Joint Office of Gas Transporters (JO), has been working with the industry on the necessary modifications to the UNC via the Governance Workstream  National Grid volunteered to raise all the necessary governance modifications to implement the CGR Final Proposals  National Grid have committed to liase with the industry in development of the proposals

Distribution Workstream – objectives of presentation  Raise awareness of approach and timetable for developing the CGR UNC Modification Proposals  Provide an overview of the content of each Modification Proposal  Facilitate the provision of feedback  Modification Proposals will be updated and formally raised for August Panel – consultation

Significant Code Review (‘SCR’)  UNC Modification Rules change  3 main elements of proposal:  Prevent an SCR related non-urgent Modification Proposal being raised during an associated SCR period  The treatment of Modification Proposals determined as relating to a SCR  Withdrawal or variation of SCR driven Modification Proposals

Self-Governance (‘SG’)  UNC Modification Rules change  3 main elements of proposal:  Clarification of when a Modification Proposal shall follow the Self Governance route  A Self Governance Determination by the UNC Panel  Appeals Process

Environment  Evaluation of proposed modifications shall include assessment of the quantifiable impact on greenhouse gas emissions  Details to be included in reports produced during progression of the proposal

Charging Methodologies  Two proposals  NTS Charging Methodology and Connection Charging Methodology  Distribution Network Charging Methodology  Key elements:  Existing methodology (to be detailed in Appendix A) is incorporated within the Uniform Network Code  UNC Modification Rules are amended to reflect that:  a change to the Charging Methodology is not able to be made unless the requirements of the UNC Modification Rules are complied with  the Transporters must convene regular meetings of the charging methodology forum/s  a Modification Proposal in respect of a UNC Charging Methodology may only be made by a UNC signatory or a Materially Affected Party (being a person or class of persons designated by the Authority for this purpose)

Role of Code Administrators & Code of Practice  The CGR Final Proposals require that code administrators:  Act as a ‘critical friend’, in particular to small participants; and  Act consistently with the Code Administrator Code of Practice.  Other key elements:  Ofgem send back powers  Published reasons for Panel recommendations (based on relevant objectives)  Legal text provision  Cost information  Super Mod (in terms of volume of changes to the mod rules)

Alternatives  Aspect of the Code of Practice (CoP) - the approach to be taken when raising alternatives to Modification Proposals:  alternative solutions being developed to the same degree as an original solution; and  alternative proposals are raised prior to or during the working group stage.  No alternatives (or further alternatives) can be raised once a Modification has been issued for Consultation

Appointment and Voting Rights for a Consumer Representative and Independent Panel Chair  Modification Proposals 0286 and 0286A: “Extending Modification Panel Voting Rights to Consumer Representative(s)”  Ofgem minded to approve 0286A  Main elements of proposal:  Option for the Authority to appoint a further Consumer Representative member  Independent chair’s casting vote