DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.

Slides:



Advertisements
Similar presentations
The Lab Report Dobbs Elementary Volume 1, Issue 1 September 9, 2009 New and Improved Computer Lab Schedule Check out the 09~10 Computer Lab Schedule. Much.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
Mr. Mercer’s Science Class
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
ASTR100 Midterm PLEASE WAIT OUTSIDE UNTIL CALLED IN.
ASTR100 Final Exam PLEASE WAIT OUTSIDE UNTIL CALLED IN.
School Census 2014 Primary School Application Version 0.1.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #12 Gateway To Space ASEN 1400 / ASTR 2500 Class #12 T-58.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Home Media Network Hard Drive Training for Update to 2.0 By Erik Collett Revised for Firmware Update.
State Term Contract & State Purchasing Agreement Website Innovative Ideas towards Improving Your Buying Experience DMS State Purchasing IT Team.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
1 Project Information and Acceptance Testing Integrating Your Code Final Code Submission Acceptance Testing Other Advice and Reminders.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
M. Circella, A few issues, QA/QC meeting, 12 June 2015 Product history and status in DB Customs rules Remarks on documentation 1 A few issues.
1/18 CMMI Risk Management Jense Seurynck Daan Van Britsom Risk Management.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
State Term Contract & State Purchasing Agreement Website Innovative Ideas Towards Improving Your Buying Experience DMS State Purchasing IT Team.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Simulation Using computers to simulate real- world observations.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Managing Hazardous Chemical Waste. What is Hazardous Waste EPA Definition: A material is a hazardous waste if due to its quantity, concentration, physical,
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
School Census 2014 Secondary School Application Version 0.1.
Team X Review. The members of Team X propose to develop a therapeutic activity system using a Microsoft Surface unit and a Windows 7 desktop. By working.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
DOM INTEGRATION MEETING DAAN VAN EIJK 28 JANUARY 2016.
Advances In Software Inspection
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
TRD Electronics Flight Production Wim de Boer, Kai Gassmann, Florian Hauler, Andreas Sabellek, Mike Schmanau IEKP - Universität Karlsruhe (TH)
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
COLLABORATE 13- OAUG FORUM OAUG Speaker Orientation March 19 th at 3:00 PM March 21 st at 11:00 AM.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
LINCOLN UTC EXAMINATIONS SUMMER 2016 o On the day o Regulations o Preparation o Invigilation o Timetables o What to bring? What to expect? o Problems on.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
Test boxes software and first tests V. Kulikovskiy.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Business English An Introduction. What do you think is the most important aspect of business English?
DOM & DU tendering and assembly
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Status Optical System KM3NeT
DOM acceptance and calibration
BAND EXPECTATIONS AND PROCEDURES
LKr status R. Fantechi.
Concluding remarks E. Migneco
DOM integration meeting
DOM integration meeting
TileCal upgrade EVO meeting Demonstrator tesks
DOM integration meeting
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
DOM integration meeting
External Exams - Basic Information and Tips
DOM Assembly SUBATECH status H. Carduner, Bari June
AP Chemistry Day 3 – Quiz Unit 1, Begin Analysis of Food Dyes.
What: Farmers Market Type Event Where: Primary School Hallways
Presentation transcript:

DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015

INTRODUCTION My apologies for the late notice for this meeting I’ll be on holidays next week (October 4-11) Urgent matters: Marco The week after is the week of the Collaboration Meeting I hope to see many of you! 2

ISSUES FROM PREVIOUS MEETING Default fiber to splice on PAVE penetrator: the black one Proposal to mark the spliced fiber outside of the DOM The mark can be positioned very close to the exit of the fiber protection tube. That position is the less handled during the BEOC mounting so we can assume the mark will not fade out with handling. If default (black): with Tipp-Ex If white: with pen/ink DOM integration procedure: Irene didn’t have time to work on it as she’s working on the base container DOM integration review: Date? Help needed? 3

DOM INTEGRATION STATUS: DU-2 DOM production for DU-2: 18 DOMs finished in Amsterdam (CH56C down to CH22C) All DOMs connected to DU-2 VEOC! 3 DOMs ready for acceptance test in Naples (CH32C down to CH28C) I hope to hear from Daniele about the status of their test setup 3 DOMs finished in Catania (CH26C down to CH22C) 4

DU-3 AND ONWARDS Amsterdam: type B (CH55H-CH21H) 12 DOMs on assembly benches in Amsterdam Filled PMT structures are ready for at least 10 more DOMs Erlangen: type B (CH55H-CH21H) Catania: type C (CH55C-CH21C) Naples: type D (CH54H-CH20H) These DOMs are (pre-)registered in the DB. The UPI’s have been distributed to you. 5

DOM COMPONENTS DOM integration goal 18 DOMs to be built at each integration site (Catania, Naples, Erlangen) before the end of the year DOM component situation improved since last meeting 64 PAVE penetrators arrived at Nikhef Testing will start as soon as possible 20 new fiber trays have arrived Re-design including a holder for the A/D filter QR code Availability of DOM components remains a problem (Except for Nikhef) I prepared a shipment for Naples: All components needed to complete 18 DOMs Except PMT’s, penetrators (coming soon after testing) and grounding cables The boxes will be included in shipment of DU-2 to Naples I will prepare similar shipments for Catania and Erlangen soon 6

CURRENT ISSUES ELOG usage: Every individual DOM is now defined as “Type” This makes it easy to collect all information about one particular DOM We started using the elog as placeholder for functionality and acceptance test sheets Please do the same for your DOM tests! Please have a lookand use the elog! CLB/AHRS statistics at Nikhef: Waiting for more news/info from Giorgio At next Steering Committee? Firmware and embedded software versions to be flashed on CLB’s For now: use latest revision as advertised on sions sions Waiting for more news/info from Giorgio/Tommaso/Diego At next Steering Committee. 7

CURRENT ISSUES DOM testing Waiting for a calibration procedure for the AHRS Only when this is defined, we can start measuring meaningful values to be filled out on the acceptance test sheet Waiting for input from Calibration Group PMT threshold In ALL setups (i.e. DarkBox, Green Box, Blue Box, anything!) the PMT threshold should be set to “2F”, translating in 1113 mV That’s the value at which the PMTs were calibrated in the DarkBox Analysis software: We need to define a standard, which can then be centrally distributed Ideas? Dark storage of DOMs before testing Proposal for integration sites without dark room to store DOMs in light-tight bags Suggestions? 8

DOM TEST RESULTS 9 DOMAcceptedPROMi S ID PressureIBoot time FPGA TWR THumidit y Piezo noise Piezo line # PMTs [N] DC #PMTS [N] ToT 40NNNNN/A NNN NNNN/A 43NNN926 NNN/A N N/ A325 28NN529 NNNNN/A NN15 31NN626 32NNN627 33NNN/ANN4 64NNNN NNNN828 37NNN NN313 39N629 38N324 65NNN526 66N417 70NN24 71NN35 72NN219 Notes: Catania DOMs Underlined: DOM31 and DOM38 have new PMT structure: improvement in dark count? New HV caps: no effect observable in DC’s No compass calibrations performed on any DOM (no procedure defined, excluded from this table)

COLLABORATION MEETING There is a DOM integration time slot of half an hour Who will be there from the DOM integration leaders? Can I ask you to present the status (max. 6 minutes each)? For the people who are not present: will you present remotely or find someone else to replace you? Emanuele asked to have a tour around the Nikhef DOM integration site A very good opportunity to exchange experience! Invite all DOM integration team leaders + others interested Proposal: Tuesday 13/10, 14:00 – 16:00 10

BACKUP 11

DB: RED-TAGGING 12