10 th Argo data management 2009 Toulouse What is new at GDACs ?

Slides:



Advertisements
Similar presentations
10 th Argo data management 2009 Toulouse Argo format and CF compatibility OceanOBS09 Strengthen and enhance the international framework under GCOS, GOOS,
Advertisements

ADMT10 - Toulouse, 30 Sept 2009 ADMT9 Action 24 “Develop a common method for determining the positions and observation times at DACs”
Groom-gliders data-management workshop Brest, December 2012 Groom gliders data management n In 2012 : vertical profiles from 26 platforms.
Slide 1 of 10 Job Event Basics A Job Event is the name for the collection of components that comprise a scheduled job. On the iSeries a the available Job.
Barcode Tracking At ReCAP ReCAP LAS CUL “Big File” + - Pending Directory SubmitTracking Database Request Directory + Columbia University 2/6/09 Zack Lane.
System integrity The term system integrity has the following meanings: That condition of a system where in its specified operational and technical parameters.
Kick-Off Seadatanet – Heraklion – 7-11 June Atlantic and global products C. Coatanoan, F. Gaillard, E. Autret, T. Loubrieu.
Data Dictionary What does “Backordered item” mean? What does “New Customer info.” contain? How does the “account receivable report” look like?
Argo Real-time Quality Control Process NOAA/AOML: Y.-H. DANESHZADEH, R. MOLINARI, R. SABINA, C. SCHMID CIMAS/UM: E. FORTEZA, X. XIA, H. YANG.
Argo QC with an emphasis on the North Atlantic Justin Buck British Oceanographic Data Centre Joseph Proudman Building 6 Brownlow Street Liverpool L3 5DA,
Global Argo Data Repository Status Report for 2009 Charles Sun US National Oceanographic Data Center 10 th Argo Data Management Team Meeting 30 September.
Chapter 4-1 The Islamic University of Gaza Accounting Information System The Expenditure Cycle : Purchases and Cash Disbursements Procedures Dr. Hisham.
Quick Start Guide. This 22 page introduction to the Financial Assessment Subsystem provides the user with a visual overview of the components of the system.
10th Argo data management 2009 Toulouse User’s manual comment Here is a list of comments received on User’s manual version 2.2 since August 28 th. Jean-Philippe.
First Data Management Training Workshop, February, 2007, Oostende, Belgium 1 Quality control checks description First Data Management Training Workshop.
Exchange formats and APIs Questions – how and when to access metadata? – lifecycle/status – how to access? can things disappear? – is CSV enough? – is.
Records Survey and Retention Schedule Recertification 2011.
Electronically approve and create Suppliers in Oracle Financials using a combination of APEX and Oracle Workflow. NZOUG Conference 2010 Brad Sayer Team.
Ingest and Dissemination with DAITSS Presented by Randy Fischer, Programmer, Florida Center for Library Automation, University of Florida DigCCurr2007.
Editing RT QC flag in delayed mode ? Virginie Thierry DMQC 4 Toulouse, 28 septembre 2009.
© Crown copyright Met Office The EN QC system for temperature and salinity profiles Simon Good.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Submission and repository management of digital libraries, using WWW Gregory Karvounarakis Sarantos Kapidakis.
Argo workshop in Ghana, December Argo data status & data access.
Instructions NSW Visual Arts Fellowship for Emerging Artists Digital Submission Template PLEASE NOTE: This template should be used for still images only.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
NOAA/NESDIS/National Oceanographic Data Center Following the Flow of Two Underway Data Streams Within the U. S. National Oceanographic Data Center Steven.
Developments at the US GDAC ADMT #10 – Toulouse, France 30 September - 2 October 2009 Mark Ignaszewski FNMOC ADMT September – 2 October 2009.
Session Session 12 EDExpress Application Processing—What’s New and Q&A.
Module 5: Implementing Merge Replication. Overview Understanding Merge Replication Architecture Implementing Conflict Resolution Planning and Deploying.
 Empowers to your customer  Product Rating and its Management in Ecommerce Framework  Product Reviews and Management: Collecting customer opinion about.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
An Introduction to the Argo Data Sytem South Pacific Workshop 11 – 14 October 2005 Mark Ignaszewski FNMOC.
The APEX Truncated Negative Pressure Drifts (TNPDs)
Global Collecting Centres ETMC-5 Activities of the GCCs Geneva 2015 Activities of the GCCs ETMC-5 22 nd – 25 th June 2015, Geneva, Switzerland.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
Summary of issues and conclusions from DMQC-4 1.Pressure Issues, especially Surface pressure offset, Druck microleak, APEXs that truncate negative pressures.
Confidencial - TRACASA Automatize test [e- Reporting]
Aggregator Stage : Definition : Aggregator classifies data rows from a single input link into groups and calculates totals or other aggregate functions.
Deutscher Wetterdienst FE VERSUS 2 Priority Project Meeting Langen Use of Feedback Files for Verification at DWD Ulrich Pflüger Deutscher.
1 Berger Jean-Baptiste
Building Preservation Environments with Data Grid Technology Reagan W. Moore Presenter: Praveen Namburi.
Submitted By: DRPU Software Team Site:
MyCLSS v.2 Critical Issues and Amend Checklist. Critical Issue After receiving final returns, SGB staff will perform a review according to a list of critical.
1 CAA 2009 Cross Cal 9, Jesus College, Cambridge, UK, March 2009 Caveats, Versions, Quality and Documentation Specification Chris Perry.
SeaDataNet Technical Task Group meeting JRA1 Standards Development Task 1.2 Common Data Management Protocol (for dissemination to all NODCs and JRA3) Data.
Module 5 Proposal Creation.
Your Name Proposal Creation Module 5 Your Name
Ingest and Dissemination with DAITSS
Argo & Google Ocean.
Data Flows in ACTRIS: Considerations for Planning the Future
Status on anomalies detected with altimetry
Enhanced File Consistency Checking
INITIAL WORLD OCEAN DATABASE COLLECTION
Global Argo Data Repository Status Report for 2009
FIZZ Database General presentation.
Exercise: understanding authenticity evidence
Cayuse 424 Proposal Creation.
MIKADO: Generation of CDI ISO19139 XML files
ERO/Transmitter Training
Prepared by: Jennifer Saleem Arrigo, Program Manager
International Argo Data Management Team
University of Kentucky E-IRB
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
14 Bin location management
Data processing German foreign trade statistics
Query-by-Example Transparencies
Presentation transcript:

10 th Argo data management 2009 Toulouse What is new at GDACs ?

10 th Argo data management 2009 Toulouse What is new at GDACs Action 1 : Argo profile detailed index Calculate time delay for getting R-files and D-Files onto the GDAC. Investigate files slowly arriving. ftp://ftp.ifremer.fr/ifremer/argo/etc/argo_profile_detailled_index.txt.gz ftp://ftp.ifremer.fr/ifremer/argo/etc/argo_profile_detailled_index.txt.gz.md5

10 th Argo data management 2009 Toulouse Argo detailed index file, date, latitude, longitude, ocean profiler_type, institution date_update: date of last update of the file profile_temp_qc, profile_psal_qc, profile_doxy_qc ad_psal_adjustment_mean : for delayed mode or adjusted mode Mean of psal_adjusted – psal on the deepest 500 meters with good psal_adjusted_qc (equal to 1) ad_psal_adjustment_deviation : for delayed mode or adjusted mode Standard deviation of psal_adjusted – psal on the deepest 500 meters with good psal_adjusted_qc (equal to 1) gdac_date_creation : creation date of the file on GDAC gdac_date_update : update date of the file on GDAC n_levels :maximum number of pressure levels contained in a profile

10 th Argo data management 2009 Toulouse File removal : under validation Action 10 : Automate file removal according to the agreed procedure A DAC submit a "removal file" to GDAC The "removal file" contains one line per file to remove. "Removal file" collection from DAC to GDAC : Query xxx_removal.txt file in each DAC submit directory; xxx must be identical to the DAC (eg : aoml, coriolis); otherwise the file is rejected. Check the format of xxx_removal.txt. The whole file is rejected is the format check fails. File name : valid Argo file name; the corresponding meta-data file must exist for this DAC Move all the named files from GDAC into a etc/removed directory The removed files are kept for 3 months in the etc/removed directory and erased after that delay.

10 th Argo data management 2009 Toulouse Action 12 : Implement an MD5 signature to secure file transfer and document it MD5 signature For each update of a GDAC file, an MD5 signature is produced. The MD5 signature file allows user to check that the file he collected through FTP is identical to the original file. The MD5 signatures are stored in etc/md5 directory Still under test, should be available in October.

10 th Argo data management 2009 Toulouse Action 16 : Document Grey list submission Each DAC maintains a greylist that is submitted to the GDAC for updates. The DACs greylist are collected by the GDAC and merged into a global Argo greylist. Greylist file collection from DAC to GDAC : Query xxx_greylist.csv file in each DAC submit directory; xxx must be identical to the DAC (eg : aoml, coriolis); otherwise the file is rejected. Check the format of xxx_greylist.csv. The whole file is rejected is the format check fails. Floatid : valid Argo float id; the corresponding meta-data file must exist Parameter : PSAL, TEMP, PRES or DOXY Start date : YYYYMMDD valid, mandatory End date : YYYYMMDD valid, fill value : ',,' Flag : valid argo flag Comment : free DAC : valid DAC, mandatory Remove all the floats of the DAC from the GDAC grey list and add the content of the submitted xxx_greylist.csv file Note : after each submission, a copy of the Argo greylist is stored in etc/greylist/ar_greylist.txt_YYYYMMDD The global Argo greylist is sorted by DAC, PLATFORM_CODE and START_DATE in alphabetical order.

10 th Argo data management 2009 Toulouse Action 19 : Coriolis to provide feedback on anomalies detected by statistical analysis in text files Every day, an objective analysis is performed on the 30 latest days of observations. The objective analysis detects anomalies that are visually quality controlled by an operator. Each flag correction performed by the operator is recorded. The flag correction is not reported to Argo NetCDF files. The list of corrections is created once a day for each DAC : ftp://ftp.ifremer.fr/ifremer/argo/etc/ObjectiveAnalysisWarning ar_scoop2_BO_ csv

10 th Argo data management 2009 Toulouse Action pending Add the parameter list to detailled index file Action 11 : Modify the “latest data” directory to handle a sliding of 3 months and separate R and D data. Synchronize metadata files