2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
1 st R2E RADIATION SCHOOL & WORKSHOP Some Organisational Issues.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Linac4 and SPL Linac4 and SPL R. Garoby for the linac team.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
1 1. Some recent views ( ) 2 Linac tunnel
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4.
Linac4 Status 1 M. Vretenar sLHC public event
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
WBS2.11 Vacuum systems G.Vandoni …brainstorming presentation… VAT Technical & Scientific7 th July 2008.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
The CERN Linac4 history, performance, perspectives
Accelerator Controls Renovation Project “ACCOR”
Results of the Risk Analysis
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
Experience with beam instrumentation at Linac4
LIU Workpackages 1 August 2014 Edms Id LIU-PM-PP-0030
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
LIU – EVM status and next steps
PS Booster Energy Upgrade
LINAC4 Vacuum Control System Review
Naming convention Rules
Planning and Installation
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
LINAC4 commissioning plans etc.
HIE-ISOLDE contribution packages
Beam Line to the HiRadMat Test Facility
Presentation transcript:

2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency Quadrupole 2.3 Chopper Line, A. Lombardi, BE/ABP 2.4 Accelerating Structures, F. Gerigk, BE/RF 2.5 Linac Beam Dynamics, A. Lombardi, BE/ABP 2.7 Beam Instrumentation, U. Raich, BE/BI 2.6 Radio Frequency Systems 2.8 Transfer Line, S. Maury BE/ABP 2.9 Magnets 2.10 Power Converters, C. De Almeida, TE/EPC 2.11 Vacuum Systems, G. Vandoni, TE/VSC 2.12 Control Systems, I. Kozsar, BE/CO 3.1 Booster Injection Mod., W. Weterings,TE/ABT 3.2 PSB Beam Dynamics, C. Carli, BE/ABP 4.1 Test Stand Operation, C. Rossi, BE/RF 5.1 Building Design, Construction, L.A. Lopez, GS/SEM 5.2 Cooling and Ventilation, Y. Body, EN/CV 5.3 Electrical Systems, J. Pierlot, EN/EL 5.4 Access Systems, D. Chapuis, GS/ASE 4.2 Transport and Installation, C. Bertone, EN/HE 4.3 Survey, M. Jones, BE/ABP 4.4 Linac Commissioning, A. Lombardi, BE/ABP 4.5 PS Booster Commissioning LINAC4LINAC High Power RF Systems, O. Brunner, BE/RF Low Level RF Systems, P. Baudrenghien, BE/RF Slow Tuning and Interlocks, L. Arnaudon, BE/RF Buncher Amplifiers, J. Broere, BE/RF Magnetic Measurements, M. Buzio, TE/MSC Magnet Design and Procurement, T. Zickler, TE/MSC RFQ Mech. design, Fabrication, S. Mathot, EN/MME RFQ Funct. design, Commissioning, C. Rossi, BE/RF PSB Commissioning to ultimate, C. Carli, BE/ABP PSB Commissioning to nominal, K. Hanke, BE/OP 1. Management, M. Vretenar + core team 2.13 Beam Intercepting devices, Y. Kadi, EN/STI CCDTL and PIMS, F. Gerigk, BE/RF Drift Tube Linac, S. Ramberger, BE/RF 2.14 Machine Interlocks, B. Puccio, TE/MPE LINAC4 WBS 2009 Technical Coordination, R. Maccaferri, TE/MSC Integration, Safety Coordination, S. Maury, BE/ABP 1.1 Orphans equipments, R. Maccaferri, TE/MSC WP PRESENTED WP to be PRESENTED New WP to be PRESENTED (still under definition)

2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency Quadrupole 2.3 Chopper Line, A. Lombardi, BE/ABP 2.4 Accelerating Structures, F. Gerigk, BE/RF 2.5 Linac Beam Dynamics, A. Lombardi, BE/ABP 2.7 Beam Instrumentation, U. Raich, BE/BI 2.6 Radio Frequency Systems 2.8 Transfer Line, S. Maury BE/ABP 2.9 Magnets 2.10 Power Converters, C. De Almeida, TE/EPC 2.11 Vacuum Systems, G. Vandoni, TE/VSC 2.12 Control Systems, I. Kozsar, BE/CO 3.1 Booster Injection Mod., W. Weterings,TE/ABT 3.2 PSB Beam Dynamics, C. Carli, BE/ABP 4.1 Test Stand Operation, C. Rossi, BE/RF 5.1 Building Design, Construction, L.A. Lopez, GS/SEM 5.2 Cooling and Ventilation, Y. Body, EN/CV 5.3 Electrical Systems, J. Pierlot, EN/EL 5.4 Access Systems, D. Chapuis, GS/ASE 4.2 Transport and Installation, C. Bertone, EN/HE 4.3 Survey, M. Jones, BE/ABP 4.4 Linac Commissioning, A. Lombardi, BE/ABP 4.5 PS Booster Commissioning LINAC4LINAC High Power RF Systems, O. Brunner, BE/RF Low Level RF Systems, P. Baudrenghien, BE/RF Slow Tuning and Interlocks, L. Arnaudon, BE/RF Buncher Amplifiers, J. Broere, BE/RF Magnetic Measurements, M. Buzio, TE/MSC Magnet Design and Procurement, T. Zickler, TE/MSC RFQ Mech. design, Fabrication, S. Mathot, EN/MME RFQ Funct. design, Commissioning, C. Rossi, BE/RF PSB Commissioning to ultimate, C. Carli, BE/ABP PSB Commissioning to nominal, K. Hanke, BE/OP 1. Management, M. Vretenar + core team 2.13 Beam Intercepting devices, Y. Kadi, EN/STI CCDTL and PIMS, F. Gerigk, BE/RF Drift Tube Linac, S. Ramberger, BE/RF 2.14 Machine Interlocks, B. Puccio, TE/MPE LINAC4 WBS 2009 Technical Coordination, R. Maccaferri, TE/MSC Integration, Safety Coordination, S. Maury, BE/ABP 1.1 Orphans equipments, R. Maccaferri, TE/MSC ONLY 11 over 26 (32 – 6) registered !!!!!

Please, make un effort to write down your WP description using the right Template ocument_id=930015&version=6

WP actual Outcomes Orphans equipments identified: Accelerating systems Interconnection including vacuum ports, beam diagnostic devices and magnetic elements. Intersystem direct cabling (i.e. Vacuum Ilks)

Need more definition Magnets interlocks: WIC or dedicated PLC (MQP & others magnets not water cooled) Beam interlocks: Recently added, to be refined, under study Intercepting devices: Need precise specs from BI and machine parameters (big impact on the cost).

Conclusions Still an effort to be done in writing WP Do not hesitate to get in touch to each others to share information's. Please, just keep me informed of important things If I can help you solving problems, I will be happy to do it. That’s my job! Good job done by everybody !