J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Project Overview Salient Features 3 parallel Michelson Stellar Interferometers 10 meter baseline Visible wavelength Launch Vehicle: Atlas V or Delta IV ELV Earth-trailing solar orbit 5 year mission life with 10 year goal SIM is a JPL, Caltech, Lockheed Martin ATC, NGST, KSC, and SIM Science Team partnership Science Perform a search for other planetary systems by surveying 2000 nearby stars for astrometric signatures of planetary companions Survey a sample of 200 nearby stars for orbiting planets down to terrestrial-type masses Improve best current catalog of star positions by >100x and extend to fainter stars to allow extension of stellar knowledge to include our entire galaxy Study dynamics and evolution of stars and star clusters in our galaxy to understand how our galaxy was formed and how it will evolve. Calibrate luminosities of important stars and cosmological distance indicators to improve our understanding of stellar processes and to measure precise distance in the distant universe
J. Marr - 2 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Synoptic Schedule Tech. Dev. FY’98FY’99FY’00FY’01FY’02FY’03FY’04FY’05FY’06 Phase A Phase B Select Ind. Partners FY’07 Design Selection 3/01 ERB IA 2/10 Launch 11/06 CDR AO Science Team Selection FY’08 Phase C/D FY’09 11/03 SRR 8/03 7/05 PDR/ NAR 8/05 CR (NASA PMC) 12/05 New Beam Launcher Demo (Complete) MAM-1 and Kite at Level 1 (Complete)Nano technologyFinished (STB-3) (Complete) Pathlength Feedfoward Verification (6/05) 4/03 PMSR ICA 6/10/03 ICRR 6/18/03 ICR FY’10 MAM-1 Wide Angle Basic Req (Complete) MAM-1 NA Goal Benchmark (Complete) MAM-1 WA Goal Benchmark (5/04) ATLO = Assy, Test & Launch Ops ERB = External Review Board PMSR = Preliminary Mission & Systems Review SRR = System Requirements Review CA = Confirmation Assessment IA = Independent Assessment NAR = Non Advocate Review ICRR = Initial Confirmation Readiness Review (JPL GPMC) CDR = Critical Design Review I&T = Integration & Test PDR = Preliminary Design Review ICR = Initial Confirmation Review (Code S EPMC) CR = Confirmation Review (NASA PMC) NASA PMC = Programmatic Management Council CA 8/05 CRR Pre-Phase B Tech Gates Pre-Phase C Tech Gates 10/08 I&T/ATLO Start 10/09 Ship to KSC 13-year Phase E Starts in 08/10 Ends in 08/23
J. Marr - 3 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Schedule
J. Marr - 4 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Phase B Key Activities
J. Marr - 5 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Project Organization ELV MIM (KSC) C. Malloy = Members of Project Integrated Management Team Outreach (NP) W.M. Green SIM Program Executive (HQ) L. LaPiana Navigator Program (NP) M. Devirian - Manager C. Beichman - Scientist Project Manager J. Marr Deputy Project Manager B. Watterson Project Scientist M. Shao Project Business Manager Vacant Project System Engineering C. Guiar - System Engr) Mission System D. Bindschadler - Mgr K. Simpson - DMgr (Act) Mission Assurance A. Doran - Mgr APD (JPL) L. Simmons - Mgr J. Van Zyl - Dep Mgr SIM Program Scientist (HQ) P. Crane Launch Support Office A. Chatterjee Programmatic Line Support Project Technical Staff Instrument Partner Manager H. Drosdat S/C-ATLO Partner Manager M. Herriage Project Engineer/Architect J. Yu Project Technologist R. Laskin Project Business Office Acquisition Manager/CTM John Davidson Administrator/Librarian Joy Hodges Project Resource Administrator Martha Criss Scheduler John Mann Flight Segment R. Laskin - Manager C. Bell - Dep Mgr Instrument Spacecraft Science Office S. Unwin- Mgr & DPS SIM Science Team Science Planning Team A. Wehrle - Lead SIM Science Ops System D. Perz -Mgr MSC Ground Segment D. Biondschadler (Actg)