FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Computer Parts There are many parts that work together to make a computer work.
Online Monitoring and plane checkout Online monitoring is used at the mine for: –sanity checks - “is everything working” –diagnostics - rates, hot/dead.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Rapid Pneumatic Transportation of Radioactive Samples System Steve Padalino & Ed Pogozelski SUNY Geneseo.
Climate Monitoring WEB Interface Using 1_Wire™ Sensors Imad Hoteit Hassan Wehbe.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Using TRF7970A USB EVM with GUI for NFC Demonstration Operations
How To Activate Your New iPod Mini Print Ready Documentation.
HBD Transmission Monitor: Update on Assembly & Testing HBD Working Group Meeting 8/29/06 B. Azmoun Brookhaven National Lab.
Ch 26 & 27 User Interfaces.
Power Point EDU 271 Microsoft PowerPoint is a powerful tool to create professional looking presentations and slide shows. PowerPoint allows you to construct.
Data Acquisition Software Integration and ADC Characterisation Jack Hobbs 4 th August
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
L.E.A. Data Technologies L.E.A. Data Technologies Introduction.
11.10 Human Computer Interface www. ICT-Teacher.com.
Ethernet and Wifi Chapter 7 & 8. Send and Receive Data network adapter or network interface NIC card the most common wired Ethernet network interfaces.
A mother board is the main circuit board for the computer system (hence the name mother board ) The mother board holds all of the other components of a.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Computer Hardware – Output Devices.  Output is data that has been processed into a useful form, called information 2.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
E-165 (FLASH) Experiment Status Report Johnny S.T. Ng SLAC EPAC Meeting, Nov. 15, 2003.
The Experimental Program of the “FLASH” Experiment.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
Interactive CARA Simulation Prof. Insup Lee. Hierarchical EFSM Specification for CARA.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
There are many parts that work together to make a computer work. System Unit Computer Parts.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Back End FPGA Front End FPGA HV control & monitoring DACs and ADCs DCS server 6 * (pmt, 3in1, ADC) Trigger, DAQ Arrow thickness indicates bandwidth HV.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
62cm 64cm. DAQ status and Plans DAQ –Timing tuning –Which tools to learn (SC, Event monitor, GPIO, MIDAS, DIP, laser, storage, analysis) Plan with beam.
35t Readout Software John Freeman Dune Collaboration Meeting September 3, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Preparation for Station Acceptance Test
USB Project (15th July) Ian Coulter.
USB Project (22nd July) Ian Coulter.
XFEL bunch compressors
Presentation transcript:

FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.

FLASH Collaboration Meeting: July 2003 Why the Spectrograph? Our main chamber is designed to measure absolute total and line fluorescence intensities. The spectrograph will support this measurement by further resolving line shapes and relative intensities. Recall that Nagano used narrow bands only and therefore could not resolve spectral features. Repeat of Clive’s decay time for individual lines as was done for T-461.

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ Beam Window Light Pipe 45 o mirror Light Pipe Fused Silica Window  End of Pressure System  All parts in shops.

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ Flat Mirror Spherical Mirror Actuator Enclosure Mounts

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ Spectrograph Gratings Slit  0.3 mm  0.4 mm  0.5 mm

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ PMT PMT Base DAQ cables connection Mount to spectrograph  Due Mid August

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ 32 channels plus HV  Purchased  Pulled  Connectors

FLASH Collaboration Meeting: July 2003 System Layout Gas Chamber Optics Spectrograph PMT Cables DAQ (2) Computer ISA CAMAC card CAMAC crate with adc cards DOS based pascal or c daq program. Clive has built similar systems. Put it all together

FLASH Collaboration Meeting: July 2003 Spectrograph Summary Reminder: This is a secondary measurement and was an after thought to our experiment. If delivery schedules hold up we should be able to get system ready.

FLASH Collaboration Meeting: July 2003

DAQ 1 The main DAQ computer remains a LabView based system that will look quite similar to the system used in T-461. In addition, the system will crunch the numbers after each run is complete and display the results.

FLASH Collaboration Meeting: July 2003 Online Processing: DAQ 1 Ascii text files are generated during a given data part. When the run is stopped a “flag” will be set saying it’s okay to process the data. Ascii files are then converted to ROOT ntuples. Different files (.dat and.sam) are merged.

FLASH Collaboration Meeting: July 2003 Online Processing: DAQ 1 There will be a simple GUI that allows you to look at recent runs. Would like to interface to Matt Dalton (et al.) GUI. He displays what we expect to see and then I tell him what we actually saw. If new data starts coming in, processing will stop (asap). (A green light will appear when processing done. Perhaps even a % done indicator.) May cause slight slow down (IE wait until processing done before starting new part < 3 minutes total). Worth it???

FLASH Collaboration Meeting: July 2003

Gas System T-461 setup is essentially the current setup. Ability to use “SLAC” air is expected. This will allow “humid” air tests. Clive has suggested a humidity monitor be added to chamber… July 5 write-up copies available.