PRESENTED BY DATE CATEGORY C COVER TRIAL EMP and Monitoring Procedures Stephanie Salinas19 March, 2014 1.

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
A Joint Code of Practice Objectives and Summary Presentation
ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
Welcome to Online OHS All your OH&S needs in one easy to follow database system.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Kenya AIDS Vaccine Initiative
Presentation Subject Header Connected for Success Appendix C- Audit Requirements Economic Benchmarking Backcast Data Template.
DO NOT PLACE ANY TEXT OR GRAPHICS ABOVE THE GUIDELINE SHOWN DO NOT PLACE ANY TEXT OR GRAPHICS BELOW THE GUIDELINE SHOWN TO EDIT GRAPHICS IN THE MASTER.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
NAIC Review of ERM & Internal Controls David Altmaier Florida Office of Insurance Regulation.
Transmille Training Quality System.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Quality control of raw materials In-process control
Purpose of the Standards
Part II Project Planning © 2012 John Wiley & Sons Inc.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
 SOPs are often called the ‘bible’ for your daily operation and as such should bring consistency to the actions of your team.  SOPs tend to fall into.
Conducting the IT Audit
W504 - Management of asbestos containing materials.
Fundamentals of ISO.
REVISED WASTE CLASSIFICATION AND MANAGEMENT SYSTEM FOR SOUTH AFRICA National Waste Classification and Management Regulations & Standards Stakeholder Workshop.
ASARCO Tailings Violations Pima County Department of Environmental Quality.
Participate in Environmentally Sustainable Work Practices
Four Wheel Drive Australia Risk Management Presentation.
Overview of existing assessment schemes Rolf Bienert, John Lin.
Support Programs version 2 March 2010 Cleaning and Sanitation
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Disaster Recover Planning & Federal Information Systems Management Act Requirements December 2007 Central Maryland ISACA Chapter.
Audit Planning Process
1 Chapter Nine Conducting the IT Audit Lecture Outline Audit Standards IT Audit Life Cycle Four Main Types of IT Audits Using COBIT to Perform an Audit.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
ISO Registration Common Areas of Nonconformances.
University of Sunderland CIFM02 Unit 5 COMM02 Project Hazard Management and Contingency Planning Unit 5.
Jericho Project Air Quality Assessment. TOPICS METHODOLOGY EMISSION SOURCES RESULTS AND ASSESSMENT MITIGATION AND MONITORING CONCLUSION.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
MODULE 7: CONDUCT OF GOVERNANCE AUDIT GOVERNANCE AUDITOR ACCREDITATION COURSE.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
F8: Audit and Assurance. 2 Designed to give you knowledge and application of: Section A: Audit Framework and Regulation Section B: Internal audit Section.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.

Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
World Health Organization
PLANNING, MATERIALITY AND ASSESSING THE RISK OF MISSTATEMENT
WESTAR Recommendations Exceptional Events EPA response
Competence Pack Guide to Assessment.
Fieldwork Investigation
CDRL E003 CFAT REPORT TEMPLATE
IS&T Project Reviews September 9, 2004.
West Gate Tunnel – Air quality expert evidence
Research and Test Reactor Decommissioning Inspections
Competence Pack Guide to Assessment.
Agenda Why this group exists Who is behind it
Relationship between World Bank and Romanian EA requirements
How to conduct Effective Stage-1 Audit
TNI 2016 – Internal Audits BACWA Lab Committee ~ August 8, 2018.
Feasibility Report.
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

PRESENTED BY DATE CATEGORY C COVER TRIAL EMP and Monitoring Procedures Stephanie Salinas19 March,

1. ENVIRONMENTAL MANAGEMENT PLAN A plan which details the following information regarding the use of restricted Category C cover material at Taylors Road Landfill; A risk assesment Operational procedures Monitoring Program 2 What is it?

RISK ASSESSMENT The risk assessment was conducted as per the relevant sections of EPA publication (2011) – Licence Assessment Guidelines The methodology used required identification of the following; – Receptors – Pathways – Emissions Once these are identified, each item is looked at individually and assigned a level of risk based on no controls. An review into existing controls and other data (historical monitoring, precedent, likelihood etc) is conducted and a reviewed risk rating is applied. 3 What is this and how was it done?

RISK ASSESSMENT The table in Appendix 5 summarises the Risk Assessment process. 4 Aspects and Impacts Table

OPERATIONAL PROCEDURES This section of the EMP details the operational methods and controls regarding the use of Category C soil as cover material; –Restricted contaminants –No double handling –Dust mitigation as required These controls & procedures are derived from the risk assessment and address the identified risks. These operational procedures are what control the level of risk associated with the activity. 5 What is this and how was it done?

MONITORING PROGRAM Monitoring data will is used to measure whether the operational procedures are being effective in controlling the identified risks. As the predominant risk identified with the Category C cover trial is in relation to airborne dust and contaminants, the monitoring program in this management plan focuses on assessing these risks. 6 Why is this important?

MONITORING PROGRAM Daily visual post placement inspections of restricted Cat C cover by SITA staff, prior to close of business. VOC monitoring within the PIW cell to be conducted by SITA staff with the use of appropriate equipment. Ammonia monitoring within the PIW cell to be conducted by SITA staff with the use of appropriate equipment Directional dust monitoring gauges assessed by a third party NATA- accredited laboratory. Weather conditions (specifically wind) 7 What will it consist of? What is being monitored?

MONITORING PROGRAM 24 hour dust and contaminant monitoring events (including monitoring during non-operational periods) Conducted by a third party NATA-accredited consultant and laboratory with use of specialised equipment Assesses levels of dust being emitted from the PIW cell over 24 hours (operational & non-operational) Considers the impact of the weather conditions (wind, temperature, rain, etc) Assesses for contaminants within the restricted Cat C cover range such as metals, as well as for asbestos. 8 What will it consist of? What is being monitored?

AUDITOR REVIEW All monitoring results will be provided to the auditor as they are received by SITA during the trail period This does not mean any required action will not be taken until auditor review. At the conclusion of the trial period, the auditor will provide a report with an assessment on the use of Cat C cover and the results of the trial period. 9 How is the auditor involved in the process?

an EMP has been developed Risk assessments have been conducted to BPEM standards Operational procedures have been developed Monitoring processes have been defined an independent Auditor will review 10 IN SUMMARY