1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct 2007 2 Who We Are Collaboration loosely formed at Snowmass which included SLAC,

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Lecture # 2 : Process Models
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
CS 325: Software Engineering January 13, 2015 Introduction Defining Software Engineering SWE vs. CS Software Life-Cycle Software Processes Waterfall Process.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
8.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Software Engineering For Beginners. General Information Lecturer, Patricia O’Byrne, office K115A. –
Chapter 2- Software Process Lecture 4. Software Engineering We have specified the problem domain – industrial strength software – Besides delivering the.
Design, Implementation and Maintenance
Chapter : Software Process
A Methodology that is PROVEN PRACTICAL EFFECTIVELY INTEGRATED SCALABLE CUSTOMIZABLE.
SEC835 Database and Web application security Information Security Architecture.
S/W Project Management
Chapter 2 The process Process, Methods, and Tools
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Information ITIL Technology Infrastructure Library ITIL.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
ILC Control and IHEP Activity Jijiu. Zhao, Gang. Li IHEP, Nov.5~7,2007 CCAST ILC Accelerator Workshop and 1st Asia ILC R&D Seminar under JSPS Core-University.
Chapter 2 Process: A Generic View
Software Requirements Engineering: What, Why, Who, When, and How
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Systems Life Cycle A2 Module Heathcote Ch.38.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
WP18: High-Speed Data Recording Krzysztof Wrona, European XFEL 07 October 2011 CRISP.
ANKITHA CHOWDARY GARAPATI
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Architecture View Models A model is a complete, simplified description of a system from a particular perspective or viewpoint. There is no single view.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
Software Engineering Introduction.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Software Engineering (CSI 321) Software Process: A Generic View 1.
CI R1 LCO Review Panel Preliminary Report. General Comments –Provide clear definition of the goals of the phase (e.g. inception), the scope, etc. in order.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
1 Global Control System J. Carwardine (ANL) 6 November, 2007.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Advanced Software Engineering Dr. Cheng
Methodologies and Algorithms
Chapter 10 Software Quality Assurance& Test Plan Software Testing
The ILC Control Work Packages
Software Engineering (CSI 321)
Application of SysML to LLRF system design M.Grecki
Project Management Process Groups
Software Engineering I
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

1 The ILC Control Work Packages

ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC, ANL, FNAL, and DESY. And then KEK. Continuation of work that has been ongoing since Snowmass, but with few FTEs worldwide. On the order of a handful. Need to capitalize on the controls work being done at the test areas – STF, XFEL, and NML. –These areas are not controls R&D projects. –These efforts may not be specifically part of an ILC program

ILC Control System Work Packages GDE Oct Where We are in the Process All of the workpackage descriptions can be found on the controls wiki at – list_of_work_packages_for_the_edr –Will move into EDMS shortly (end of today?) Call for EoIs has not yet been made – early next week We have more work than bodies identified –EDR will lack some details in certain areas –Not all workpackage leaders identified Workpackages divided into roughly 10 major areas. –EOIs can commit to just a portion –Especially if it’s not deemed part of an ILC program per se (eg, XFEL).

ILC Control System Work Packages GDE Oct The Work Packages – page 1 Electronics Platform This work package is to investigate the suitability of the ATCA (“Advanced Telecom Computing Architecture”) electronics platform as a High Availability compliant standardized electronics platform for the ILC accelerator control system. High availability High availability is achieved through the application of a variety of well- known techniques. Within this work package we research the application of these techniques in the context of accelerator control systems. We examine those techniques where the application to controls is not well understood. Among the techniques to apply are software and hardware redundancy and failover, resource monitoring, fault detection algorithms, automated diagnosis, and adaptive control. Timing and Synchronization The ILC controls system needs R&D on distribution techniques for the 1300 MHz timing distribution system. The specified phase stability requirement for timing across the 15 km accelerator complex pushes the state-of-the-art in stable RF signal distribution. The intent is to build on recent systems at SNS, DESY/TESLA and KEK and ongoing work at SLAC and ANL.

ILC Control System Work Packages GDE Oct The Work Packages – page 2 Controls system architecture This track involves researching and documenting the overall control system architecture. Included here are the site-wide controls network infrastructure, client applications tier, services tier, technical equipment tier, and protocols. In addition, the set of standards, interfaces, and methodology are to be documented. Unique research is required to assure that the requirements for high availability, scalability, automation, feedback, synchronous operation, and remote operation are met with an optimized design. In particular, the network architecture requires analysis (simulation) to verify that requirements for throughput and latency are met. Prototyping of selected aspects of the architecture will also be necessary to evaluate alternatives. Engineering Engineering analysis needed for design including the risk analysis, value engineering analysis and cost optimization. This will need to include the impact of baseline configuration changes such as the 1 tunnel solution.

ILC Control System Work Packages GDE Oct The Work Packages page 3 Software Development for International Collaboration Software development in an international environment is a difficult problem. Each institution has its own methodology including build, distribution, and deployment practices. Software will need to be tested/verified in an integrated offline environment. Configuration Configuration management is the act of maintaining the state of a system over time. For a control system this means software, hardware, firmware (FPGA code in particular), and documentation as it relates to operations. The techniques are often applied to control systems and networks, but typically in an incomplete and ad-hoc manner. This work package involves research into tools, data modeling, workflow, and standards for the comprehensive management of the control system configuration. The goal is not to engineer a comprehensive solution, but rather explore the problem domain, potential solutions, and applicable standards and use generated documentation as input for authoring the EDR.

ILC Control System Work Packages GDE Oct The Work Packages page 4 Integration Technical equipment in each area system comprises field hardware such as power supply controllers, vacuum equipment, beam instrumentation, and motion control devices. These systems are the responsibility of the area system groups. However, they must interface to the control system in a coherent way to allow equipment to be accessed via a common interface for application programming, data archiving, alarms, configuration, and remote diagnosis. In order to meet the very stringent requirements for overall system reliability, as well as provide for more efficient R&D and long-term maintenance, standards must be applied to the technical equipment for packaging, field bus, communication protocol, cabling, configuration, and remote diagnosis. Safety Systems –Machine protection –Personnel Safety Systems conceptual design, including tunnel zones and locations of movable beam-stops to support phased machine commissioning).

ILC Control System Work Packages GDE Oct The Work Packages page 5 Project Management Coordinate with work package leaders to deliver individual work package deliverables tracking progress on a monthly basis. Provide a conduit of information between GDE and people actually doing the controls work and to ensure that the controls group is adequately communicating among all three regions.

ILC Control System Work Packages GDE Oct EoIs Coming into controls –We know we have interest from DESY and KEK especially in ATCA. –ANL and FNAL interested in most areas. –Still big gaps especially in engineering, integration, and safety systems. Coming out of controls –Very few work packages have anything to do with controls –What are your thoughts in terms of diagnostics and instrumentation? Feedback requirements?