Division 1 – General Requirements ACT 380 1. Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 CDBG Procurement Requirements For Local Officials.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Enterprise Architecture
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
The BIM Project Execution Planning Procedure
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 11 Procurement Management Embedding value into the.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Construction Specifications
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Contract Clauses Jim Duffy (BBCNL).
1 Cooperative ___Agreements___ __or__ Leveraged Purchasing Agreements (LPA)
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Project Management Models
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Agency Construction Management :CM NOT AT-RISK
Construction of a Transfer Station
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
Legal Obligations of Charter School Trustees May 2004.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
1 Priority objectives for development of “Public Administration Reform, Local Government Decentralisation” sector UPGRADING THE LEGAL FRAMEWORK FOR CIVIL.
Winter 2007SEG2101 Chapter 31 Chapter 3 Requirements Specifications.
Allowances, Unit Prices, and Alternates ACT
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
OSHA Safety and Health Program Management Guidelines
IAEA International Atomic Energy Agency. IAEA Outline Responsibilities and functions of the regulatory body Objectives of regulatory functions Organizational.
 Principles;  Moral;  Beliefs;  Moral values; and  “A set of principles of right conduct”
Division 1 – General Requirements Review Questions.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Top 10 Ways to Expedite Design Reviews & Inspections.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Legal requirements and contractual duties
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
Caltrans 2010 standard specifications
Directed Change Constructive Change
Construction Management Services April 16, 2018
FAR part 1.
Presentation transcript:

Division 1 – General Requirements ACT 380 1

Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of other sections O Learn to recognize the kinds of information that should be specified in Division 1, and to coordinate it’s use throughout the Project Manual without duplication or conflict 2

“General” Defined O The word “general” means “involving, applicable to, or affecting the whole” O Including “general” information in this division avoids having to repeat throughout the specifications 3

General Requirements Specify: O Administrative and Procedural – relating to the process of contract administration, assigning contract responsibilities, and the methods of communicating, verifying, and coordinating requirements for quality assurance O Temporary Facilities and Controls – put into place for use only during the period of construction (will be removed when no longer needed for construction operations) O See page 7.33; fig 7.3-C for Sections 4

Hierarchy General Conditions (very broad) Division 1 General Requirements (expand GC- but are broad enough to apply to all specifications) Part 1 General 5 See page 5.44 – Fig 5.6-C

Hierarchy Application Example O General Conditions – establish that testing may be required O Division 1 – specifies broad administrative and procedural requirements for testing laboratory requirements (who selects lab, who pays for what services, qualifications of testing lab, submittals of reports, and contractor’s responsibilities for cooperation O Part 1- General of each Specification – expand on the tests to be performed, number of tests to be done, and other details related to the work or products in that section 6

Division 1 Relationship O For overview see page 5.40; fig 5.6-A O The slides to follow will look at individual relationships with: O Bidding Requirements O Conditions of the Contract O Divisions O Drawings 7

Div1 & Conditions of the Contract (CoC) –see page 5.46 O CoC – are an inherent part of the Agreement, govern the content of the entire contract, contain contractual principles applicable to most projects O Div 1 – is an inherent part of the specifications, administratively governs the specification sections, contain specifics directly applicable to a particular project 8

Div 1 & Divisions 2-16 O The CoC are legal provisions which relate to the entire project (e.g., Contractor shall pay for testing) O Div 1 – general work which relates to entire project (e.g., Use independent testing agency) O Divs 2-49 – specific requirements relating to a specific product or system (e.g., Test for water and air infiltrations) 9

Div 1 & Drawings O Drawings graphically define certain Division 1 subjects, including scope of work and related work which may or may not be part of the contract O Other parts of the work requiring close coordination between the drawings and Div 1 include: O Use of the site O Owner occupancy of the building during construction O Phased construction O Multiple prime contract construction 10