Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in 2005-2006 Resources  Outlook The new.

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
New HV test specification for the LHC N. Catalan for the EI section.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
CRYOGENICS AND POWERING
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
HC review - 12 May 2005Luigi SERIO - AT/ACR/OP1 SECTOR COOL DOWN AND CRYOGENIC COMMISSIONING L. Serio.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Review of Hardware Commissioning May 11-13, 2005 Hardware Commissioning Co-ordination Organisation Roberto Saban the logic day to day organization safety.
1 1. Some recent views ( ) 2 Linac tunnel
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
HC Review Follow-up – June 22 nd – 23 rd 2006 What has been going on in the field: a status report F. Rodriguez-Mateos, TS-HDO on behalf of the HCC Team.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
ELENA installation progress F. Butin / ELENA collaboration.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Powering LHC magnets version 30/3/2007.
Equipment simplified model SMR UR safety
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
The LHC - Status Is COLD Is almost fully commissioned
Powering the LHC Magnets
MPE main activities planned for LS2
XFEL Vacuum System Commissioning
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Cryogenic Risk Assessment in LHC
Powering from short circuit tests up to nominal
EP Experiments safety validation process Safety Permits
Machine Protection System Commissioning plans
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
ThomX – Commissioning Meeting – 25/01/2018
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new schedule Roberto Saban on behalf of the Hardware Commissioning Team MAC

Roberto Saban TS MAC The method individual system tests hardware commissioning  qualification for operation of the individual systems After the qualification for operation of the individual systems of a sector (vacuum, cryogenics, quench protection, interlocks, powering, etc.),  each sector will be commissioned as a whole each sector will be commissioned as a whole up to the powering to nominal current of all the circuits. Validation and specific studies Validation and specific studies will be carried-out on the first commissioned sector. What tests the procedures and the sequencethe procedures and the sequenceHow what conditions are required to startwhat conditions are required to start what conditions determine it is finishedwhat conditions determine it is finished what conditions are required during the testswhat conditions are required during the tests Sytem owners define and carry-out Hardware Commissioning Coordination ensures that the conditions required exist What tests the procedures and the sequencethe procedures and the sequenceHow what conditions are required to startwhat conditions are required to start what conditions determine it is finishedwhat conditions determine it is finished what conditions are required during the testswhat conditions are required during the tests Hardware Commissioning Coordination with System Owners define and carry-out and ensures that the conditions required exist Preparation

Roberto Saban TS MAC The logic Preparation subsystems ready all systems ready for machine check out individual system tests hardware commissioning two types of documents : as designed as tested  impact on equipment safety  impact on equipment/system performance  impact on machine performance

Roberto Saban TS MAC Commissioning Procedures & Failure Scenarios  Progress has been made in convincing our colleagues from the equipment groups of the usefulness of the documentation  Documentation describing the Individual System Test and Hardware Commissioning Procedures now exist for most of the systems  Only a few documents describing Failure Scenarios have been prepared  A standard chapter on Safety was introduced in all of them following the guidelines of the Safety Coordinators  These documents are used as a hard reference by those who carry out the tests in the field; these documents are alive : in fact, the have undergone updates following experience when carrying them out Preparation

Roberto Saban TS MAC SECTOR 7-8  Sector  RegionComponentsEquipment group  Superconducting Circuits RQS.A78B2.RR77 Equipment  Arc 78 Power Converter IST The Manufacturing & Test Folder Preparation

Roberto Saban TS MAC The Manufacturing & Test Folder Preparation EDMS – MTF for Circuit Related Components: AC Distribution Powering Interlock for warm and cold circuits Quench Protection System Energy Extraction Control Cooling & Ventilation Cooling Power Cables Electrical Quality Assurance Power Converter Short Circuit Tests DFBs Cryogenics Vacuum Access & Safety EDMS – MTF for Beam Related Components: Beam Instrumentation Controls + Beam Energy Meter Collimators Kicker System Diluters Beam Interlock System Beam Dumping System Beam Injection System RF

Roberto Saban TS MAC The Manufacturing & Test Folder Preparation Data already uploaded for Sectors 78, 45 and 81 ! (~1000 slots filled in)

Roberto Saban TS MAC The commissioning programme Preparation Front 1Front 2Front 1Front 2 LeftRight 6.6 km Front 1 arc and the matching section on the even side Front 2 arc, the matching section on the odd side and the inner triplets on both sides two shifts = 15 hour days

Roberto Saban TS MAC The day to day coordination : the human resources Preparation operation support to operation data recording reporting Field Control Room or CCC Sector A 1 Engineer 1 Technician 1 AB Operator Sector B 1 Engineer 1 Technician Progress Tracking Planning Re-scheduling Meetings Crisis Management MTF Database Analysis Information processing Publications Project Management 1 Project Leader 1 Mr.Circuit & DPL 1 Database/Web Expert 1 Administrative Assistant hardware oriented small repair missing details access/balisage Field Preparation LHC Safety Coordination advise on safety matters enforce safety in the field

Roberto Saban TS MAC The review & its recommendations Status  Some organisational matters were judged worth further attention.  It was noted that Hardware Commissioning will be the first occasion where the safety measures (responsibility, training, access conditions, signalling, etc.) put in place for LHC will be evaluated for the first time. Furthermore, Hardware Commissioning will be a test of the new organisation of Safety at CERN; its impact must be monitored.  A number of issues related to controls & informatics were noted.  Important technical issues related to either the conditions under which the tests are carried-out (e.g. the ventilation of the tunnel during the tests) or the tests themselves were considered; some of them must be reconsidered in the light of the present installation and commissioning scenario.

Roberto Saban TS MAC The commissioning activity in Three underground powering areas around even points were tested with the power converters connected to the cables (water and air cooled) Status DFBs field control room Power Converters Energy Extraction Systems One smaller underground powering area close to Point 7 is being tested now.

Roberto Saban TS MAC The commissioning activity in Status

Roberto Saban TS MAC The supply air temperature of the HVAC units is regulated at 17.5 ± 1.5 ˚C except ESCL 7,9,10,11 and 12. ESCL1 PID is optimized for hi-speed fan. ESCL7 showed a regulation problem since a manual valve had remained closed. ESCL9 to 12 inefficiency problem. Data provided by ST-CV The commissioning activity in Status

Roberto Saban TS MAC The temperature at the ducts showed maximum values of 74 ˚C 10h after start up PC. At 03:15 cables showed 154 ˚C at their end. Tightening problem solved at 04:30. The commissioning activity in Status

Roberto Saban TS MAC Resources Status

Roberto Saban TS MAC The new schedule Outlook A piece of cake The nightmare

Roberto Saban TS MAC The new schedule  It looks it can be done with a few reserves like the activation of the tunnel during this first run, the commissioning of the access safety and access control system, the approval of the as-built access safety and access control system by the INB authorities, the fact that we would start with a machine which is not so well aligned ( no smoothing )  Careful tuning of co-activities is needed  Some additional resources will be needed in 2007 (man power and hardware)  Resources not originally planned for will be needed in 2008  The program for 2008 must be closely watched to ensure that the remaining commissioning can really be done in the three months allocated Outlook

Roberto Saban TS MAC Conclusions  Preparation “finished”  Awareness of safety and equipment integrity must be continuously stimulated  First experience in the field positive but the real heat is not yet on  The resources were found but must be monitored in the light of the changing scenario  Delicate scheduling of the activities to match the available resources and the requirements of the schedule Hardware Commissioning