1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.

Slides:



Advertisements
Similar presentations
Introducing Geoliner 660 an Imaging Evolution  New Multiprocessor Camera for increased Speed  Enhanced Cameras are VODI TM equipped for increased operator.
Advertisements

Hoist Lifting it Right.
Team Churro: Sharon Grimshaw, Maggie Su, Louis Yi, and Morgan Zheng.
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Course Name : DESIGN OF MACHINE ELEMENTS
New Human Computer Interfaces Amnon Dekel HUJI – CSE, Spring 2006 Class 5 May
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Sherline Model 5400 Milling Machine. 5400A Mill with Accessory Package.
3D Room Surface Mapping Neil Brazeau, Franck Dzefi, Jackline Koech, Nicholas Mosher Faculty Advisor: Prof. Mario Parente Department of Electrical and Computer.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
Installation. Indoor Unit Installation Typical Installation.
Confidential / Property of Danfoss Drives A/S DKDD-SMC 1 Drives Division Danfoss presents - VLT ® 2800 Series.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Power Window. what kind of mechanism makes your car windows go up and down? How about the power windows with the automatic-up feature that raises the.
MKT May 2012 C850: Fast sliding gate operator. MKT May 2012 Summary  Why a fast slider operator?  USPs  Applications  Details  Technical specifications.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
More LEGO Mark Green School of Creative Media. Introduction  Now that we know the basics its time to look at putting some robots (or toys) together 
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
The MesoMill™ An Off-The-Shelf Small Milling Machine By Roger Cortesi MIT Precision Engineering Research Group.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
BATCH MEMBERS R.ABHISHEK-08N41A0401 K.DHEERAJ REDDY-08N41A0412 S.RAJENDRA REDDY-08N41A0458 JYOTHISHMATHI COLLEGE OF ENGINEERING AND TECHNOLOGY,TURKAPALLY.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
SNS COLLEGE OF ENGINEERING
VEX Lifts (Devices that extend upwards)
Crab Cavity Technical Coordination meeting:
Planning for Proto-DUNE PD Installation and Cabling at CERN
Status of NA62 straw readout
Automated slicing machine
VEX Lifts (Devices that extend upwards)
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
ERMC/RMM activities May 2017
EILERSEN The Weighing experts.
NC,CNC machines and Control Programming.
NC and CNC machines and Control Programming
Sherline Model 5400 Milling Machine
Senad Kudumovic Design engineer
Command and Data Handling
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
custom-engineered solution
Presentation transcript:

1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table

2 03/21/2006 Specifications Rotary plate Rotation 360° Speed 1 rpm Precision < 0.5° (TBC) Instrument Weight: 750 Kg Carriage Stroke 1500 mm Speed 25 mm/s Precision +/- 0.5 mm Lifting plate Stroke 400 mm Speed 5 mm/s Precision +/- 1mm Lower position Height 850 mm Top position Height 1250 mm Displacements allow full scanning of the CU Slow speeds to minimize dynamic loading Speeds allow full stroke in 1 or 2 min

3 03/21/2006 Table control All 3 axis motorized with stepper motors –Open loop control: no feedback on true position 1 electronic board controlling 1 power module per axis –Modules mounted inside a control box attached to the carriage PC connected to the control board to send move orders to the table –Local connection or cable from the control room –Serial link, optionally internet protocol (requires add-on bard) Basic program language to communicate with the control board –“move to xx position” type of commands –Routines available to specific tasks: reference position Development of simple GUI is planed for a more user-friendly control of the table Reference position of the table defined by precision limit switches –Sensitivity +/- 1 motor step: negligible

4 03/21/2006 Test Area Requirements Space for to operate the table with CU mounted –3x3 m² if 360° rotation of CU Distance between ground and beam ~1300 mm –Ok for PS beam –Something needed at SPS to raise the table Cement blocks? Additional removable structure? Services –Power supply for the table control box Standard 220AC, around 1 KW needed Handling of table –Plan is to have removable wheels to bring to table close to the test areas –Lifting equipment probably needed to position it in the beam (weight around 300 Kg)

5 03/21/2006 Interfaces Electrical: NA Mechanical –Very simple due to CU mounted on large, stiff plate Threaded holes for fasteners: already in the design based on current CAD model of the interface plate Eventually additional holes for alignment pins Cables –Only a few cables coming in and out of the CU but still a concern due to large strokes of the tables Specific features need to be designed to deal with them

6 03/21/2006 Security Security features on table –Limit switches on 3 axis cabled on control board –Mechanical stops –Brake on motor lifting the table: won’t fall in case of power shutdown –General electrical shutdown CERN Approval –Concern maybe not a problem: everything needs to be arranged before the table is sent to CERN –First contact with CERN security personnel but no feedback yet –Table should not fit in lifting equipment category but in machinery: needs to comply with European directive 98/37/CE Certificate of Compliance required? => additional work, delay…

7 03/21/2006 Resources - Planning Budget: ok for 25 k€ –Money should be available by now at LLR: on time –Table more expensive than expected but most of the mechanical fabrication and assembly is done internally: compensates Manpower: ok –Personnel from LLR available to deal with mechanical, electrical and software aspects Planning: still on time –Mechanical design almost done: features to rotate the CU need to be reworked –First release of engineering drawings: allow fabrication work to start –Mechanical and electrical components chosen Purchase order in early April, components available mid-May –1 month for assembly and 2 weeks to test Table ready in early July: safety margin is 2 weeks before shipping to CERN

8 03/21/2006 Height of the table Design of the table doesn’t meet the requirements: 850 mm instead of 800 in lower position –Distance between center of top CsI log and edge (400mm) is more than 50 mm –Easy solution is to change/remove the anti-vibration feet Ok: grid reduced by an additional 42 mm