GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
Advertisements

GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 1 LAT Calorimeter Subsystem W. Neil Johnson Calorimeter.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Status Review, March 31 & April 1, Calorimeter Subsystem 1 GLAST Large Area Telescope: Calorimeter (CAL) Subsystem.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
From Research Prototype to Production
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 W Neil Johnson 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
Process Control during Wafer Design and Production.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Bill Raynor Naval Research Lab
SPF MAG Quarterly Report – Feb 2015
WBS 1.03 Readout Systems Scope, Cost and Schedule
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
GLAST Large Area Telescope:
GLAST Large Area Telescope
Lockheed Martin Canada’s SMB Mentoring Program
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
Elettra – Sincrotrone Trieste S.C.p.A.
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray Large Area Space Telescope 13.0 Summary W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager (202)–767–6817

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC Outline  Risk Assessment  Summary

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC CAL Risk Summary ID #Risk RankRisk DescriptionRisk Mitigation CAL-001Moderate  CAL ASIC performance problem. All design and manufacturing issues are not resolved. Testing with GCFE8 and GCRC4 indicate 1) continued communications problems which prevent 200 MHz communication speed at environmental margins (high temp) 2) noise performance variability as a function of pulse amplitude in some FE chips which appears related to individual FE parts but could also be PCB problem  New ASICs have been submitted that should correct the communications problem. Available for test by end of April  Noise problem has been identified and corrected in GCFE9 wafer submission. Sample testing possible by end of April. Alternative fix requires resistor addition to AFEE board for each GCFE8 Versiom CAL-002Low  Failure in qualification of COTS ADC/DAC. CAL requires ~ 3500 plastic encapsulated ADCs and 300 DACs  There are no options to the COTS ADC/DAC which meet LAT power and deadtime requirements  Potential ADCs & DACs were radiation tested prior to final part identification  Flight parts are expected in four weeks and we will perform initial quick qual  Selected Maxim ADC and DAC were tested for radiation susceptibility over a year ago. Qualification testing is a repeat  A qualification program has been developed and approved by GSFC

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC CAL Risk Summary (1) ID #Risk RankRisk DescriptionRisk Mitigation CAL-003Low  Failure in qualification of plastic encapsulation of flight ASICs. Asics designs have not been tested to qual level so far  Using earlier version of ASICs packaged by proposed flight vendor we have initiated plastic encapsulated module evaluation with GSFC. Acoustic microscopy, HAST testing has been performed  Qualification program has been developed and approved by GSFC. CAL-004Very High  Delay in deliveries of flight CDEs  Our French collaborators are in the middle of a competitive procurement for the industrial partner that will fabricate all flight CDEs. The procurement process must follow French law and is potentially subject to the delay of administrative reviews  The selected industrial partner must design and fabricate appropriate tooling, develop controlled manufacturing process, fabricate and qualify CDE prototypes, and then fabricate 108 CDE for the CAL Qual model by mid August, 2003  A higher CDE manufacturing rate is an option to the French contract but may present financial and technical risks. The higher rate would deliver the later modules on schedule.  A supplemental vendor of CDEs appear to be one option for maintaining the baseline schedule for the first modules. This presents the problem of qualifying CDEs from more than one source.

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC CAL Risk Summary (2) ID #Risk RankRisk DescriptionRisk Mitigation CAL-005Moderate  CAL module subsystem performance problem detected in EM module test program  The CAL EM is the first opportunity for subsystem level testing of module performance. Issues such as noise, cross talk and correlation of measurements at two ends of CDE will be examined in detail for the first time  Testing at the AFEE board level with prototype boards and earlier version of ASICs give some confidence. However, problems were identified that could be related to PCB board layout or ASIC design problems  Accelerator beam testing of the assembled calorimeter is the best confidence test for the calorimeter electronic design. The schedule puts the calorimeter beam test after flight circuits have begun fabrication. Mitigation for electronic problems determined at beam tests is severe CAL-008Low  CAL AFEE board design, SMT manufacturing, testing, PEM assembly and qualification issues still to be resolved, since these processes have not been validated so far  Remaining EM boards will be fabricated using SMT processes and we will analyze any issue related to design, layout and manufacturing.  Prior to start of flight manufacturing, assembly processes and procedure will again be validated.

GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC Summary  The technical design of the CAL module is mature and verified –Most outstanding issues will be retired at the completion of EM test program in June –New PIN photodiode verification will complete as well in June –Updated ASIC versions will be verified in April –Essentially all documents will be released before CDR  The CAL schedule is aggressive in meeting all Level 3 milestones with appropriate schedule contingency –Recently discovered problem in deliveries of CDE will be resolved to meet the baseline schedule  CAL is ready for flight production –Technical risks are minimal –Schedule risk will be resolved