Bull·E: The Recycling Robot SECON Team B Final Presentation December 2, 2008.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Bad News Bots E2 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland Concept Design Review.
SOUTHEASTCON I KARMA ECE IEEE SoutheastCon Hardware Competition Must build an autonomous robot that can –Start at rest at the Starting Station.
M & M EE 296 Final Presentation Spring 2004 Presentation Overview Team Member Introduction Project Overview Overall Design Description Final Project.
TETRIX/VEX Challenge (use either robot hardware) There will be two events for the May Madness 2010 Challenge –The Grand Challenge - completely autonomous.
Critical Design Review Colorado State University - Pueblo April 15, 2005.
Final Presentation EE 296 – Micromouse Spring 2007 Friday, May 4, 2007 POST 214.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
Robotic Artificial Intelligence Toy (R.A.T.) CPE 4521 Final Design Presentation Presented by Shane R. Bright, Erik R. Brown, Wing-Seng Kuan, Micheal T.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Abstract Design Considerations and Future Plans In this project we focus on integrating sensors into a small electrical vehicle to enable it to navigate.
NEEDS ANALYSIS & REQUIREMENTS SPECIFICATION Southeast Con 1B “Success” Senior Design Team Louis Cooper Evan Marshall Chelsea Ogle Lorenzo Smith Ivan Vargas.
Concept Design Review THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI April 24, 2008.
By the end of this chapter, you should:  Understand the properties of an engineering requirement and know how to develop well-formed requirements that.
Microcontroller Hands-on Workshop #3 Ahmad Manshad New Mexico State University Institute of Electrical and Electronics Engineers November 7, 2009.
Tony Soprano: “Waste Management” Final Presentation Salvatore Torre 11/25/2008.
Robotic Sensor Network: Wireless Sensor Platform for Autonomous Topology Formation Project: Sponsored By: Advisor: Dr. S. Jay Yang, CEManager: Steven.
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
Presents: THE XR-82 PROJECT. Team Members James Flora Power Point Christopher Ho Report Editor Jonathan Hammer Parts Manager Kyle Tam Web Design Edel.
Advisor: Dr. Edwin Jones 1 Client: Paul Jewell ISU Engineering Distance Learning Facility May01-13 Design Team: David DouglasCprE Matt EngelbartEE Hank.
SECON Team Zulu IEEE SoutheastCon Hardware Competition 2010.
Final Presentation Senior Design II November 19, 2013 MyBand Fitness [1]
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design I.
The Recycling Robot SECON Team B Mid-Term Presentation.
The Smart/Safe Car Seat SENIOR DESIGN II FINAL PRESENTATION.
The Smart/Safe Car Seat SENIOR DESIGN II MID-SEMESTER PRESENTATION.
Grassinator1300 Senior Design Mid-Semester Design Presentation 2014.
Mid-Semester Presentation Senior Design October 5, 2010
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Mid-Semester Presentation Design I October 3, 2013.
SECON 2015 Midterm Presentation. The Team Bryce Amacker Team Leader Steven CalhounDexter Duckworth Ben Eisman Ryant Nelson Faith SmithTran Ton Dr. J.W.
SECON 2012 Midterm Presentation. Meet the Team Michael Helmbrecht Electrical Engineer Measurement Tasks Course Construction Chris Nicholas Computer Engineer.
SECON Team A Electrical & Computer Engineering Department Bull E Institute of Electrical and Electronics Engineers (IEEE) 2009 Southeastern Conference.
ClearVision Final Presentation Senior Design 1. Team Members Travis Ann Nylin Electrical Engineer System Testing Schematic Data-Logging and Retrieval.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
LUNAR Lunar Unmanned Navigation and Acquisition Robot SECON I Senior Design I Final Design Review November 29, 2007.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
Final Presentation.  The Team  Competition Overview  Design Constraints & Improvements  System Testing  Timeline  Bill of Materials.
Southeastern Conference 2014 Final Presentation. The Team Alex Holeczy Computer Engineering - Navigation - Debugging Thomas McCollum Electrical Engineering.
IEEE SoutheastCon Hardware Competition John DeBerry EE Major Chris Howell James Key Tim Jones EE Major CPE Major Chassis Construction Course Construction.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
SECON TEAM A Electrical & Computer Engineering Department Institute of Electrical and Electronics Engineers (IEEE) 2009 Southeastern Conference (SECON)
Final Presentation Glass Break Detection Team
Mark Randall & Kevin Claycomb Faculty Advisor: David Mitchell Industrial Sponsor: IEEE.
Team Alpha Institute for Electrical and Electronics Engineers (IEEE) 2010 Southeastern Conference (SECON) Hardware Competition.
SECON 2012 Final Presentation. Team Michael Helmbrecht Electrical Engineer Measurement Tasks Course Construction Chris Nicholas Computer Engineer Measurement.
Mid Semester Presentation. Team Members Chapman, Jonathan Duties: Recharging Circuit Major: Electrical Engineering Dang, Quoc Duties: Power Circuit, Website.
Project Overview  Introduction  Frame Build  Motion  Power  Control  Sensors  Advanced Sensors  Open design challenges  Project evaluation.
Daredevil Robot Direction Module (DRDM) Senior Design II Final Presentation.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
The Ultimate Dog Collar. Faculty Advisor Dr. Patrick Donohoe Daniel Stevenson (Electrical Engineering) Kaytan Mills (Electrical Engineering) Team Leader.
LUNaR SECON I Senior Design I Midterm Presentation October 4, 2007.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
Impulse Generator Control Module
The Ultimate Dog Collar. The Team Faculty Advisor Dr. Patrick Donohoe Daniel Stevenson (Electrical Engineering) Kaytan Mills (Electrical Engineering)
Mid-Semester Presentation Music Alarm Clock. Team Members Will Kalish Electrical Engineering Removable Media Device Audio Decoder Eric Womack Electrical.
The Recycling Robot SECON Team B Mid-Term Presentation.
RFID AC SWITCH Mid-Term Presentation September 30, 2008.
The Recycling Robot SECON Team B Mid-Term Presentation.
LUNAR SECON Team 2 Senior Design 2 Mid-Semester Presentation February 28th, 2008.
Final Presentation Glass Break Detection Team
SECON Team A Electrical & Computer Engineering Department Institute of Electrical and Electronics Engineers (IEEE) 2009 Southeastern Conference (SECON)
IEEE South East Conference 2016 MID-SEMESTER PRESENTATION.
IEEE South East Conference 2016 MID-SEMESTER PRESENTATION.
IEEE South East Conference 2016 MID-SEMESTER PRESENTATION.
Electrical & Computer Engineering Department Bull E SECON Senior Design II Final Presentation April 21, 2009.
ROBOT ARM 2017 Rules Rachel Mason.
SoutheastCon 2016 Hardware Competition
Presentation transcript:

Bull·E: The Recycling Robot SECON Team B Final Presentation December 2, 2008

Team B Dr. Bryan Jones, Advisor Jeff Brantley Jonathan Bryant Brooke Grantham Kevin Vu SortingXX StorageXX DiscriminationXX NavigationXX

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Problem Statement Autonomous recycling robot for 2009 IEEE SECON hardware competition Must locate, acquire, sort, and store recyclables on the robot. 10 Recyclables include: –5 aluminum cans –3 plastic bottles –2 glass bottles Maximum Starting Size: 12”x12”x18” [1] [2]

Competition Playing Field Artificial turf 8’x8’ Electric dog fence boundary 10’x10’ Hard boundary Recyclables will be placed on their sides The recyclables arrangement will be the same for each heat [1]

Competition Recyclables [1]

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Team Tasks Driving Navigation Boundary Detection Acquisition Target Detection Discrimination Sorting Storage Team A Team B

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Physical Model

Informational Model

Prototype

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Practical Constraints NameDescription Manufacturability The robot must fit inside a 12" X 12" X 18" box before beginning of each round. Sustainability The robot must operate at least 4 minutes on a single battery charge.

Manufacturability Actual dimensions: 19”W x 16”H x 15”D –Inaccuracies to be expected in prototype Standard-length Vex Robotics parts for frame exaggerate height Breadboard and wires add inches to depth –Final design will require minor adjustments, not a major redesign Use custom-size materials Move servos & motors into dead storage space

Practical Constraints NameDescription Manufacturability The robot must fit inside a 12" X 12" X 18" box before beginning of each round. Sustainability The robot must operate at least 4 minutes on a single battery charge.

Sustainability Robot must be able to run for a full round (4 min.) on a single battery charge Battery choice: –Lithium-Ion Powerizer (14.8 V, 4800 mAH) High energy density Protection circuitry housed on battery package Battery life: –Theoretically, 4.8 hours –Realistically, about 15 minutes (older battery)

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Technical Constraints NameDescription Target Discrimination The robot must recognize the containers as being either glass, aluminum, or plastic. Sorting The robot must sort the recyclables into three different containers. Storage Capacity The robot’s storage compartments must accommodate all 10 containers that will reside on the playing field. Navigation The robot must travel within the 10’ X 10' square boundary without contacting or extending over the boundary.

Target Discrimination IR Sensor and FSR –IR senses object presence and signals robot to begin sampling FSR output –FSR outputs voltage based on weight of recyclable

Lift IR Sensor Testing ExpectedActual No Item0.5V0.6V GlassV out > 0.75V1.42V PlasticV out > 0.75V1.23V AluminumV out > 0.75V1.72V

FSR Testing Expected1234 Glass3.0V3.21V3.51V3.54V3.56V Plastic0.6–2.0V1.41V1.44V1.38V1.32V Aluminum0.0V

Target Discrimination Problems –IR sometimes gave false detection Noise on sensor output –FSR placement Glass bottles and aluminum cans were identified incorrectly Proper weight distribution onto sensing area of multiple FSRs

Target Discrimination RecyclableExpected12345 GlassGreen Red 0.0VYellow 1.86V PlasticYellow AluminumRedYellow 0.86V Red

Target Discrimination Solution –Filter IR sensor output with capacitor –Adding layer on FSR to center weight onto sensing area –Using only one FSR in the middle –Adding brackets to the sides of the lift

Target Discrimination

Technical Constraints NameDescription Target Discrimination The robot must recognize the containers as being either glass, aluminum, or plastic. Sorting The robot must sort the recyclables into three different containers. Storage Capacity The robot’s storage compartments must accommodate all 10 containers that will reside on the playing field. Navigation The robot must travel within the 10’ X 10' square boundary without contacting or extending over the boundary.

Sorting Lift System –Rear Placement –Stepper motor –Guide Rails –Trap Door Servo

Sorting Problem –Binding when lifting glass bottle Short Term Solution –Decreasing the speed to increase the torque capability Long Term Solution –Restructure the bracing of lift platform so weight of container is distributed evenly

Stepper Motor Testing Verify correct output stepping sequence Q1Q2Q3Q4 Step Step Step Step Step 11010

Stepper Motor Testing Oscilloscope readings show correct stepping sequence Signal captured starts with step four

Stepper Motor Testing Two different delay periods used –increases force needed for lifting glass bottle weight Measurements shown include the period for two steps

Storage Box Servos Measured PCM signals from PIC Visually inspected servo positions Trap door closed / Flap openTrap door open / Flap open

Technical Constraints NameDescription Target Discrimination The robot must recognize the containers as being either glass, aluminum, or plastic. Sorting The robot must sort the recyclables into three different containers. Storage Capacity The robot’s storage compartments must accommodate all 10 containers that will reside on the playing field. Navigation The robot must travel within the 10’ X 10' square boundary without contacting or extending over the boundary.

Storage Capacity Storage Box –3 internal compartments –Plastic bottle compartment Expanded to store bottles –Aluminum can compartment Trap door

Storage Capacity

Technical Constraints NameDescription Target Discrimination The robot must recognize the containers as being either glass, aluminum, or plastic. Sorting The robot must sort the recyclables into three different containers. Storage Capacity The robot’s storage compartments must accommodate all 10 containers that will reside on the playing field. Navigation The robot must travel within the 10’ X 10’ square boundary without contacting or extending over the boundary.

Navigation Navigation not yet implemented –Integration of both teams’ subsystems took longer than expected –Dog fence sensor unavailable for boundary detection –Will be a major focus in the spring

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

System Test StepComponent Container DetectionLift IR Container DiscriminationFSR SortLift and Box Servos StorageBox Compartments

System Test Results Step ContainerDetectionDiscriminationSortStorage Aluminum Can Pass Plastic Bottle Pass Fail Glass Bottle Pass

Outline Competition Overview Project Division Design Overview Practical Constraints Technical Constraints System Testing Spring Semester Goals

Rebuild storage box –Rigid material to stabilize robot frame –Resize to house motors & fit all cans Fine-tune discrimination Brace & speed up stepper motor Implement & test navigation PCB Design

References [1] Institute of Electrical and Electronics Engineers. Southeastcon 2009 Hardware Competition: The Recycling Robot, 2008 August 28, Con-2009-Hardware-Rules.pdf. Accessed September 16, [2] J. Brantley, J. Bryant, K. Grantham, K. Vu. Bull-e: An Autonomous Recycling Robot, n/FinalDesignDocumentTeamB.pdf. Accessed December 1, 2008

Questions?