WITSML Use Cases April 2005 Workflow Priorities. Use case priorities Review from Paris mtng Daily Drilling Reports – defer till current applications implementations.

Slides:



Advertisements
Similar presentations
ICANN Plan for Enhancing Internet Security, Stability and Resiliency.
Advertisements

IHE Profile Proposal: Dynamic Configuration Management October, 2013.
SPE WITSML: Technology to Business (T2B) for the Oilfield J
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
Completion Object Overview June 2013 WITSML/PRODML Standards.
Technology Programme Competitions Oil and Gas Technologies.
WITSML Update Presentation to Energistics Regional Meeting, London
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
Speedstack: PCB Stack Up Data Exchange Using IPC-2581 Rev B
DICOM and Integrating the Healthcare Enterprise: Five years of cooperation and mutual influence Charles Parisot Chair, NEMA Committee for advancement of.
City of Houston Core Infrastructure Roadmap Architecture and Discovery.
Florida’s Water Management District Permitting Website – Phase II (Permitting Portal II)
Global Real Time More Efficiency. More Possibilities and.
Cisco Confidential 1 © Cisco and/or its affiliates. All rights reserved. Last Updated: April 2014 Instructions for Navigating in the Training.
Speaker Introduction John Shields Software Projects Manager, Baker Hughes, Aberdeen 30 years working for Baker Hughes 30 years working for Baker Hughes.
Schlumberger Update Nigel Deeks Real Time Technology Manager
12 Building and Maintaining Information Systems.
1 Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services.
Completing & Producing A Well
And Together. Free your energies New XML schema and HTML report layout Daily Drilling Report Phase II.
Technical Team WITSML SIG Paris 16 May Technical Team Representatives mainly from service companies Energistics (Gary) keep a global issue list.
CEGAA-OSI EE PARTNERS WORKSHOP Teresa Guthrie March 2009 Report preparation - structure, techniques, quality, referencing.
Security, Stability & Resiliency of the DNS Review Team (SSR) Interaction with the Community.
Why does my perfectly working App Crash and Burn in Production? Matt Kramer Project Manager, STL Boeing Scalability Test Lab cell.
Real-time Operations Center Architecture
WITSML an update Calgary Workshop April Introduction Vision Reflection Motivation Achievements Activities Plans Expectations Alignment.
Applications of RFID in a port cargo terminal
© Copyright 2005 POSC WITSML™ SIG Meetings and Public Seminar Alan Doniger, POSC May 10-12, 2005.
WITSML Use Cases Calgary Workshop April Use Cases / Practical Implementations of WITSML Where are we now ? Different drivers in different Operators.
Screening and Selecting Software. HRIS Project Phases NeedsAnalysis Design & Development Implementation & Maintenance.
1 Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services.
© Copyright 2006 POSC WITSML™ Public Seminar Use Case and Requirements Team Dr Julian Pickering, BP May 11, 2006.
Energistics Asia South Region Meeting: (Drilling) WITSML SIG Update New Delhi, IndiaAlan Doniger 14 January 2007Chief Technology Officer Le M▲ridien New.
WITSML Paris 16-May-2007 Rick Morneau
Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services /
Welcome to the WITSML Public Seminar and Vendor Exhibition Paris, France 16 May 2007 Sponsored by Total.
12/4/ OBIEE Technical Conference Getting Started with a Dashboard Development Project Theresa May.
WITSML™ Drilling Standards Pemex 21 August 2008 Ciudad de México Alan Doniger, Energistics.
Intelligent Services and Tools for Concurrent Engineering Proposal number : IST AEC3 Structural Information Model Dr. Thomas Liebich Jeffrey.
© 2004 Weatherford. All rights reserved. Thomas Koithan Engineering Project Supervisor Software Development April 29, 2004 WITSML Approach © 2004 Weatherford.
1 Encore Data Distribution Services Workshop February 19, 2004.
Using WITSML to deliver value in BP Presentation to public meeting 16 th May 2007 Dr Julian Pickering, Domain Lead Drilling & Completions BP Research.
SLRRP BoF 62 nd IETF Scott Barvick Marshall Rose
Baker Hughes & WITSML WITSML Conference – Houston, May 2005
WITSML SIG Area of Interest –the definition, movement, and storage of drilling data, information, and knowledge, especially the “right time” seamless flow.
e&pdct Using WITSML to deliver enhanced D&C performance in BP Presentation to public meeting 19/10/06 Julian Pickering, Domain Lead Drilling & Completions.
Strategy Summary Steering Committee. Discussion Discussion around and adoption –Sharing test results –Shorten deployment time –Build use cases.
© ChevronTexaco 2001 DOC ID ETC/Technical Computing Well Schematic & Completions WITSML SIG April 28-29,2004 Danny Bush.
PRODML Roadmap Energistics 2 nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford.
1 Options Clearing Corporation Encore Data Distribution Services April 22, 2004.
WITSML Technical Team Aberdeen, Oct Technical Team Organization Representatives from service companies Monthly conference calls 2 day session at.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
Behavioral Health Transition to Managed Care Update APRIL 2015 Certified Community Behavioral Health Clinics (CCBHC) Planning Grant and Demonstration.
© 2010 IBM Corporation RESTFul Service Modelling in Rational Software Architect April, 2011.
Hydraulic Fracturing (Fracking)
Empowering Your Collections Team. The Collections Management Query Process Design, organize, Implement 1 The Collections Query 2 How Can We Use a Query.
1 3:00 PM, EST. 2 Don Hewitt Vice President, Business Operations OSEHRA Ramina Toy Program Manager Brad Triebwasser.
WITSML direction in BP SIG Public Meeting – May 2006 Dr Julian Pickering Domain Lead, Drilling & Completions.
OFFICE OF FINANCIAL MANAGEMENT 0 Office of Financial Management Office of Financial Management BASS Budget Officers May 1, 2002.
Omniture process document for MAMs. 1.Confirm with the Sales Manager that the Omniture contract is signed by the agency 2.Create a user account under.
Input to project from IIP
(B.P :51) ( B:P52 ).
Julian Pickering, Domain Lead Drilling & Completions
Sample Presentation. Slide 1 Info Slide 2 Info.
Completion Object Overview
تهیه و تنظیم :حسین عروجی
مـانــــــور زلـــزله
HSE Competence Leaders.
EPIM RUF meeting June 16th 2009
Fixtures, Jigs, and Check Gauges
Presentation transcript:

WITSML Use Cases April 2005 Workflow Priorities

Use case priorities Review from Paris mtng Daily Drilling Reports – defer till current applications implementations mature. Needs import and Export capability) Completions / Well Mechanical objects Chevron and BP interest. Danny and MK to work (Wellheads ?) Chevron and BP interest. Danny and MK to work (Wellheads ?) Extensions and enhancements Priorities ? Priorities ? Test server and test data set by Operators Test server and test data set by Operators HSE data (EEMES ?) + POB info (IDS proposal) HSE data (EEMES ?) + POB info (IDS proposal) Need to fix time issue for moving between time zones.

New areas of workflow interest Well interventions and Well Services Well stimulation (Including new construction ?) Frac, OHGP, FracPack, Acid treatments etc. Well stimulation (Including new construction ?) Frac, OHGP, FracPack, Acid treatments etc. Well Service rig daily reporting (Typically includes more tabular data than in a Daily drilling report) Well Service rig daily reporting (Typically includes more tabular data than in a Daily drilling report) Pason and Key To lead with model samples in 1.3 format Pason and Key To lead with model samples in 1.3 format

Profiles Operators to work together on Server Profiles for contract wording on detail of required deliverables for specific projects. Try to develop standard layout for contractual wording on implementation requirements

Data Management discussion How can WITSML enabled stuff live in an overall data management environment ? What are the boundaries of Transfer to Data Management in the standard What are the boundaries of Transfer to Data Management in the standard Need for tag ID’s, both physical tag ID’s (RFID on BHA etc.) and data object tags (Creator and time stamp) Need to change format in the future, needed technical team for some issues Stability for 1.3.x ? Yes. No big issues currently out there.