Mark Woodley, SLACATF2 Project March 20-21, 20071 Next version of MAD decks (v3.7): what needs to be added/deleted?

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnetic Specifications and Tolerances Weiming Guo, NSLS-II Project In this presentation I briefly introduced the.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
First investigations of ATF2 at SLAC Axel Brachmann, Thomas Himel, Tom Markiewicz, Janice Nelson, Toshiyuki Okugi, Mauro Pivi, Tor Raubenheimer, Marc Ross,
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
Emittance Measurements and Related Experimental Results 15th ATF2 Project Meeting, January M. Woodley1/44.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
CEPC DA due to magnets' error Sha Bai, Dengjie Xiao, Yiwei Wang, Huiping Geng, Dou Wang, Tianjian Bian, Feng Su, Jie Gao The first IHEP-BINP CEPC Accelerator.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
ILC BDS LATTICE DESIGN WITH TDR PARAMETERS
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
ILC BDS Alignment, Tuning and Feedback Studies
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 IP Tuning Task Simulation Updates
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
Emittance Diagnostics
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Final Focus optics for Possible New B-Line
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Linac Physics, Diagnostics, and Commissioning Strategy P
Y. Nosochkov and M. Woodley (SLAC)
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?

Mark Woodley, SLACATF2 Project March 20-21, turn EXT sextupoles OFF; rematch in FF 2.use measured LEFF for QEA's 3.use estimated LEFF and design APER values for FD quads (FFTB 1.38Q17.72; shimmed to 50 mm Φ) 4.use estimated LEFF and design APER values for FD sexts (FFTB 2.13S3.00) 5.use Cherrill’s estimated LEFF and design HGAPs for FF bends (DEA-D38L575) 6.use Cherrill’s estimated LEFF and design APERs for FF sexts (1.625SX3.53) 7.remove FF octupoles & decapoles 8.add Q-BPMs to all quads and sexts from QD18X to FD 9.add IP-BPMs to FD quads and sexts 10.add MOVERs to all FF quads and sexts 11.add diagnostics stations (extLW,FONT,nBPM,IPBPM)... just reserve spaces for now 12.add Glen's feedback devices (or adjust optics to use "existing" devices?) 13.add IP BSMs for commissioning (carbon wire scanner, Honda monitors) 14.add sweeping magnet for IP position scan 15.add 5 stripline BPMs (for commissioning) 16.add 2 ICTs 17.add 4 screen monitors plus 1 OTR monitor 18.add 4 reference cavities for Q-BPMs... one at start of each straight segment 19.add MARKER points to locate start and end of FD table (CLIC table: L = 240 cm) 20.collimators? 21.dipole correctors in FF? 22.add vacuum component callouts (tees, pumps,... )... MARKER points Questions

Mark Woodley, SLACATF2 Project March 20-21, IDX skew quads will be located optimally in EXT for correction of vertical dispersion; EXT chromatic correction sextupoles will not be installed initially, but locations for them will be reserved and optics will be created; FF sextupoles will be adjusted 2.average measured QEA effective length = cm 3.“rule of thumb”: core length (17.72 inches) + bore radius (25 mm) = m 4.LEFF = 100 mm; APER = mm (from FFTB DIMAD deck) 5.LEFF = cm; full gap = 3.81 cm 6.LEFF = mm; APER = mm (from SLC FF TRANSPORT deck) 7.octupoles and decapoles will be removed from the deck 8.Q-BPMs at downstream ends of magnets; 27 mm from magnet face 9.per Honda-san’s and Okugi-san’s drawings: upstream face for sextupoles; downstream face for quadrupoles; 82.5 mm from magnet face 10.MARKER point at each magnet’s center 11.from Honda-san’s “Re-location session summary” from 3 rd Project Meeting FONT: in the coupling correction section extLW (μ-size): downstream of QF19X (need “small spot” optics) extLW (2D): downstream of QD20X nBPM: downstream of QF21X IPBPM: downstream of QM11 12.see Glen 13.initial guess ±30 cm from IP (need magnet settings for scanning beam waist upstream and downstream of IP) … Okugi-san will ask Shintake monitor group for their space requirements 14.downstream of QD0 … need to know space requirements for sweeper magnet 15.no stripline BPMs needed 16.near QF19X; near dump 17.near QF1X; between QD10 and QF9; upstream of SF1; near dump; OTR at downstream end of septum BS3X 18.upstream of QD18X; downstream of B5; downstream of B2; downstream of B1 19.start: 245 mm upstream of SF1 centerline; end: 245 mm downstream of QD0 centerline 20.no collimators (to begin with) 21.for commissioning … needs study 22.see Terunuma-san Answers