1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National.

Slides:



Advertisements
Similar presentations
Data Center Design Issues Bill Tschudi, LBNL
Advertisements

Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
Chapter 3 Dynamic Modeling.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Model predictive control for energy efficient cooling and dehumidification Tea Zakula Leslie Norford Peter Armstrong.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
Dr. Jie Zou PHY Chapter 7 Numerical Differentiation: 1 Lecture (I) 1 Ref: “Applied Numerical Methods with MATLAB for Engineers and Scientists”, Steven.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
Chemical Engineering Department
Tutorial 5: Numerical methods - buildings Q1. Identify three principal differences between a response function method and a numerical method when both.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
Jeff T. Collins Undulator Support/Mover System January 2008 LCLSLCLSLCLSLCLS LCLS Undulator Support/Mover.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Chris Channing P.E. Sr Project Engineer NSLS-II Conventional Facilities - Thermal Stability May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Low Cost Infrared Touch Screen Bezel for POS Systems Rohan Verma, Jeremy Taylor, Freddie Dunn III Georgia Institute of Technology School of Electrical.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Strategic Planning John Hill Experimental Facilities Division Director NSLS-II EFAC May 5 th 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
Announcements Topics Lab this week: Frog Reflexes
BME 353 – BIOMEDICAL MEASUREMENTS AND INSTRUMENTATION MEASUREMENT PRINCIPLES.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Lecture Objectives: Define the final project Deliverables and Grading policy Analyze factors that influence accuracy of our modeling study Learn about.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop R. Casey Activation Issues for NSLS-II March 28, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
High Accuracy Lab in the Private Sector Doug Cooper.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Anti project. F. Raffaelli. INFN CERN, April 05 th, Thermal Analysis of the Anti transportation. -Calculation of the manhole loads due to the valve.
 Our aim is to develop a catalytic combustion chamber in order to make the combustion of lean mixture faster. By increasing the fast rate of burning.
Process Simulation for the LCLS-II Cryogenic Systems
St. George Infrastructure
Gravity and Projectile Motion
Electronic Instrumentation Lectrurer Touseef Yaqoob
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
PERFORMANCE EVALUATION Economizer Enthalpy Sensors
ISO New England System R&D Needs
Maintenance at ALBA facility: Strategy for the conventional services
ILC Main Linac Superconducting Splittable Quadrupole
CLIC damping rings working plan towards the CDR
Novel Accelerator and Detector Systems
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National Synchrotron Light Source – II Project April

2 BROOKHAVEN SCIENCE ASSOCIATES Temperature stability goals Key temperature stability requirement is tunnel +/- 0.1C (+ /-.18 F) at any given location over 1 hour Key parameter is temperature stability and repeatability vs. absolute accuracy. Tunnel temperature of 78 was selected to eliminate the concern of a temperature gradient between the experimental floor and the tunnel. The tunnel air conditioning system will be designed to accommodate tunnel temperatures between 75 and 85 F. During commissioning period, tests will be conducted to determine the optimum tunnel setpoint temperature.

3 BROOKHAVEN SCIENCE ASSOCIATES Temperature stability The following will be done to achieve the requirements. Requires high resolution industrial grade instruments and controls with excellent repeatability. Will use narrow span thermistor/transmitters with.01 C sensitivity. Control scheme using programmable controllers with 14 bit resolution. We will use a control program we have written which reset the discharge air temperature in response to room temperature deviation from setpoint. The program resets and controls discharge air temperature to find the exact supply temperature required to satisfy the load requirements. This minimize the temperature fluctuation in the room. We have several application were we currently use this concept to achieve +/- 0.1C control. We will use electric reheat with SCR control to allow for fast accurate control of discharge air temperature.

4 BROOKHAVEN SCIENCE ASSOCIATES Temperature Stability cont. It is not envisioned that the economizer will be used during beam mode to keep stable tunnel conditions. Should be readily achievable provided loads to accelerator components are relatively steady-state. We are working with APS to modify a section of their tunnel system to prove out our concept. We will also be investigating thermal modeling of the tunnel equipment and air flows to verify our assumptions.

5 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Temperature Control

6 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Air Distribution

7 BROOKHAVEN SCIENCE ASSOCIATES Example of control system stability

8 BROOKHAVEN SCIENCE ASSOCIATES Example of control system stability

9 BROOKHAVEN SCIENCE ASSOCIATES Example of control system stability DASHED CURVE IS REQUIRED DISCHARGE AIR SET POINT TO MEET LOAD ON TOP OF IT IN YELLOWIN YELLOW IS ACTUAL DISCHARGE AIR SETPOINTSYSTEM CONTROLLED TO. TEMPERATURES IN DEGREES F

10 BROOKHAVEN SCIENCE ASSOCIATES Path Forward Evaluating thermal modeling software and vendors and are leaning toward Thermo Analytics Investigating thermal modeling of the tunnel equipment and air flows to verify our assumptions. Also model different supply and return flow configurations. Planning to modify a section of APS tunnel system to prove out our concept. Have included some of our concepts into the new Center for Functional Nanomaterials Building and will be using information learned from those systems to prove out and refine our concepts.