Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
The Future of Accelerator R&D at Fermilab Steve Holmes Accelerator Physics & Technology Seminar January 30, 2007.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
F Project X Overview Dave McGinnis October 12, 2007.
 Advanced Accelerator Simulation Panagiotis Spentzouris Fermilab Computing Division (member of the SciDAC AST project)
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
Staging of a Neutrino Factory (and beyond…) Mark Palmer Director, US Muon Accelerator Program NuFACT 2014, Glasgow, August 25-30, 2014 NUFACT2014 XVIth.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
MCTF Steve Geer AAC Meeting May MUON COLLIDER & NEUTRINO FACTORY R&D AT FERMILAB Overview of organization, budgets, and plans.
Harold G. Kirk Brookhaven National Laboratory Report from the NFMCC MUTAC REVIEW Lawrence Berkeley National Laboratory April 8, 2008.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
J. Corlett. September 24, 2007 Report of the Fermilab Accelerator Advisory Committee on the Fermilab Steering Committee Report P5 Meeting Fermilab September.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
A vision for Fermilab Presentation to the National Academy Panel EPP 2010: Elementary Particle Physics In the 21 st Century Pier Oddone, 5/16/05.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Presentation of Charge and Overview of Fermilab R&D Programs Steve Holmes Accelerator Advisory Committee Meeting (
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Muon Accelerators for Particle Physics Working Group Summary Conveners: Jaroslaw Pasternak Imperial College/RAL STFC Mark Palmer Fermilab Proton Accelerators.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
From Accelerator Physics Center 09/02/2014V. Shiltsev | AD/APC All-Hands Meeting1.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Workshop on ARD at FNAL 1 CDF DØ Tevatron Main Injector\ Recycler Antiproton source Proton source V.Shi ltsev (FNA L) - EPA C'08 NML.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Introduction to ASTeC Programmes
Yet Another Report from DOE Office of High Energy Physics
Prospect of Indo-US Collaboration
Presentation transcript:

Fermilab Accelerator R&D Strategy Steve Holmes URA Visiting Committee May 8, 2006

Page 2 URA Visiting Committee, May 8, 2006 – S. Holmes f Outline Strategic Framework Program Elements and Goals –LHC/Accelerator Research Program –International Linear Collider –High Intensity Neutrino Source –Muon Facilities –AARD at the Photoinjector Laboratory Education Programs Resources Note: This presentation does not cover the significant accelerator R&D program that has operated in support of Collider Run II.

Page 3 URA Visiting Committee, May 8, 2006 – S. Holmes f Strategic Framework: Context Fermilab has operated the highest energy particle accelerator in the world since –This will change in –Current plan: Tevatron operations will cease on October 1, 2009 Fermilab currently operates the most advanced long- baseline neutrino program in the world... –J-PARC will become competitive in

Page 4 URA Visiting Committee, May 8, 2006 – S. Holmes f Strategic Framework: The Vision “A strong and vital Fermilab is an essential element of U.S. leadership in elementary particle physics. Fermilab must play a major role in advancing the priorities identified in this report.” EPP2010 Report EPP2010, the Office of Science Twenty Year Plan, and the Fermilab Long Range Plan establish similar goals for Fermilab: –Energy Frontier: LHC and ILC –Neutrinos: MW class accelerator facility Vision augmented by increased commitment to R&D aimed at the long term future, commensurate with our responsibilities as the U.S. center of accelerator based EPP at the end of the decade  Requires an aggressive R&D program accompanied by development of new core competencies at Fermilab.

Page 5 URA Visiting Committee, May 8, 2006 – S. Holmes f Strategy Priority to R&D aimed at supporting ILC design and development efforts, and establishing Fermilab as both the world leader in scrf technologies and the preferred host laboratory (Bob K.). Commitment to expeditious commissioning and development of upgrade options for the LHC. Development of options for enhanced capabilities within the U.S. neutrino program. –Proton Plan II/SuperNuMI –High Intensity Neutrino Source Support for activities aimed at the longer term future. –Muon R&D –Photoinjector Program

Page 6 URA Visiting Committee, May 8, 2006 – S. Holmes f Strategy Integration within the National Program ILC –Strong coupling to the GDE (resources and key people) –U.S. center for scrf development, including industrialization  Can’t do this on our own: significant help from ANL, Cornell, DESY, INFN, JLab, KEK, LANL, MSU, NIU, Penn, SLAC LHC/LARP –National collaboration with Fermilab as lead lab: Fermilab, BNL, LBNL, SLAC; close cooperation with CERN –Close cooperation in our materials program with UW and NWU. All our efforts are now leveraged via (inter)national partnerships

Page 7 URA Visiting Committee, May 8, 2006 – S. Holmes f Strategy Integration within the National Program High Intensity Neutrino Source –National collaboration formed to pursue R&D on the Neutrino Source: Fermilab, ANL, BNL, LBNL, MSU, (SLAC, JLab) Muon Facilities –National collaboration sponsored by Fermilab, BNL, and LBNL –Signficant university involvement including (locally) IIT, NIU, UC, UIUC, NWU AARD at the Photoinjector –Participating institutions include DESY, LBNL, NIU, Rochester, UC, UCLA, UIUC Significant interaction with small business via SBIRs −Muons (high pressure absorber; cooling concepts) −ILC (cavity fabrication techniques; polarized rf gun)

Page 8 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals Establishing Core Competencies The main branches within our future rely on superconducting radio frequency acceleration as a technology base.  It is critical that Fermilab establish world-leading expertise. –Has triggered a very significant investment in infrastructure and people Fermilab has historically been a/the world leader in superconducting magnet technologies, a capability that was dissipated and then reconstituted at great effort in the late 1990s. We will continue the investment. Accelerator simulations are an increasingly important component in the design of large, state-of-the-art accelerator facilities –We have been a major participant in the SciDAC program and will continue/expand this effort, which is well aligned with future priorities

Page 9 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals LHC/LARP Goals: –Successfully commission the LHC –Demonstrate, by 2010, a Nb 3 Sn based high performance quadrupole suitable for utilization in a LHC luminosity upgrade Fermilab Role: –Fermilab “core program” and LARP are now closely aligned  Both programs oriented to quadrupole development –Major step forward in last year—identification of conductor instability as potential limitation in Nb 3 Sn magnets, and successful solution –Major commitment to hardware and beam commissioning  Remote control room

Page 10 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals LHC/LARP “A major achievement of the HFM group has been their discovery that high performance Nb 3 Sn dipole magnet performance can be gravely compromised by flux jump instabilities, which are inherent to all present designs of high-Jc Nb 3 Sn conductors. This finding, controversial at first, short sample limit has now been generally accepted. Its implications must be recognized for all high field Nb 3 Sn multipole magnet designs. The group is lauded for clearly defining the stability problem in these magnets.” January, 2006 Director’s Review

Page 11 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals High Intensity Neutrino Source Goals: –Execute a plan for reaching ~1 MW beam power based on utilization of current accelerator assets freed up following completion of Run II  Proton Improvement Plan aims for 400 kW before end of Run II  Recycler as a proton accumulation ring: ~700 kW  Antiproton Accumulator as a momentum stacker: >1 MW –Develop/demonstrate critical technology elements that could enable construction of a very high intensity (>2 MW) neutrino source when married to ILC developed technologies  Acceleration of beam with spoke resonators  rf distribution system capable of powering multiple  <1 structures off a single klystron  8 GeV H - beam transport and MI injection  Intensity limitations in the Main Injector  Targeting 2 MW beam power Meson Lab Test Facility: 100 MeV beam in 2009

Page 12 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals High Intensity Neutrino Source

Page 13 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals Muon Facilities Goal: –Develop design concepts and demonstrate the critical underlying technologies that could support construction of a muon storage ring as a long term option for EPP Fermilab role: –Fermilab is host to the MuCool activity, centered around the MuCool Test Area (MTA)  Development of technologies for ionization cooling  Aimed at the Muon International Cooling Experiment (MICE) at RAL –New design concepts  Bunch rotation, FFAG acceleration, storage ring design Muon facilities play an important role in our R&D program:  May be the only long term path to multi-TeV leptons and/or CP in neutrino sector

Page 14 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals Muon Facilities: MuCool Test Area Facility to test all components of cooling channel (not a test of ionization cooling), with beam –Designed to accommodate full Linac Beam (goal: )   600 W into 35 cm LH2 400 MeV –RF 201 and 805 MHz Program –201 and 805 MHz cavities in magnetic filed –Absorbers –Cavities utilizing high pressure H 2 (SBIR)

Page 15 URA Visiting Committee, May 8, 2006 – S. Holmes f Program Elements and Goals AARD at the Photoinjector Wide variety of AARD programs based on 15 MeV e - beam –Flat beam –Plasma wakefield –Beam diagnostics –ILC DR kicker –Polarized rf gun Destined to move to ILCTA in 2007 –AARD will continue in parallel with ILCTA support

Page 16 URA Visiting Committee, May 8, 2006 – S. Holmes f Educational Programs Accelerator Phd Program −Initiated 1984; first graduate in 1987 −30 PhD and 1 Masters graduates –26 home universities represented −8 current students Fellowships −Peoples Fellowship – Accelerator Science −Bardeen Fellowship – Accelerator Engineering USPAS host Joint appointments –With IIT and NIU (tenure track level) Joint programs –Joint operation with NIU of FNPL (aka A0 photoinjector) –Joint ME program in rf under development with NIU

Page 17 URA Visiting Committee, May 8, 2006 – S. Holmes f Resources The message: –We are in the midst of a very significant buildup in Accelerator R&D (even more evident if we went back to FY2004: $9.8M) –Build up is aligned with the laboratory’s strategic vision

Page 18 URA Visiting Committee, May 8, 2006 – S. Holmes f Summary Fermilab’s future requires that we become a world leader in scrf technologies while maintaining our core competency in superconducting magnets. –Energy Frontier and Neutrinos –By the end of the decade we expect to be the world leader in scrf and in sc magnets The program is appropriately balanced between near, intermediate, and long-term while leveraging multiple scrf activities to cover uncertainties in the ILC schedule. –The program relies on an extensive collaborative framework involving outside laboratories and universities. We are in the initial stages for a very significant buildup in scrf capabilities and infrastructure in support of this program. Details in subsequent presentations