Scientific Irrigation Scheduling Subcommittee Thursday, August 8 2013 1pm – 3pm, PDT.

Slides:



Advertisements
Similar presentations
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Advertisements

Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Transformer De-Energizing & Dairy Plate Heat Exchanger Standard Protocol Proposal Presentation to the RTF February 20, 2013.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Agriculture Measures in the 7 th Plan RTF Meeting January 21, 2015.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
© 2012 Cascade Energy, Inc. Draft Presentation of Five Standard Protocols Presented by: Zach Podell-Eberhardt Rob Travis Craig Phillips Steve Koski Cascade.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N DRAFT: Methods for Evaluating Residential Behavior-based Programs RTF Presentation February 2,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Direction on Guidelines Savings Definition Path: CONTINUED Remaining Useful Life (RUL) and Measure Interaction Regional Technical Forum February 19, 2014.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Scientific Irrigation Scheduling Provisional Standard Protocol Ryan Firestone Regional Technical Forum February 18, 2015.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Scientific Irrigation Scheduling Update Regional Technical Forum June 17, 2014.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
0 Study of Irrigation Scheduling Practices in the Pacific Northwest Sponsored by: Bonneville Power Administration, Pacific Northwest Generating Co-Op.,
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE Northwest Ductless Heat Pump Pilot Project Impact & Process Evaluation: Billing Analysis Ecotope, Inc. February.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Scientific Irrigation Scheduling Subcommittee Update Regional Technical Forum June 2, 2014.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
1 NORTHWEST ENERGY EFFICIENCY ALLIANCE March 18 th, 2015 Residential New Construction Standard Protocol Subcommittee Kick-off.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
RTF Residential Lighting Subcommittee Tuesday, March 4, 11am – 12:30pm 1.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum October 16, 2013.
Refrigerator Recycling UES Measure Subcommittee Adam Hadley Subcommittee of the RTF September 1, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Information-Technology RTF Sub-Committee July 2, 2013 Mira Vowles, P.E., CEM Emerging.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF Research and Evaluation Subcommittee December 2, 2014.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Barriers to Implementing Energy Efficiency at Small and Rural Utilities Jennifer Anziano and Ryan Firestone August 19, 2015.
Scientific Irrigation Scheduling Provisional Standard Protocol Ryan Firestone Regional Technical Forum December 8, 2015.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
Defining the RTF’s Role in Research Jennifer Anziano Regional Technical Forum May 15, 2015.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Research Strategy: Residential Ductless Heat Pumps Research and Evaluation Subcommittee Christian Douglass and Josh Rushton January 8, 2016.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
EM&V Planning and EM&V Issues
Presentation transcript:

Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT

Agenda Introductions [10 minutes] Subcommittee objectives [5 minutes] Summary of last meeting and subsequent RTF staff work [10 minutes] Proposal for provisional standard protocol [20 minutes] Discussion and next steps [20 minutes] 2

Introductions 3

Subcommittee Objectives Determine whether or not there is sufficient knowledge and data to support a Scientific Irrigation Scheduling (SIS) standard protocol in compliance with the RTF Guidelines. If there is, then support RTF staff in measure development – Provide expert opinion on uncertain parameters – Review methodology – Discuss the impact of incentive programs on measure adoption 4

Summary of Last Meeting and Subsequent RTF Staff Work [slide 1] Quantec study from 2003 to 2005 remains the best study we have on SIS impacts Issues with baseline, small sample size, limited geographic range Subcommittee agreed that the 10% savings (from inefficient irrigation to SIS) was reasonable, but could not confirm that is was reliable for the region. Baseline - many farms are already using efficient irrigation practices, but this varies considerably by – Geographic location – Crop type (and variety) – Farm size 5 Savings may be greater than 20% or may be negative

Summary of Last Meeting and Subsequent RTF Staff Work [slide 2] Baseline can be estimated from analysis of Farm and Ranch Irrigation Survey (2003 and or 2008), but further adjustment would need to be made for the influence program activity. Subcommittee was not sure of how to adjust baseline to reflect program activity Programs have been active for decades, and re-participation is significant. – We don’t know what growers would do in the absence of programs 6

Summary of Last Meeting and Subsequent RTF Staff Work [slide 3] RTF staff conclusion: We don’t have enough information to reliably estimate the savings from SIS, as required for a proven RTF measure. – Our estimates of savings from inefficient irrigation to SIS is considerably uncertainty – Because of the significant levels of re-participation, most savings are based on an assumption about what previous participants would reverts to if the program were removed. We have no data to support these assumptions. 7

RTF Staff Proposal A provisional measure could be developed with a data collection plan that supports an eventual proven measure. The provisional measure would require explicitly excluding re- participation, so that the baseline (no SIS incentives) irrigation levels could be observed. – For existing participants, observe irrigation levels (relative to “ideal”) during program and after (couple with crop type and ET data) (“post-pre”) – For new participant, observe irrigation levels before program and during program (“pre- post”) – Persistence of efficient irrigation practices would argue for a longer measure life 8

Proposed Provisional Approach [slide 1] Proposed Simplest Reliable Method Water savings = [ideal water consumption] x [SIS savings %] x [ 1 – baseline SIS saturation] Ideal water consumption: consultant reported water consumption during program year SIS savings %: 10% Baseline SIS saturation: unadjusted saturation of efficient irrigation practices, as determined by analysis of FRIS data Best Practice Method Water savings = [ideal water consumption]x[Program savings %] Ideal water consumption: ET-based water-balance model (using AgriMet or other), specific to crop type, soil type, location – The method for estimating ideal water consumption must be applicable to all years, not just years of participation. This is why consultant-reported consumption would not work here. Program savings % – For new participants, savings is the difference in expected normalized irrigation levels pre-program and during-program “Normalized”: expressed as a % of ideal consumption level Expected level: as a function of crop type, location, farm size, [other variables], based on data collected as part of provisional protocol – For re-participants, savings is the difference in expected normalized irrigation levels post-program and during program 9

Proposed Provisional Approach [slide 2] Required data collection Irrigation system specifications (see draft Calculator) Geographic location (same categorization as ET data) Farm size (total acres and irrigated acres) Annual data: for 2 years pre-program (if available), program year(s), and 2 years post- program – Crop type and variety – Annual pump kWh – Any modifications made to system: EE measures, equipment replacement, change in # of irrigated acres – Location-based ET data Participation year data: consultant reported volume of water consumption and ET model data Eligibility Farm that has not received an SIS incentive in the past three years [NEW CRITERIA] Must be in area with excess water capacity 10

Proposed Provisional Approach [slide 3] Provisional data collection will allow us to answer several questions: Impact of SIS-program on previously non-participants What participants revert to in the absence of program incentives How closely measured water consumption (consultant report) matches kWh-based estimates How closely measured water consumption (consultant report) matches ET-based modeled estimates 11

Discussion and Next Steps 12